Summary
Overview
Work History
Education
Skills
Timeline
PERSONAL INFORMATION
Generic

MAHADEV NAIK

MEP
THANE,MAHARASHTRA

Summary

A versatile and ample experienced Professional in MEP related coordinating site activities like Execution and Planning with Design verification of Plumbing and Fire Fighting, HVAC with Electrical work associated of other MEP related works for Commercial building, high rated Hotels, Hospitals as well as for High Rise Residential Towers with multiple car parking podiums. Also dealing with Material procurement, Manpower planning, Making/Verifying shop drawings & As Built Drawings, Preparing BOQ with cost estimation etc. Have interacted with various Contractors, Architects, Consultants, Suppliers, Vendors & Clients. Successfully executed a variety of projects to their entire satisfaction, during my 23 years of professional career. Ready to devote my services with some reputed organizations like you.

Overview

34
34
years of professional experience
1
1
Language

Work History

MEP HEAD PROJECTS

DENSOL ENGINEERING PVT LTD.
MUMBAI
12.2025 - Current

23 years of professional experience in Plumbing & Firefighting, HVAC, Electrical works Industries and with other MEP related works in India.

  • KEY RESPONSIBILITIES AND ACCOUNTABILITIES OF THE ROLE
  • 1) Planning, Getting Executed work from Contractors, Design and implementation for MEP WORKS of Plumbing and Firefighting, Electrical, HVAC, LIFTS INSTALLATION activities as per High Rise Building Norms and as Local Body Authority specified details at Design.
  • 2) Design verification, Shop drawings and Material Technical Data Sheet approval.
  • 3) Leading team for execution and coordinating with contractors.
  • 4) Execution of Plumbing services including Landscape and Irrigation systems.
  • 5) Execution of Swimming Pool.
  • 6) Execution of Sewage Treatment plant (STP)
  • 7) Planning, coordinating and execution of entire project Infra work of all MEP Services like Sewer Line from Tower to STP and Municipals chambers, Rainwater Lines from tower to Storm Water drain and municipals connections, Water Supply lines from municipal connection to Towers, treated water lines from STP to Flushing tanks in tower. Electrical cabling c with chamber making and connecting to main Substation Rooms.
  • 8) Planning, design checking and execution of Fire Fighting Systems with Sprinkler and Hydrant piping in towers, flats, podiums, parking areas and external area with Pump Room. Preparing drawings and documents for CFO compliances.
  • 9) Fire Alarm systems.
  • 10) Temple MEP work execution and handing over.
  • 11) Project Execution with preparing as built drawings, handing over documents, Commissioning reports and final handing over to Facility Management for further operation.
  • 12) Implementation of the Performance Management Process
  • A) To Priorities execution tasks with effective management skills following documents and Methods to be used as guidelines.
  • 1) Check Quality Assurance Plan submitted by Contractor to understand the Responsibility of his team towards quality of work and commitment to follow the guidelines and rules and regulations while executing the project.
  • 2) Check Method statements submitted by contractors to understand correct procedure of installations.
  • 3) To check Safety Plan as per Project specific requirement to work in safety manners to avoid accidents at site.
  • 4) To check work completion micro schedules and main schedules to monitor the work whether it is going in right direction of schedule. This will help to keep track on project progress.
  • 5) To check Material delivery Schedule submitted by Contractor.
  • 6) To check whether contractor is submitting all statutory compliance documents for commercial and billing purposes to maintain his company’s cash flow
  • 13). Implementation of Reviewing and arranging Meetings.
  • A) Arrange weekly review progress meetings with Contractors to make follow up material delivery, work progress as per schedule.
  • B) Attend weekly Review meeting with site team to explain and coordinate with other interdependent services.
  • C) Conduct daily review meeting with site engineers and supervisors to monitor progress at site.
  • 14). Commercial Aspects and activities by site team.
  • B) To study commercial documents like Work Order to understand scope of works as per BOQ.
  • C) To check Contractor’s bill in time and send to Billing Department for further process. To help contract department while evaluating Extra items with proper quantifications.
  • D) To highlight any changes in contract documents.
  • Self-motivated, with a strong sense of personal responsibility.
  • Excellent communication skills, both verbal and written.
  • Proven ability to learn quickly and adapt to new situations.
  • Skilled at working independently and collaboratively in a team environment.
  • Worked well in a team setting, providing support and guidance.
  • Passionate about learning and committed to continual improvement.
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Assisted with day-to-day operations, working efficiently and productively with all team members.
  • Worked effectively in fast-paced environments.
  • Worked flexible hours across night, weekend, and holiday shifts.
  • Proved successful working within tight deadlines and a fast-paced environment.
  • Participated in team projects, demonstrating an ability to work collaboratively and effectively.

ASSISTANT GENERAL MANAGER (MEP) DESIGNATED AS AVP

PIRAMAL REALTY GROUP
MUMBAI
10.2022 - 12.2025
  • PROJECT—PIRAMAL VAIKUNTH THANE RESIDENTIAL PROJECT.
  • PROJECT DETAILS- 40 STORIED 4 TOWERS COMPLEX WITH BASEMENTS PLUS 6 PODIUMS.
  • Successfully completed all MEP works for 4 towers of 40 storied buildings with basement plus 6 podiums and handed over 800+ flats to customers.

ASSISTANT GENERAL MANAGER (MEP)

RUNWAL GROUP
MUMBAI
04.2021 - 10.2022
  • PROJECT—RUNWAL BLISS RESIDENTIAL PROJECT.
  • PROJECT DETAILS- 50 STORIED 5 TOWERS COMPLEX WITH BASEMENTS PLUS 4 PODIUMS
  • Developed and implemented new operational procedures, streamlining daily tasks and improving overall efficiency.
  • Improved employee morale through recognition programs that acknowledged individual achievements and team successes.

SENIOR MANAGER (ENGINEERING)

KOMAL ENGINEERING PVT LTD
MUMBAI
08.2020 - 04.2021
  • PROJECT—THE INDIAN FILMS COMBINE PVT LTD. (MAKERS MAXITY MALL)
  • Project details- Mall with Club house and PVR Cinemas.
  • Established strong relationships with clients and stakeholders, ensuring long-term partnerships and repeat business.
  • Improved team performance by providing comprehensive training and fostering a collaborative work environment.

SENIOR MANAGER (ENGINEERING) MEP

OBEROI REALTY LIMITED
MUMBAI
01.2015 - 06.2020
  • PROJECT—OBEROI ESQUIRE RESIDENTIAL PROJECT.
  • PROJECT DETAILS- 52 STORIED 3 TOWERS COMPLEX WITH 3 BASEMENTS PLUS 5 PODIUMS.
  • Improved team performance by providing comprehensive training and fostering a collaborative work environment.
  • Reviewed and analyzed reports, records and directives to obtain data required for planning department activities.
  • Evaluated vendor offerings critically to select the most appropriate partners for delivering desired results at optimal costs.
  • Developed and executed successful training program for junior managers, equipping them with essential leadership skills.

SR. MANAGER

STERLING AND WILSON LIMITED
MUMBAI
08.2011 - 12.2014
  • Planning & Execution of Plumbing & Fire Fighting activities as per approved shop drawings and preparing shop drawings as well as built drawings, technical submittals of materials as per specifications, Project Schedule updating, Material quantity take-off for ordering, Allocation of manpower, Making R A Bills etc.
  • List of Projects Executed
  • 1. NARAYAN HRIDAYALAYA HOSPITAL AHMEDABAD.
  • Planning and execution of 400 bed hospital with plumbing and Fire Fighting work.
  • Plumbing plant room with transfer pumps and Hydropneumatics systems.
  • Fire Fighting pump room installation with testing and commissioning.
  • Sewage treatment plant installation and commissioning.
  • Water treatment plant installation with testing and commissioning.
  • RO plant installation and commissioning.
  • Hot water system piping.
  • 2. HIRCO RESIDENTIAL PROJECT PANVEL (30 STORY BUILDING).
  • Execution and planning work of Plumbing work
  • 3. BOMBAY DYING (WIC) COMMERCIAL PROJECT AT PAREL MUMBAI.
  • 85% WORK COMPLETED FOR PLUMBING AND FIRE FIGHTING WORK WIYH PUMP ROOMS BUT PROJECT WAS STOPPED BY CLIENT DUE TO INTERNAL ISSUES OF CLIENT.
  • 4. AHUJA TOWER 55 STORY RES.PROJECT AT PRABHADEV MUMBAI –
  • Planning and execution of plumbing and Fire Fighting work.
  • Plumbing plant room with transfer pumps and Hydropneumatics systems.
  • Fire Fighting pump room installation with testing and commissioning.
  • Water treatment plant installation with testing and commissioning.
  • RO plant installation and commissioning.
  • 5 COLUMBIA ASIA HOSPITAL AHMEDABAD. -
  • COMPLETED PLUMBING AND FIRE FIGHTING WORK WITH COMMISIONED AND HANDED OVER TO CLIENT.
  • Planning and execution of 200 bed hospital with plumbing and Fire Fighting work.
  • Plumbing plant room with transfer pumps and Hydropneumatics systems.
  • Fire Fighting pump room installation with testing and commissioning.
  • Water treatment plant installation with testing and commissioning.
  • RO plant installation and commissioning.
  • Hot water system piping.
  • Established strong relationships with clients and stakeholders, ensuring long-term partnerships and repeat business.
  • Held monthly meetings to create business plans and workshops to drive successful business.
  • Provided strong leadership to enhance team productivity and morale.
  • Led cross-functional teams to achieve project milestones and deliver high-quality results.
  • Improved team performance by providing comprehensive training and fostering a collaborative work environment.
  • Managed budgets effectively, achieving financial objectives while maintaining strict control over expenditures.

PROJECT MANAGER

D.S. GUPTA CONSTRUCTION PVT. LTD. (ABHISHEK MILLENIUM CONTRACTS PVT. LTD.)
MUMBAI
03.2003 - 07.2011
  • EXECUTION OF PLUMBING AND FIRE FIGTING JOBS.
  • List of Projects Executed
  • 1. 36 Storied Residential Building Oberoi Construction in Lokhandwala Complex Andheri Mumbai Plumbing work with External Sewage work and Internal Plumbing works for Sample Flats.
  • 2. Oberoi Chambers Commercial Complex in Lokhandwala Complex Andheri Mumbai. Executed Plumbing work with External drainage and water supply.
  • 3. Hiranandani Hospital Powai Mumbai for Hiranandani Group. Execution and Billing of Plumbing and Fire Fighting work with handing over.
  • 4. Winchester Technology Park commercial building for Hiranandani Powai. Execution of Plumbing and Firefighting work. One of the fastest Project completed in three months.
  • 5. Powai Plaza commercial building for Hiranandani Powai. Execution of Firefighting work.
  • 6. Hiranandani school Powai Plumbing and Firefighting work.
  • 7. Zenta call center Powai Plumbing work.
  • 8. E- Serve Tech Park for Citi Group at Goregaon Mumbai. Execution of Plumbing and Firefighting work.
  • 9. NEO Pharma Commercial Project for Kalpataru group at Vakola Mumbai Plumbing work.
  • . Kodak group of company at Vakola.
  • 10. Tunga Regal 4-star Hotel at M I D C Andheri Mumbai. Execution of Plumbing and Firefighting work with Testing, Commissioning and Handing over.
  • 11. Completed Grand Hyatt 5-star Hotel Project at Goa for DB Realty as a Project In charge largest Hotel Project with 400 Rooms Suits, Swimming pool, Service building with SPA and all types of Kitchen and Restaurants.
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Identified plans and resources required to meet project goals and objectives.
  • Planned, designed, and scheduled phases for large projects.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Coordinated cross-functional teams and resolved conflicts, maintaining a positive work environment throughout the project lifecycle.

MEHANICAL ENGINEER

ALL LISTED BELOW
MUMBAI
10.1991 - 03.2002
  • Worked at Himco India Ltd a Group Kamat Hotels and Resorts Ltd. The Project of Lotus Suits (VIT’S) at Marol Mumbai as a Project engineer looking towards MEP works and Billing for one year.
  • Worked at Soham’s Foundation and Engineering works as a Purchase and Maintenance Engineer.
  • Worked at M/s Rashmi Fabricator for one year as a Production Engineer.
  • Worked at own Fabrication shop named Ganesh Welding Works for four years and closed due to Market crisis, slow down and heavy loss due to flood hit in workshop.
  • Worked as a Maintenance Engineer at Bhavnani and Sons Pvt Ltd. Kurla Mumbai. Manufacturer of Adhesive tapes.
  • Worked with M/s Afco Industrial and Chemical Ltd a group of Bombay Dying for one and half years as a Production Engineer at Kanjurmarg Mumbai.
  • Worked as a Trainee Engineer at M/S MAHINDRA AND MAHINDRA TRACTOR LTD Kandivali Mumbai for six months on main line assembly of Tractors which is part of Diploma course.
  • Worked as a Trainee Engineer at M/S GODREJ AND BOYCE MFG CO LTD for six months which is part of Diploma course
  • Planned [Number] [Type] projects from beginning to end, focusing on timelines, budgets and mechanical feasibility.
  • Created, prototyped and tested [Type] systems for [Number] clients.

Education

Diploma - Mechanical Engineering

V J T I MUMBAI
Mumbai

Skills

MS-Excel & MS- Word, Basic knowledge on AUTO CAD

Knowledge on AUTO CAD

Timeline

MEP HEAD PROJECTS

DENSOL ENGINEERING PVT LTD.
12.2025 - Current

ASSISTANT GENERAL MANAGER (MEP) DESIGNATED AS AVP

PIRAMAL REALTY GROUP
10.2022 - 12.2025

ASSISTANT GENERAL MANAGER (MEP)

RUNWAL GROUP
04.2021 - 10.2022

SENIOR MANAGER (ENGINEERING)

KOMAL ENGINEERING PVT LTD
08.2020 - 04.2021

SENIOR MANAGER (ENGINEERING) MEP

OBEROI REALTY LIMITED
01.2015 - 06.2020

SR. MANAGER

STERLING AND WILSON LIMITED
08.2011 - 12.2014

PROJECT MANAGER

D.S. GUPTA CONSTRUCTION PVT. LTD. (ABHISHEK MILLENIUM CONTRACTS PVT. LTD.)
03.2003 - 07.2011

MEHANICAL ENGINEER

ALL LISTED BELOW
10.1991 - 03.2002

Diploma - Mechanical Engineering

V J T I MUMBAI

PERSONAL INFORMATION

Current Location: - Mumbai Contact Number: -9768046159 EDUCATIONAL QUALIFICATION.: DIPLOMA IN MECHANICAL ENGINEERING FROM V J T I MUMBAI. COMPUTER EXPOSURE; MS-Excel & MS- Word, Basic knowledge on AUTO CAD. Basic knowledge on AUTO CAD. PERSONAL DETAILS Full Name: MAHADEV SHIVAJI NAIK Father’s Name: SHIVAJI M NAIK Nationality: Indian Date of birth: 20TH JUNE 1972 Marital Status: MARRIED Language proficiency: ENGLISH, MARATHI, HINDI, KANNADA. I hereby confirm that the above-mentioned details are true to the best of my knowledge. Place: - Mumbai Date: - MAHADEV S NAIK
MAHADEV NAIKMEP