Motivated and responsible Assistant Engineer with 2 years of experience working in a team alongside engineers and technicians. Great judgment, organizational and communication skills developed through past work experiences in this field. Experienced in preparing detailed calculations, designs, and drawings. Adept in design reviews and preparing technical reports.
SFMC Riyadh Structure Validation (29th Jan 2020 to current)
Sector: Healthcare
External End Client: The Ministry of Interior (MOI) of the Kingdom of Saudi Arabia (KSA)
Internal Client: Manens-Tifs
Security Forces Medical Centre Riyadh (SFMCR) rises to a maximum of 13 storeys, and is situated in Riyadh. SFMCR is an identical twin of SFMC Jeddah. The only difference is in the less rigorous requirement in seismic design.
KAFD 2 Structures Task (18th May 2020 to 2nd July 2020)
Sector: Mixed Use
Client: Rayadah Investment Company
KAFD refers to King Abdullah Financial District located in Riyadh, Saudi Arabia. It spans a surface area of 1.6 million square meters consisting of 34 towers.
SFMC Jeddah (6nd February 2020 to 4th March 2020)
Sector: Healthcare
External End Client: The Ministry of Interior (MOI) of the Kingdom of Saudi Arabia (KSA)
Internal Client: Manens-Tifs
Security Forces Medical Centre Jeddah (SFMCJ) rises to a maximum of 13 storeys, and is situated in Jeddah, KSA. It covers a total surface area of 2.5 million square meters. The design criteria is similar to that used in SFMC Riyadh development with the difference mainly in seismic design requirements which requires a special moment frame structure and more onerous ground conditions.
ETABS
undefined