Summary
Overview
Work History
Education
Skills
Certification
PERSONAL DETAILS
Timeline
Generic

Mahadev Chilhate

Parasia

Summary

I have over 17+ Years Experience in Construction of High Speed Rail (Bullet Train) Viaducts, Elevated Road Bridge, RE Wall, ROB & River Bridge. The nature of work involved construction of Bullet Train, National Highway & 8-6 lane Expressway Works. The duties Execution of Elevated Flyover, Bridge Construction, ROB, Pile, Foundation Pile Cap, Pier , Pier Cap, Pedestal, Girder Casting, Erection Work, Cast In Situ Slab, Stressing & PSC Girder construction activities i.e. earthwork in RE WALL and Structure concrete works in accordance with specifications of Ministry of Road Transport & Highways. I have experience/exposure of Planning, coordination and implementation of project site with in the decided-upon budget, timeline and scope. Also effectively monitor financial progress, client billing and monthly program of structure following the foundation sub structure and superstructure etc. Test of pile like CHSL, Pile integrity test and preparation of excavation work

Overview

17
17
years of professional experience
1
1
Certification

Work History

Assistant Construction Manager

Larsen & Toubro Ltd Heavy Civil
Vadodara
11.2022 - Current
  • Design and Construction of Civil and Building Works including Testing and Commissioning on Design Build for Double Line High Speed Railway Involving Viaducts, Bridges, Maintenance Depots and Stations Between Zarroli Village at Maharashtra-Gujarat Border and Vadodara from MAHSR Km 156.600 to MAHSR Km 393.700, for the Project of Construction of Mumbai – Ahmedabad High Speed Rail.
  • Package No. MAHSR –C-4 Section -5
  • Specialization in River Bridge and Viaducts construction like Elevated Flyover, Major Bridge, PSC Girder Casting and there stressing. And also experience of Pile Foundation, Pile Cap, Pier, Pier Cap, PSC Girder and stressing work MJB (Major bridge) at Vishwamitra River Bridge, Viaduct, VUP, LVUP ,Minor Bridge and Box culverts etc.
  • Responsible for construction of different items of Viaduct. Such as Pile Cap , Pier , Pier cap casting with Quality. Pile foundation also execute
  • Responsible for all reinforcement work and preparing BAR BENDING SCHEDULE of the same
  • Responsible for coordinating with consultant during the execution of the work.
  • Completely responsible for the preparation of program and achievement of targets as fixed by management on Weekly and monthly basis.
  • Responsible for making advance requirements of materials for the execution of the work.
  • Responsible to check SBC, by Dynamic load test, CHSL and PIT at Viaduct location for Foundation and got approval from consultant.
  • Responsible for Pile foundation Works construction of the above as per approval drawings and technical specification.
  • Leading a team of Engineers, Junior Engineers, Supervisors and others.
  • Managing all records of works of executed for claims interim payment.
  • Coordinating with the construction managers, plant managers, senior engineers, accounts, drawing and design section.

Manager Structure

PRA INDIA PRIVATE LTD
01.2022 - 10.2022
  • Construction of 06 lane Expressway under Bharat Mala Pariyojna Raipur Vishakhapatnam Economic corridor Greenfield access controlled (Hatibena Village to Badakumari) OD-2 ( ch 146.500 to 179.00) Distt Nabrangpur Odisha, India.
  • Specialization in Bridge construction like Elevated Flyover, Major Bridge, PSC Girder Casting and there stressing. And also experience of Pile Foundation,Pile Cap,Pier,Pier Cap, PSC Girder and stressing work,MJB (Major bridge) at Tel river, Viaduct,VUP , LVUP ,Minor Bridge and Box culverts etc.
  • Responsible for construction of different items of Major Bridge . Such as approach RE Wall panels casting with Quality. Open foundation also execute
  • Responsible for all reinforcement work and preparing BAR BENDING SCHEDULE of the same
  • Responsible for coordinating with consultant during the execution of the work.
  • Completely responsible for the preparation of programme and achievement of targets as fixed by management on Weekly and monthly basis.
  • Responsible for making advance requirements of materials for the execution of the work.
  • Responsible to check SBC, by dynamic load test at ROB location for Foundation and got approval from consultant.
  • Responsible for layout marking of MJB VUP ,LVUP ,C.D Works such as culverts, slab culverts and construction of the above as per approval drawings and technical specification.
  • Leading a team of Engineers, Junior Engineers, Supervisors and others.
  • Managing all records of works of executed for claims interim payment.
  • Coordinating with the construction managers, plant managers, senior engineers, accounts, drawing and design section.

Deputy Manager

G R INFRAPROJRCTS LTD
12.2020 - 01.2022
  • Construction of 08 lane Expressway under Bharatmala Pariyojna (Miyati Village to Gujrat Border) PKG-25 ( ch 222.00 to 244.100) Distt Jhabua Madhya Pradesh, India.
  • Specialization in Bridge construction like Elevated Flyover, Major Bridge, PSC Girder Casting and there stressing. And also experience of Pile Foundation, Pile Cap,Pier,Pier Cap, PSC Girder and stressing work (Major bridge) at Anas River, Viaduct, UP , LVUP ,Minor Bridge and Box culverts etc.
  • Responsible for construction of different items of Major Bridge . Such as approach RE Wall panels casting with Quality. Open foundation also execute
  • Responsible for all reinforcement work and preparing BAR BENDING SCHEDULE of the same
  • Responsible for coordinating with consultant during the execution of the work.
  • Completely responsible for the preparation of programme and achievement of targets as fixed by management on Weekly and monthly basis.
  • Responsible for making advance requirements of materials for the execution of the work.
  • Responsible to check SBC, by dynamic load test at ROB location for Foundation and got approval from consultant.
  • Responsible for layout marking of MJB VUP ,CUP ,C.D Works such as culverts, slab culverts and construction of the above as per approval drawings and technical specification.
  • Leading a team of Engineers, Junior Engineers, Supervisors and others.
  • Managing all records of works of executed for claims interim payment.
  • Coordinating with the construction managers, plant managers, senior engineers, accounts, drawing and design section.

Assistant Manager

Larsen & Toubro LTD
07.2019 - 11.2020
  • Construction of four lane highway Bar – Bilara – Jodhpur road project NH 112 ( ch 0.00 to 110.00) Rajasthan, India
  • Specialization in Railway over bridge & River Bridge, also a rich experience in RE WALL,MJB (Major bridge) at Loni River, VUP , LVUP ,Minor Bridge and Box culverts etc.
  • Responsible for construction of different items of ROB . Such as approach RE Wall panels casting with Quality. Open foundation also execute
  • Responsible for all reinforcement work and preparing BAR BENDING SCHEDULE of the same
  • Responsible for coordinating with consultant during the execution of the work.
  • Completely responsible for the preparation of programme and achievement of targets as fixed by management on Weekly and monthly basis.
  • Responsible for making advance requirements of materials for the execution of the work.
  • Responsible to check SBC, by dynamic load test at ROB location for Foundation and got approval from consultant.
  • Responsible for layout marking of ROB VUP ,CUP ,C.D Works such as culverts, slab culverts and construction of the above as per approval drawings and technical specification.
  • Leading a team of Engineers, Junior Engineers, Supervisors and others.
  • Managing all records of works of executed for claims interim payment.
  • Coordinating with the construction managers, plant managers, senior engineers, accounts, drawing and design section.

Asst. Manager

LARSEN & TOUBRO Ltd TIIC ECC DIVISION
10.2017 - 07.2019
  • Constructions, Operation and Maintenance of Existing Road from Km 199+200 to Km 311+000 on the Bahara Gura to singada ) of NH-6 in ODISHA and JHARKHAND by 4 Laning on "EPC" basis
  • Specialization in Execution and construction of Viaduct, Major bridge in heavy water logged area and casting of PSC GIDER and stressing work
  • Responsible for construction of different items of Express Highway. Such as GIRDER Type Major Bridge , minor bridge, box type minor bridge and box culverts pipe culverts Expressway furniture’s as per approved drawings and technical specifications
  • Responsible for coordinating with consultant during the execution of the work.
  • Completely responsible for the preparation of programme and achievement of targets as fixed by management on Weekly and monthly basis.
  • Responsible for all reinforcement work and preparing BAR BENDING SCHEDULE of the same
  • Responsible for making advance requirements of materials for the execution of the work.
  • Responsible to check SBC, by dynamic load test at ROB location for Foundation and got approval from consultant.
  • Responsible for layout marking of ROB VUP ,CUP ,C.D Works such as culverts, slab culverts and construction of the above as per approval drawings and technical specification.
  • Leading a team of Engineers, Junior Engineers, Supervisors and others.
  • Managing all records of works of executed for claims interim payment.
  • Coordinating with the construction managers, plant managers, senior engineers, accounts, drawing and design section.

SENIOR ENGINEER CIVIL

Larsen & Toubro Ltd TIIC ECC DIVISION
04.2014 - 09.2017
  • Design, Engineering ,Construction ,Operation and Maintenance of Km 03+700 to Km 167 SAMBHALPUR ROURKELA ROAD PROJECT SH-10 in the state of ODISHA
  • Specialization in Elevated Bridge with RS WALL EXECUTION (Km 83 VUP and Km 79 fly over RE WALL overall in height of RE wall 10M and length approximate 2 km).
  • Responsible for construction of RE wall by FLY ASH filling material as per approved drawings and technical specifications
  • Responsible for coordinating with consultant during the execution of the work.
  • Completely responsible for the preparation of programme and achievement of targets as fixed by management on Weekly and monthly basis.
  • Responsible for co-ordination with power plant engineers for supply fly ash and laying of the same.
  • Responsible for GEOGRID and Geotextile fixing at Re wall.
  • Responsible for making advance requirements of materials for the execution of the work.
  • Leading a team of Engineers, Junior Engineers, Supervisors and others.
  • Managing all records of works of executed for claims interim payment.

Engineer civil

LARSEN & TOUBRO Limited TIIC ECC DIVISION
05.2012 - 04.2014
  • Design,Engineering,Construction,Operation and Maintenance of Beawar Pali Pindwara from Km. 0.000 to Km 250 (Design Chainage) of NH-14 in the State of Rajasthan under NHAI on Build, Operate And Transfer (BOT) Basis.
  • Responsible for construction of different items of Express Highway. Such as Girder type Viaducts, Major bridge, minor bridges, VUP and box culverts and Expressway furniture’s as per approved drawings and technical specifications.
  • Responsible for coordinating with consultant during the execution of the work.
  • Completely responsible for the preparation of programme and achievement of targets as fixed by management on Weekly and monthly basis.
  • Responsible for all reinforcement work and prepare BBS of the same.
  • Responsible for making advance requirements of materials for the execution of the work.
  • Responsible for Sub contractor billing RFI closing and record the concrete pour record and DPR.
  • Responsible for layout marking of C.D Works such as hume pipe culverts, slab culverts and construction of the above as per approval drawings and technical specification.
  • Actively involved in RCC and PSC girder erection and management of the same.
  • Leading a team of sub contractor labours, Supervisors and others.
  • Coordinating with the construction managers, plant managers, senior engineers, accounts, drawing and design section.

Senior Engineer

SEW Infrastructure Ltd
02.2009 - 05.2012
  • NH-3 Four lane Highway Project ch 84.5 Khalghat to ch 167 Maharastra border
  • Preparation of BBS, execution of minor bridge and box culvert as a Junior Engineer civil
  • HPC ,Box Culvert , Slab culvert ,03 nos Box Type minor Bridge and 02 nos Deck slab Bridge executed by our team
  • Responsible for the geometric specifications as per the IRC codes.
  • Review of Sub Contractor’s Construction methodology.
  • Supervision of cross drainage works includes Causeways, Hume Pipe Culverts, and minor bridges.
  • Checking and submitting daily progress reports to our site in charge

DET AND Junior engineer

JMC Projects India Limited
07.2008 - 02.2009
  • Multy Stories Building Projects
  • Responsible for construction of different items of Express Highway. Such as Girder type Viaducts, Major bridge, minor bridges, VUP and box culverts and Expressway furniture’s as per approved drawings and technical specifications.
  • Responsible for coordinating with consultant during the execution of the work.
  • Completely responsible for the preparation of programme and achievement of targets as fixed by management on Weekly and monthly basis.
  • Responsible for all reinforcement work and prepare BBS of the same.
  • Responsible for making advance requirements of materials for the execution of the work.
  • Responsible for Sub contractor billing RFI closing and record the concrete pour record and DPR.
  • Responsible for layout marking of C.D Works such as hume pipe culverts, slab culverts and construction of the above as per approval drawings and technical specification.
  • Actively involved in RCC and PSC girder erection and management of the same.
  • Leading a team of sub contractor labours, Supervisors and others.
  • Coordinating with the construction managers, plant managers, senior engineers, accounts, drawing and design section.

Education

10th high school -

MP Bord Bhopal
Bhopal, MP
01.2003

12th higher secondary - undefined

MP Bord Bhopal
Bhopal, MP
01.2005

Diploma - Civil

RGPV Bhopal
Bhopal, MP
01.2008

IOSH Managing Safely Trainning - Occupational Health And Safety

Institution of Occupational Safety And Health
Wigston
06-2025

Post-Graduate Certificate - Construction Management

MIT School of Distance Education
Pune, India
11-2024

Skills

  • Team Handling , Coordinate direct with subcontractors and construction workers
  • Railway project RViaduct, River Bridge Construction & Elevated Bridge
  • Pile , Pile Cap, Pier , Pier Cap
  • Strong Technical knowledge of Construction method of Bridge and Viaducts Construction
  • Monitor daily construction activities to ensure adherence to project timelines and quality standards
  • Generate regular progress reports for stakeholders and senior leadership
  • Construction management
  • Review the progress of daily basis

Certification

I, the undersigned, certify that to the best of my knowledge and belief, these dates correctly describe qualifications and experience.

PERSONAL DETAILS

  • Name: Mahadev Chilhate
  • Date of Birth: 10.08.1987
  • Nationality: Indian
  • Educational: Diploma in civil engineering
  • Post Gradution Diploma in Construction Managment
  • Total Years of Experience: 17+ years Exp
  • Pass Port No : AD109883
  • Permanent Address: Mr. Mahadev chilhate S/o Sarje rao chilhate House no 257 railway colony Magjineline,parasia, Distt:- chhindwara Madhya Pradesh Mobile: +91-7978584114
  • Mail Id: mahadevchilhate@gmail.com
  • Present Address: 405 4th floor Dblock Akruti Life Style Vadsar Vadodara Gujarat 390010

Timeline

Assistant Construction Manager

Larsen & Toubro Ltd Heavy Civil
11.2022 - Current

Manager Structure

PRA INDIA PRIVATE LTD
01.2022 - 10.2022

Deputy Manager

G R INFRAPROJRCTS LTD
12.2020 - 01.2022

Assistant Manager

Larsen & Toubro LTD
07.2019 - 11.2020

Asst. Manager

LARSEN & TOUBRO Ltd TIIC ECC DIVISION
10.2017 - 07.2019

SENIOR ENGINEER CIVIL

Larsen & Toubro Ltd TIIC ECC DIVISION
04.2014 - 09.2017

Engineer civil

LARSEN & TOUBRO Limited TIIC ECC DIVISION
05.2012 - 04.2014

Senior Engineer

SEW Infrastructure Ltd
02.2009 - 05.2012

DET AND Junior engineer

JMC Projects India Limited
07.2008 - 02.2009

12th higher secondary - undefined

MP Bord Bhopal

Diploma - Civil

RGPV Bhopal

10th high school -

MP Bord Bhopal

IOSH Managing Safely Trainning - Occupational Health And Safety

Institution of Occupational Safety And Health

Post-Graduate Certificate - Construction Management

MIT School of Distance Education
Mahadev Chilhate