Summary
Overview
Work History
Education
Skills
Native
Disclaimer
Languages
Father'sname
Personal Information
Timeline
Generic
Satyanarayana Raju Kanumuri

Satyanarayana Raju Kanumuri

Summary

Satyanarayana Raju brings over 6+ years of experience infrastructure projects. Completed Projects include Roads, Elevated Corridor, Post & Pretension Works, Pile Foundations, Steel Structure Erection Composite Girder, PSE Girders Casting, Installation of Bearings Expansion Joints, Monitoring of Construction support of various types of structures.

Overview

11
11
years of professional experience

Work History

Deputy Resident Engineer

AECOM INDIA PVT LTD
05.2023 - Current
  • Construction of Elevated Viaduct of Approx
  • 12.431 km length from ((Ch:16178 m to 19296 m, Ch:22962 m to 30199 m, Ch: 31178m to 31241 m & Ch: 31657 m to 33710 m)) between CMBT Metro station (excluding station) and Puzhuthivakkam Metro Station including special spans and Construction of 12 no
  • Of Elevated Stations
  • Casting Yard experience Post tension I girder- reinforcement check- profiling check- formwork check- concreting- stage 1 & stage 2 stressing (both end) check- slippage- grouting- recess filling
  • Pretension I girder- reinforcement check- stressing- formwork- concreting-de stressing- recess filling
  • Pier arm- double deck pier arm- concourse and platform Pier arm- reinforcement- profile check- pedestal and formwork check- concreting
  • U girder- straight, transition & curve- reinforcement- threading & stressing- formwork- concreting- de stressing- recess filling
  • U shell portal- reinforcement- formwork- concreting
  • Casting yard quality check such as daily routine cube test, materials test, materials TPI check, batching plant calibration, jack efficiency test, post pour check and also structures will be checked before dispatched
  • Documentation RFI
  • Conducted thorough feasibility studies, risk assessments, and prepared comprehensive reports outlining project requirements, constraints, and mitigation strategies
  • Collaborated closely with clients, stakeholders, and multidisciplinary teams to ensure effective communication, resolve project issues, and facilitate project progression
  • Monitored project progress, conducted regular site inspections, and implemented quality control measures to ensure compliance with project specifications and standards
  • Responsibility of the Supervision of all construction activities for a section of the works and design related issues as assigned by the RE
  • Inspect the work as per GFC and the Method Statement
  • Carryout the Hold Joint inspection as defined in ITP
  • Report any out of construction tolerance works to RE and request the contactor to issue NCR and propose the remedial measures
  • Check the Construction work being carried out in compliance of the safety and quality standards as stated in contract requirements
  • Check the quantity claimed the contractor in IPA before submission
  • Monitoring and ensuring adherence to design specifications, the quality standards and safety of the construction of a 413-meter balanced cantilever bridge
  • Adopting the construction twin piers by auto climbing form work system (ACS)
  • Oversaw the installation and operation of form travellers, ensuring efficient and safe construction progress
  • Managed the planning and execution phases, coordinating with DDC and contractors to control geometry profile of the balanced cantilever

Engineer

AECOM ASIA PVT LTD
12.2018 - 04.2023
  • CH (0+000-10+380) 10.38km Includes Interchange Intertidal Precast Yard Marine, Main Bridge in marine including tidal zone & 5.8 Km of Ramps connecting to Eastern freeway 2 ramps of UP & DOWN
  • A Box girder Concrete structure of 14.8 Meters of dual carriageway of 3 lane each
  • Supervision all bridge-related activities like Rebar, Bottom Profile, Pre pour, Post Pour and Post Pour after Rectification at Segment Casting Yard & Prestressing & Marine zone to meet the Client's requirements to achieve the Project Target as per the schedule
  • Review & coordinate with the contractor regarding the method statement, and scheduled sequence of works
  • Pile integrity tests, Pile caps, Open foundation, Pier &Pier caps, Segments erection, gluing, stressing, grouting, crash barrier, Stitch Concerting
  • Superstructure: Consisting of 14.80m Wide, Precast segments glued together with Epoxy glue and post-tensioned
  • Method of Erection: Segments are erected at site with Overhead launching system, segments transported through low bed trailers
  • Operation of launching girders erection of spans includes segments lifting wet matching, threading with H.T cables, post tensioning, span lowering and grouting, parapet erection and stitch concrete
  • (LG) the sequence of erection of launching girder monitoring of all activities related to above operations (checking the sequence of segment lifting, wet matching, threading and post tensioning of span, span lowering on aligned bearing above pedestals and following up day by day activity carrying at site
  • Preparing weekly, monthly, and other progress reports held at the site as required by the SE
  • Coordination with contractor's supervisory personnel regarding schedule, sequence, and method of work

Trainee Engineer

Coastal Projects Ltd
05.2014 - 06.2015
  • Execution of excavation and piling works 26 meters depth
  • Monitoring Site Activities Day to Day Manpower and material
  • Managing Subcontractors works daily basis
  • Bar bending schedules for footings

Education

B.Tech - Civil Engineer

Sri Vishnu institute of technology
Andhra Pradesh
01.2018

Diploma - Civil Engineer

Narayan Polytechnic college
Andhra Pradesh
01.2014

Higher Secondary -

Bhashyam Public School
Andhra Pradesh
01.2010

Skills

  • AutoCAD
  • MS Office
  • MS Excel
  • Quality assurance

Native

Andhra Pradesh, India

Disclaimer

I declare that above particulars are correct and true to the best of my knowledge.

Languages

  • English
  • Hindi
  • Telugu

Father'sname

Narsimha Raju Kanumuri

Personal Information

  • Passport Number: S3805670
  • Date of Birth: 11/30/95
  • Gender: Male
  • Marital Status: Married

Timeline

Deputy Resident Engineer

AECOM INDIA PVT LTD
05.2023 - Current

Engineer

AECOM ASIA PVT LTD
12.2018 - 04.2023

Trainee Engineer

Coastal Projects Ltd
05.2014 - 06.2015

B.Tech - Civil Engineer

Sri Vishnu institute of technology

Diploma - Civil Engineer

Narayan Polytechnic college

Higher Secondary -

Bhashyam Public School
Satyanarayana Raju Kanumuri