Summary
Overview
Work History
Education
Skills
Personal Information
Maintenancepurview
Languages
Managerialactivities
Projects
Itskillsets
Training
Disclaimer
Timeline
Hi, I’m

Mukesh Kumar

Manager(Electrical)
Mukesh Kumar

Summary

Seeking a challenging environment where I can augment my work and skill for the benefit of the organization and willing to relocate any where to handle responsibility in better way. Talented Manager with expert team leadership, planning, and organizational skills built during successful career. Smoothly equip employees to independently handle daily functions and meet customer needs. Diligent trainer and mentor with exceptional management abilities and results-driven approach.

Overview

16
years of professional experience
7
years of post-secondary education

Work History

Triveni Engineering and Industries Ltd

Manager (Electrical)
2011.08 - Current (13 years & 1 month)

Job overview

  • Guide team as a leader to achieve 100 % availability of equipment
  • Responsible for equipment availability and thus plant availability, trouble shooting, breakdown analysis and necessary corrective actions
  • Overhauling and testing of Major equipment’s e.g
  • Alternator, Power transformer etc
  • UPPCL Power Purchase Bill Preparation in Energy Account Month, Scheduling Power (Export/Import) and maintain Banking power
  • Analysis and observation to take corrective action to manage DSM Charges
  • Effective utilization of Material, Manpower in season and off season
  • Spares planning & ensure availability of critical spare parts of electrical equipment in all areas.

Dalmia Bharat Sugar Industries Ltd.

Engineer(Electrical)
2008.08 - 2011.08 (3 years)

Job overview

  • Shift Operation of Power(27MW) and Sugar Plant
  • To maintain Efficient & smooth operation of plant
  • Preparation of Daily Energy Report & MIS Report
  • All Maintenance Activities of Power House, Mill House and Boiling house
  • Material, Manpower & Man hour Planning
  • Proven abilities in managing maintenance operations of Machines, Equipment & Utilities with proven abilities in reducing downtime.

Education

D.C.R University of Science And Technology, Murthal (Haryana Govt. College)

B.E. from Electrical Engineering
2005 - 2008 (3 years)

University Overview

Percentage: 68.74%

Govt. Polytechnic Sirsa (S.B.T.E. Chandigarh) Sirsa ,Haryana

3Yrs. Diploma from Electrical Engg.
2002 - 2005 (3 years)

University Overview

Percentage: 62.64%

Haryana School of Education Bhiwani Haryana

Matriculation
2001 - 2002 (1 year)

University Overview

Skills

Initiative & interest in learning new things

Personal Information

Personal Information
  • Father's Name: Mr. Naresh Kumar
  • Mother's Name: Mrs. Rekha
  • Date of Birth: 10/12/1987
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Married

Maintenancepurview

Maintenancepurview
  • All Maintenance activity including Preventive/ Predictive Maintenance Scheduling, Condition Monitoring, Root Cause Analysis of Electrical Breakdowns, Tracking Breakdown History of Electrical Equipment.
  • Electrical section of Mill House ,Power House ,and boiling house.
  • Electrostatic precipitator (120KV).
  • PMCC and MCC section.
  • HT and LT Motors of Power house,Mill House and Boiler section.
  • Transformers (Converter & Distribution).
  • AVR (UNITROL-F) &UNITROL 6080 ABB make.
  • VFD Siemens make,ABB Make.
  • VCB/ACB / SF6 circuit Breaker siemens,L&T and CG make respectively.
  • Synchronizing Relay Panel,Switch yard Relay and metering Panel,OLTC,etc.
  • Battery bank and charger ,DG sets and Control panel ,etc.
  • Cable Size Selection and Routing
  • Batch Machine (DC Motors)of Centrifugal section.

Languages

English, Hindi & Punjabi

Managerialactivities

Managerialactivities
  • Resources planning & management.
  • Skill enhancement of subordinates.
  • Job planning & execution.
  • Material planning.
  • 5S, Knowledge Management.
  • Failure Mode &Effective Analysis of Electrical Key Process.

Projects

Projects
On deputation to installing of Distillery plant(200KLPD) in Unit- Raninagal (Thakurdwara,Kashipur)unit of TEIL (Year-2024) Commissioning of 10MW Cogen Power plant of Unit-Sabitgarh (Khurja,Bulandshahar) Unit of Triveni Engg.& Ind. Ltd (Year-2014). Commissioning of 10MW Cogen Power plant of Unit-Chandanpur (Gajrula) Unit of Triveni Engg.& Ind. Ltd.(Year-2013). Commissioning of RTU Panel for data communication to SLDC with the coordination of MB Control System Kolkata(Year-2013) Commissioning of Condensate Polishing Unit- 48M3/H (Year-2011). Commissioning of 700AH ,110V Battery Bank. Major Inspection ESP Maintenance – Testing of Transformer, field, retrofitting of Electronic controller in ESP panel (Used ACE-16 in place of EPIC). Commissioning of L&T VFD at FD Fan .ID Fan & Elevator .It is Cause to reduce the power consumption . Installation of Secure Energy Meter (Premier) and communicate with SCADA for REC Report.

Itskillsets

Itskillsets
  • SAP R3 (PM Module Version 6.0).
  • ERP Tools :
  • Developing Tools: MS Excel, MS Word, Open Office 3.0, Power Point.

Training

Training
  • 5 S Training.
  • LETS the value of organization.
  • TPM (Total Productive Maintenance).

Disclaimer

Disclaimer
I hereby declare that the information given above is true to the best of my knowledge.

Timeline

Manager (Electrical)
Triveni Engineering and Industries Ltd
2011.08 - Current (13 years & 1 month)
Engineer(Electrical)
Dalmia Bharat Sugar Industries Ltd.
2008.08 - 2011.08 (3 years)
D.C.R University of Science And Technology, Murthal (Haryana Govt. College)
B.E. from Electrical Engineering
2005 - 2008 (3 years)
Govt. Polytechnic Sirsa (S.B.T.E. Chandigarh)
3Yrs. Diploma from Electrical Engg.
2002 - 2005 (3 years)
Haryana School of Education Bhiwani
Matriculation
2001 - 2002 (1 year)
Mukesh KumarManager(Electrical)