To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.
Overview
11
11
years of professional experience
Work History
Dimensional Engineer
Satyam Venture Engineering Services Private
Chennai, TamilNadu
2015 - Current
Assembly flow preparation for BIW with Supplier and BCE
Defining Locator Datum for BIW Parts (Panel) and Assembly strategy based on 3-2-1 principles and GD&T
Measurement points selection for vehicle line to validate design intent through Fit & Finish with Gap/Flush, Seal gap studies with sections
Define Battery tray Locators and measurement points for EV programs
Working with CFT team for various programs and regions for Launch Vehicles
Valuation of GMR (Global Manufacturing Requirements), Generics, and
Ford Global Standards of CAD and update for CFT team to made changes
Stack-up tolerance study for BIW Parts and assemblies
Identified and developed DET (Efficiency project) to Improve process
Quality PIT member for ISO audit support and problem analysis to fix issue
Define business logics for concerns arise in Digital Production which is control by Automation.
Engineer
JBM Auto System Pvt Ltd
04.2012 - 08.2015
Support for project from RFQ to SOP
Reviewed technical drawings developed by CAD technicians and drafters
Bill of Material (BOM) preparation for supported parts and assemblies
Documentation of ECN changes and follow up Suppliers and Toolmakers
Document APQP & PPAP, also Planning and Ensure PSW (Part Sign off/warranty) approval from customer
Process defining for Die and Fixtures in Stamping level and Assemblies
Analyzing material size for panel with help of Auto Form
Perform Tool Trial & Tool Buy-off for In-house part and Assemblies as well Tool Makers and supplier’s end
Facility readiness for Welding Line setup and Poke-Yoke implementation in critical systems & R&R study on gauges and proving same
Responsible for sorting of quality issues through AIMS by G8D methodology
VA/VE /POKA YOKE for Quality issues to control repeated issues
Prepared action plans for problematic processes and assets