Roles and responsibilities
- Create and maintain the product bill of materials, and ensure the design release/changes are implemented across products/plants.
- Creation of material, info record, source list, MRP area, storage location, and global transfer price.
- Understand and analyze the design changes, and verify the accuracy and completeness of the BOM before the product implementation.
- Reduced the manual execution using Automate Studio (Win Shuttle) for bulk enrichment.
- Global phase-in, phase-out, and replacement activities were conducted per established transfer frameworks.
- Roles and responsibilities in ECM:
- Creation and handling of Problem Reports, Change Requests, and Change Notices for all design and service changes through PDM Link Windchill.
- Responsible for resolving IT support tickets related to Material MDM in SAP.
- Responsible for creating, implementing, and maintaining a master data management solution that enables users to optimize system capabilities.
- Collaborating with requestors to understand their needs and resolve their issues based on the requirements through ECM.
- Ensuring effective change execution control to enable real-time status reporting of specific changes to both internal and external stakeholders.
- Roles and responsibilities in Tower Transport Equipment:
- Enrich the list of Tower attributes and Transport Equipment attributes with Tower MSI sections, and transfer to SAP.
- Used VMS and TML to get the respective TWDI and TAD for the tower sections.
- Filling in master data on active tower sections through information that must be obtained by an analytic approach.
- Responsible for updating the attributes, consumable, and returnable kitsets. Updated UNSPSC, trace code, and mass for each tower section during the revision.
- Conduct cross-functional reviews with main stakeholders. Conduct weekly status meetings.
- Responsible for extending the consumable kitsets to the production plant in SAP.
- Carried out a BOM update with the addition of consumable kitsets to the enriched tower sections in SAP for the respective production plant.