Dedicated Electrical Engineer with over 8 years of professional experience and a Master's degree in Power Systems Engineering. Proven expertise in sizing electrical equipment, preparing specifications and conducting power system studies using tools like ETAP. Successful track record in detailed engineering across diverse projects, including Nuclear Fusion, Thermal Power plants, Sewage Water Treatment plants, and IT Parks. Notably, contributed significantly to the ITER France project, the world's largest nuclear fusion initiative, for over four years. Recognized for meticulous attention to detail, proactive teamwork promotion, and consistent adherence to company, customer, and regulatory standards.
-Working as a lead engineer for the Auxiliary Electrical System of HVDC Projects at GE Vernova
Green Hydrogen Project at Vernon, South California, USA
Acting as the Electrical Lead Engineer for the 10MW Green Hydrogen Project in Vernon, South California, USA, I oversee a team of three members. My responsibilities align with US (NEC Standard) guidelines and include:
Pre-Bid Engineering Services for 2x800 MW KODERMA Thermal Power Station
Responsible for the Electrical design of Coal Handling Plant and Ash Handling Plant. Executed the following activities:
Preparation of MV Switchgear Feeder Lists.
Preparation of 415V Switchgear Feeder Lists
Preparation of MV Auxiliary Transformer Sizing document
Preparation of LT Aux Transformer Sizing document
Preparation of LT Cable BOQ
Preparation of HT Cable BOQ
Preparation of UPS Sizing document and Datasheets.
Electrical power distribution design inside ITER TOKAMAK Complex
During my tenure at ITER, I was involved in a wide range of key activities and responsibilities, contributing significantly to the Electrical Power Distribution design within the ITER TOKAMAK Complex in France. Here is a breakdown of my major contributions and achievements:
MV & LV Relay Setting Calculation and Overall Relay Co-ordination of Harduaganj Thermal Power Station Extension- II (1x660 MW), India
Pre-Bid Engineering Services for Dung Quat II 750MW Combined Cycle Power Plant in Quang Ngai, Vietnam
Prepared technical specifications for various types of equipment such as:
- Generator Step-Up Transformer (GSUT)
- Unit Auxiliary Transformer (UAT)
- Generator Circuit Breakers
- Control & Protection Panel.
Deepak Phenolics's 30MW Captive Power Plant for Phenol Plant in Dahej, India
2x132MW 9E Power Plant Project, Aden, Yemen
Electrical System Studies for Entire LV AC systems of Margam D, Phase -3 Power Plant Life Extension Project (PPLEP) at Port Talbot Works, Tata Steel Strip Products UK.
Pre-Bid Engineering Services for the 1000 MW (2X500 MW) PULVERISED COAL FIRED POWER PLANT in Pangasinan, Philippines
Prepared technical specifications for various types of equipment such as:
-Generator Step-Up Transformer
(GSUT)
-Unit Auxiliary Transformer (UAT)
-Generator Circuit Breakers
-Control & Protection Panel.
MASINLOC POWER PLANT EXPANSION PROJECT, Barangay Bani,
Philippines.
-230kV Gas Insulated Substations
(Control and Protection)
-Generator Step Up Transformer
-Unit Auxiliary Transformer
-Generator Circuit Breaker Cubicle
-Generator Protection Panel
-7.2kV switchgear
-Auxiliary LV Switchgear
-Motor Control Centers.
-230kV GIS Circuit Breakers,
-230kV Disconnecting Switches,
-230kV Earthing Switches
-GSUT Protection Panel
-UAT Protection Panel
-Generator Circuit Breaker (GCB
-GCB Disconnecting and Earthing Switches,
-7.2kV MV Switchgear (Two Incomer and Bus coupler
Configuration), and LV Switchgear (Two Incomer and
Bus coupler Configuration) from Transformer
Development of Wipro IT Park at Gopanpally, India
Sulaibiya 600 MLD Wastewater Treatment & Reclamation Plant
(UF & RO Technology) – Expansion, Kuwait
Post Graduate Engineering Trainee at TATA Consulting Engineers Limited
ETAP Electrical Power System Studies
Extensive Caneco-Bt Software Knowledge
Wiring Schematics
Technical Specification preparation & Vendor Drawing review
Effective decision-making abilities
Microsoft Excel
Participated in 'Low Voltage Switchgear training (On-site)' at 'L&T Switchgear Training Centre'.