MEGA UG-2 (Ahmedabad Metro), Quality Control Engineer / Project Engineer, 25, 10 Months, Diaphragm wall for M/S Larsen and Tourbo at Kalupur Launching Shaft MEJA Power Project (Meja, Allahabad (U.P.), Site Engineer, 15, 4 Months, Round Pilling, Sheet Pilling for M/s Sunil Hightech Ltd. Under the Guidance Of renowned NTPC India Ratnakar Nine Square (Ahmedabad), Site Engineer, 20, 4 Months, Diaphragm wall, soil anchoring, post tensioning work for M/s Nishant Construction RAJYASH RISE (Ahmedabad), Site Engineer, 25, 4 Months, Diaphragm Wall Construction for M/S Rajyash group with soil anchoring and stressing work at Vishala Choukadi Ahmedabad Shivalik Shilp (Ahmedabad), Project Engineer, 15, 3 Months, Precasted Diaphragm wall for M/S Shivalik Group at Keshavbaug Ahmedabad RAJHANS IMPERIA (Surat), Project Engineer / Quality Control Engineer, 0, 0 Months, Diaphragm wall for M/S Rajhans Group at Kinnary Cinema in Surat Hotel Manorama (Vijaywada, Andhra Pradesh), Project Engineer, 25, 3 Months, Diaphragm Wall For 3 basement with Soil Anchoring For M/S Suswadeep Enterprises Pvt. Ltd Daman River Front (Daman), Project Engineer, 25, 4 Months, Diaphragm Wall, Round Pilling Construction of Road (Sailana, Ratlam, M.P.), Proprietor / Civil Engineer, 35, 4 Months, Cement Concrete Roads Construction For the renowned Department Madya Pradesh Rural Road Development Authority PIU Ratlam Construction Of High level Bridge (Badnawar, M.P.), Proprietor / Civil Engineer, 40, 8 Months, Construction Of bridge having 5 spans of 15 metres For MPRRDA PIU Dhar Thandla ITI Building (Thandla, Dist. Jhabua, M.P.), Civil Engineer / Sub Contractor, 30, 16 Months, Construction of ITI building with development of Campus, Staff Quarters, Workshop Building, Cement Concrete Road, Boundary Wall of Entire Campus High School Building (Khadawda, Dist. Neemuch, M.P.), Civil Engineer / Proprietor, 15, 9 Months, Construction Of 2 Storey High School Building Under the guidance of Renowned Department MPPWD PIU Mandsaur Construction And Renovation works at Govt. Degree College Tarana Dist Ujjain Under World Bank Scheme, Civil Engineer / Proprietor, 0, 12 Months, Construction Of Laboratory Building And Barrier Free Work at Govt. Degree College Tarana Dist Ujjain (M.P.) Under the guidance of Renowned Department M.P. HOUSING AND INFRASTRUCTURE DEVELOPMENT BOARD Division Ujjain Construction, Renovation and Barrier Free work at Govt. Degree College Mahidpur Dist. Ujjain (M.P.) Under World Bank Scheme, Civil Engineer, 35, 14 Months, Construction of Laboratory building, Library, 2 floor Ramp For Physically Handicapped Students, Structural Steel Truss at Roof level And Renovation of Existing College Building