Saleem Hussain M.M

Chennai

Summary

o A result oriented professional with 14 + years of overall experience in construction industry and sound knowledge on Underground Metro Rail Project construction with 12+ years of experience.

o Experience in construction of underground Metro Rail station structures like Diaphragm Wall, secant piling, Slabs at different levels, plunge/kingpost, temporary traffic Decking works, Architectural finishes for operational rooms and Instrumentation and Monitoring (I&M) for cut & cover and NATM Methods.

o Monitor the progress of the works against the approved Baseline program, record the actual start and finish dates of activities and highlight to CRE of any delays to the activities on the critical path.

o Assisting CRE in Verification and confirmation the accuracy of the Interim Payment certificates submitted by the Contractor as per contract price center bifurcation and variation order (VO).

Overview

16
16
years of professional experience
1
1
Certification

Work History

Senior Deputy Resident Engineer

AECOM
06.2022 - Current

o Name of Project: CMRL Phase II - Corridor 4 – UG02: Construction of under ground stations at Boatclub, Nandanam, Panagalpark and Kodambakkam including underground cross over at panagal park station and associated twin tunnel

o Cost: INR 1846 Cr

o Client: Chennai Metro Rail Limited (CMRL)

Organisation Experience:

  • Inspection & Supervision of Underground Metro Rail Station work by Top-Down/Bottom-Up of station box construction by Cut and Cover method
  • Develop disciplines of construction schedules and monitors progress
  • Monitors material procurement and deliveries to ensure timelines in support of construction activities and schedule within the assigned discipline
  • Review of Construction Methodology, Standard operating procedures and other relevant documents submitted by Contractor of different activities involved in Station construction as per Contractual requirements
  • Assisting Resident Engineer in Review and drafting of correspondence letters received from Contractor/Client/external agencies on claims Review and monitor of DWP, 3 months and 3 weeks rolling programs
  • Assisting RE in Verification and confirmation the accuracy of the Interim Payment certificates and variation claims submitted by the Contractor.

Resident Engineer / Senior Engineer

AECOM
12.2016 - 05.2022

o Name of Project: Mumbai Metro Rail Project, Line-3 from COLABA-BANDRA-SEEPZ (33.5Km long Underground Metro Rail project)

o Cost: INR 23,136 Cr

o Client: Mumbai Metro Rail Corporation Ltd (MMRCL)

Organisation Experience:

  • Inspection & Supervision of Underground Metro Rail Station work by Top-Down/Bottom-Up of station box construction by Cut and Cover and NATM method
  • Develop disciplines of construction schedules and monitors progress
  • Monitors material procurement and deliveries to ensure timelines in support of construction activities and schedule within the assigned discipline
  • Review of Construction Methodology, Standard operating procedures and other relevant documents submitted by Contractor of different activities involved in Station construction (Cut & Cover and Natm) as per Contractual requirements
  • Involved in Interface Meetings and review of contractors coordination forms and Interface specification forms (b/w Civil and System) and resolve issues timely by discussing with concern party
  • Review of Station Coordination Installation Plans (SCIP) to provide access dates to SWCs
  • Assisting Chief Resident Engineer in Review and drafting of correspondence letters received from Contractor/Client/external agencies on claims and slow pace of works as per submission DWP or Master program and 3 months rolling programs
  • Assisting CRE in Verification and confirmation the accuracy of the Interim Payment certificates and variation claims submitted by the Contractor; and the Cost Control Team will recommend payment based on criteria given in the Contract price center bifurcation.

Assistant Engineer

BMRCL (Banaglore Metro Rail Corporation Limited)
04.2016 - 12.2016

o Name of Project: Kempegouda Majestic Under Ground Metro Rail station (Interchange station)

o Cost: INR 272.00 Cr

o Client: Bangalore Metro Rail Corporation Limited (BMRCL)

Majestic station is the largest metro station in India & Asia's 2nd biggest station. It has three levels with a total surface area of 48,000 square metres. The station platform is 365 metres long for the Purple Line, and 300 metres long for the Green Line. The station's platforms are designed to handle 20,000 commuters at any given time

Organization Experience:

  • Inspection & supervision of finishing works of operational rooms involved in Metro station
  • Proper Liasoning with Govt./private agencies of Utilities for timely completion of activity within project scheduled timeline.

Senior Engineer

AFCONS (shapoorji pallonji Groups)(Transtonnelstroy-Afcons JV)
01.2015 - 07.2015

o Name of Project: Package: UAA-05, Corridor 2 including 4 underground stations and associated Bored Tunnels about 3,640m twin tunnels.

o Cost: INR 1031.00 Cr

o Client: Chennai Metro Rail Limited (CMRL)

Organisation Experience:

  • Construction & supervision of various types of structures involve in station activities like Diaphragm wall, Roof, Concourse, Base slab, plunge column & Ancilllary Building works by Top-Down/Bottom-Up (Cut & Cover Method)
  • Execution & supervision work for fabrication of reinforcement works like D.wall cage, slabs at different levels (as per approved drawing) & plunge column Barrettes works
  • Preparation of Bar bending Schedule (BBS) and implementation of proper quality control, safety norms & construction procedures for all site works involved in station box construction.

Senior Engineer

Hindustan Construction Company (HCC) (HCC Samsung JV)
08.2013 - 10.2014

o Name of Project: Package:CC-34 (phase-3), Design and Construction of 3 underground stations and crossover by cut & cover method and associated tunnels about 8.70 Km

o Cost: 865.98 Cr

o Client: Delhi Metro Rail Corporation (DMRC)

Organization Experience:

  • Construction & supervision of various types of structures involve in station activities like Diaphragm wall, Roof, Concourse, Base slab, plunge column & Ancillary Building works
  • Preparation of Bar bending Schedule (BBS) and implementation of proper quality control, safety norms & construction procedures for all activities
  • Preparation of Material Reconciliation (Steel, Concrete & Bulk material) & raising Material request (MRs)
  • Preparation of Daily, Weekly and Monthly progress reports
  • Get R.F.I.s (Request For Inspection) cleared mutually and timely with Client/Consultants.

Engineer

Larsen & Toubro Construction (L&T SUCG JV)
03.2011 - 06.2013

o Name of Project: Package UAA-04 - Corridor 2 including 3 underground stations and associated Bored Tunnel about 3,350m twin tunnels.

o Cost: INR 930.80 Cr

o Client: Chennai Metro Rail Limited (CMRL)

Organization Experience:

  • Construction & supervision of various types of structures involve in station activities like Diaphragm wall, Roof, Concourse, Base slab, plunge column & Ancilllary Building works
  • Execution & supervision work for fabrication of reinforcement works like D.wall cage, slabs at different levels (as per approved drawing) & plunge column Barrettes works
  • Successfully completion of Utility diversion by trenchless technology methods for 900mm dia water line, 600 mm dia SWD line, 200mm dia sewer line & 150mm dia water line
  • Preparation of Daily, Weekly and Monthly progress reports and Preparation of Material Reconciliation (Steel, Concrete & Bulk material)
  • Knowledge about geotechnical soil investigations tests like Bore hole test, DCPT & Triple core bore hole test
  • Construction and supervision of pavement in different stages as per traffic management plan required for station construction activity works.

Technical Resource Person / Engineering Consultant

MGNRGS, A.P Rural Development Dept.
01.2010 - 02.2011

Organization Experience:

Ø To check measure the measurements recorded in M book. To ensure quality of work executed such as Check dams, Minor irrigation projects like Percolation tanks (PT) etc.

Trainee Engineer /Apprentice

Larsen & Toubro Limited
06.2008 - 07.2009

Ø Name of Project: i) Sree Ramireddy Water Supply Project, Madakasira; ii) Underground Drainage system (UGDS), Tadipathri.

Organization Experience:

Ø Site executions of various types of structures like Pump Houses, Sumps etc. involved in Water Supply Project.

Ø Have involved in the construction of Under Ground Drainage System (UGDS) structures such as Sewerage Treatment Plant (STP) of 8MLD and 4MLD, main line with RCC and SWG pipe-line, Distribution line with PVC pipe-line and Brick chambers with house connections.

Education

Bachelor of Technology - Civil Engineering

Jawaharlal Nehru Technological University
Hyderabad, India
05.2008

High School Diploma -

Board of Intermediate Education
Andhra Pradesh
04.2004

Skills

  • Autocad
  • Staad-Pro
  • 3Ds Max
  • MS Office word/excel/ppt
  • Building Information Modelling (BIM)
  • TILOS

Languages

English
Hindi
Telugu
Urdu

Career Development

  • Project - 8, 06/2022, present, Senior Deputy Resident Engineer (Sr.DRE), AECOM, Chennai, India, CMRL Phase II - Corridor 4 – UG02: Construction of under ground stations at Boatclub, Nandanam, Panagalpark and Kodambakkam including underground cross over at panagal park station and associated twin tunnel, INR 1846 Cr, Chennai Metro Rail Limited (CMRL)
  • Project - 7, 12/2016, 05/2022, Senior Engineer, AECOM, Mumbai, India, Mumbai Metro Rail Project, Line-3 from COLABA-BANDRA-SEEPZ (33.5Km long Underground Metro Rail project), INR 23,136 Cr, Mumbai Metro Rail Corporation Ltd (MMRCL)
  • Project - 6, 04/2016, 12/2016, Assistant Engineer (AE), BMRCL (Banaglore Metro Rail Corporation Limited), Bangalore, India, Kempegouda Majestic Under Ground Metro Rail station (Interchange station), INR 272.00 Cr, Bangalore Metro Rail Corporation Limited (BMRCL)
  • Project - 5, 01/2015, 07/2015, Senior Engineer, AFCONS (shapoorji pallonji Groups)(Transtonnelstroy-Afcons JV), Chennai, India, Package: UAA-05, Corridor 2 including 4 underground stations and associated Bored Tunnels about 3,640m twin tunnels, INR 1031.00 Cr, Chennai Metro Rail Limited (CMRL)
  • Project - 4, 08/2013, 10/2014, Senior Engineer, Hindustan Construction Company (HCC) (HCC Samsung JV), New Delhi, India, Package:CC-34 (phase-3), Design and Construction of 3 underground stations and crossover by cut & cover method and associated tunnels about 8.70 Km, 865.98 Cr, Delhi Metro Rail Corporation (DMRC)
  • Project - 3, 03/2011, 06/2013, Engineer, Larsen & Toubro Construction (L&T SUCG JV), Chennai, India, Package UAA-04 - Corridor 2 including 3 underground stations and associated Bored Tunnel about 3,350m twin tunnels, INR 930.80 Cr, Chennai Metro Rail Limited (CMRL)
  • Project - 2, 01/2010, 02/2011, Technical Resource Person (TRP) / Engineering Consultant (EC), SSAAT(Social Audit, Accountability & Transparency) & MGNREGS (Mahatma Gandhi National Rural Employment Guarantee Scheme), Rural Development Dept. A.P
  • Project - 1, 06/2008, 07/2009, Apprentice, Larsen & Toubro Limited, Anantapur (A.P), i) Sree Ramireddy Water Supply Project, Madakasira. ii) Underground Drainage system (UGDS), Tadipathri

Key Learnings

  • Good Communication skills
  • Team Player
  • Good in Visualizing and Creativity

Personal Information

  • Passport Number: U1750471
  • Date of Birth: 03/29/1987
  • Address: D.No:1/202A, Ravoof Colony, Kothacheruvu(P), Sathysai (Dist), A.P, India, PIN: 515 133.

Awards

  • Received Appreciation letter from State Bank of India (SBI) on sense of honesty & integrity on money reversed and credited to true owners as erroneously credited to my account.
  • Received Award on Circle of Excellence from AECOM for Mumbai Metro Rail Project (MML3).
  • Received Outstanding Performance rating for the year 2018 and 2019 from AECOM in Mumbai Metro Rail Project (MML3)

Certification

Chartered Engineer (C.Eng.,) in Civil Engineering and Membership of the Institution of Engineers India (IEI)

Timeline

Senior Deputy Resident Engineer

AECOM
06.2022 - Current

Resident Engineer / Senior Engineer

AECOM
12.2016 - 05.2022

Assistant Engineer

BMRCL (Banaglore Metro Rail Corporation Limited)
04.2016 - 12.2016

Senior Engineer

AFCONS (shapoorji pallonji Groups)(Transtonnelstroy-Afcons JV)
01.2015 - 07.2015

Senior Engineer

Hindustan Construction Company (HCC) (HCC Samsung JV)
08.2013 - 10.2014

Engineer

Larsen & Toubro Construction (L&T SUCG JV)
03.2011 - 06.2013

Technical Resource Person / Engineering Consultant

MGNRGS, A.P Rural Development Dept.
01.2010 - 02.2011

Trainee Engineer /Apprentice

Larsen & Toubro Limited
06.2008 - 07.2009

Bachelor of Technology - Civil Engineering

Jawaharlal Nehru Technological University

High School Diploma -

Board of Intermediate Education