Summary
Overview
Work History
Education
Skills
KEY RESPONSIBILITY
Software
Timeline
Generic
KRISHAN BHUSHAN PANDEY

KRISHAN BHUSHAN PANDEY

MEPF Project Manager
Bengaluru

Summary

Focused & Dedicated MEPF Project Manager with over 15 years of hands-on experience in successfully executing complex Mechanical, Electrical, Plumbing, and Firefighting projects. Highly skilled in end-to-end project execution — from planning, resource deployment, and coordination to commissioning and handover. Proven ability to manage multidisciplinary teams, ensure strict adherence to quality, safety, and regulatory standards, and deliver projects within time and budget. Known for a practical, execution-focused approach, strong problem-solving abilities, and commitment to driving performance through on-site leadership and team empowerment.

Overview

13
13
years of professional experience
2
2
Languages

Work History

Senior MEPF Project Manager

UNIQUE ENGINEERS LIMITED
01.2017 - Current

Unique Engineers Limited (UEL) is a leading engineering services firm operating since 1992, specializing in MEPF project execution and integrated infrastructure solutions. With a pan-India presence, the company has successfully delivered projects across industrial, commercial, and institutional sectors. Backed by a skilled team and robust project management systems, it ensures quality, safety, and compliance at every stage.


Key Projects Handled for UEL:

  • FOXCONN, BENGALURU (April '2024- Till Date) WORK SCOPE: Complete MEPF Package + Interior Work, Project Cost: 500 Crore +
  • MOPA INTERNATIONAL AIRPORT , GOA (2019- 2023) WORK SCOPE: Complete MEPF Package, Project Cost: 150 Crore +
  • BITSoM (Bits School of Management), Mumbai (2022- 2024) WORK SCOPE: Complete MEPF Package, Project Cost: 50 Crore +
  • STT Data Center, Navi Mumbai (2023- 2024) WORK SCOPE: Centralised HVAC System, Project Cost: 25 Crore +
  • BITS Pilani ( Goa Campus) (2020- 2022) WORK SCOPE: Complete MEPF Package, Project Cost: 20 Crore +
  • Successfully managed the above projects through strategic planning and execution, effective task prioritization, optimal resource utilization, and alignment with organizational objectives.

Assistant Manager - MEP Project

ADVANCE EPC CONTRACTS PRIVATE LIMITED
03.2016 - 12.2016

Key Project Handled:

  • REC WORLD HEADQUARTERS , GURGAON WORK SCOPE: Electrical, Plumbing & Fire Fighting, Project Cost: 20 Crore +

Senior Project Engineer

SUDHIR POWER PROJECTS LIMITED
06.2014 - 02.2016
  • NOIDA ONE CYBER PARK SCOPE: Electrical Value: 25 Crore

Project Engineer

IDEAL POWER PRIVATE LIMITED
01.2013 - 05.2014
  • PARAS BUILDTECH NOIDA SCOPE: Electrical Value: 10 Crore

Education

Bachelor - B.Tech (Electrical)

Uttar PradeshTechnical University (UPTU)
Uttar Pradesh, India
04.2001 -

Skills

  • Project Planning & Coordination
  • Contract & Vendor Management
  • Material Procurement & Inventory Control
  • Project Budgeting & Cost Control
  • Project Designing and Review
  • Issue Resolution & Technical Troubleshooting

  • Team Leadership & Workforce Management
  • Regulatory & Safety Compliance
  • Quality Assurance & Control (QA/QC)
  • Project Commissioning & Final Handover
  • Defects Liability Period (DLP) & Maintenance Management

KEY RESPONSIBILITY

Key Responsibilities – MEPF Project Manager
  • Overseeing day-to-day project execution activities, including detailed project planning, material planning, and resource scheduling.
  • Setting daily, weekly, and monthly targets; monitoring progress and ensuring alignment with project timelines and quality standards.
  • Managing installation and commissioning of electrical infrastructure such as Ring Main Units (RMUs), HT Panels, Transformers, HT cabling, and Sub-station equipment.
  • Supervising submain wiring, conduit laying, and LT cabling works including installation of LT Panels, Distribution Boards, and cable trays.
  • Executing installation of Rising Mains and Bus Ducts (Compact Sandwich Type) as per design and safety standards.
  • Implementing lighting protection systems, lighting fixtures, ceiling fans, and related internal electrical works.
  • Coordinating and managing infra-level fire fighting and plumbing works including piping, hydrants, and sprinkler networks.
  • Overseeing installation of hydro-pneumatic systems, fire pumps, and associated infrastructure pipeline works.
  • Managing installation of Fire Alarm Systems (FAS), Public Address (PA) systems, and low-voltage works including wiring for telephone, intercom, data, and TV with MS conduit.
  • Planning and deploying manpower efficiently; ensuring optimum utilization of labor and equipment at site.
  • Preparing measurement sheets, tracking project quantities, and generating client bills for MEPF scope of works.
  • Handling site-level material logistics including receipt, storage, movement, and allocation of materials.
  • Generating detailed weekly and monthly progress reports; preparing execution schedules in coordination with client and internal stakeholders.
  • Ensuring cross-disciplinary coordination with HVAC, fire protection, civil, and structural teams for smooth execution and interface management.
  • Identifying deviations in project timelines or material schedules and initiating timely corrective actions.

Software

Microsoft Excel Advance

PowerPoint Presentation

AutoCad

Timeline

Senior MEPF Project Manager

UNIQUE ENGINEERS LIMITED
01.2017 - Current

Assistant Manager - MEP Project

ADVANCE EPC CONTRACTS PRIVATE LIMITED
03.2016 - 12.2016

Senior Project Engineer

SUDHIR POWER PROJECTS LIMITED
06.2014 - 02.2016

Project Engineer

IDEAL POWER PRIVATE LIMITED
01.2013 - 05.2014

Bachelor - B.Tech (Electrical)

Uttar PradeshTechnical University (UPTU)
04.2001 -
KRISHAN BHUSHAN PANDEYMEPF Project Manager