Summary
Overview
Work History
Education
Skills
Accomplishments
Interests
Timeline
Generic
Nand Kishore Singh

Nand Kishore Singh

Service, Vice President JPL, Tamnar
Bokaro Steel City,JH

Summary

Talented Vice President with excellent employee development, customer service and analytics skills coupled with more than 38 years of experience. Comfortable giving engaging presentations to clients to drive new business, expand accounts and establish brand profile. Excellent team builder and leader of initiatives.

Overview

39
39
years of professional experience

Work History

Vice President of Jindal Power Limited

JPL
2023.04 - Current
  • Led cross-functional teams of the Coal Handling Plant (CHP), Ash Handling Plant (AHP), Ash Dyke, O&M/Civil, and Ash Utilization (AU) for the successful completion of major projects, and senior management to develop strategic initiatives and long-term goals. The major projects include CCPC capacity augmentation, fly ash disposal to mines void through CS pipelines, and ash dyke management.
  • Identified opportunities to improve business process flows and productivity, and cost-effective measures to run the system efficiently.
  • Established a culture of continuous improvement, fostering innovation and driving sustainable growth across the organization. The deployment of the barge pump at the ash dyke was an innovative idea to run the plant, even in a crisis.

HOD FM

NTPC LTD
2022.08 - 2023.01
  • HEADED FM & F.T.
  • Achievements/Tasks

IN-CHARGE CHP

NTPC LTD
2020.09 - 2022.08
  • HEADED CHP O&M.
  • Achievements/Tasks

HOD BOILER

NTPC LTD
2018.08 - 2020.09
  • WORKED IN THE CAPACITY OF HOD BOILER & ASH DYKE (INCLUDING CIVIL PART).
  • Achievements/Tasks

MAINT. ENGINEER

NTPC LTD
2005.04 - 2018.08
  • CARRIED OUT MAINT. OF AHD, BOILER ROTARY MACHINE & PRESSURE PART.
  • Achievements/Tasks

MAINT. ENGINEER

NTPC LTD
1999.01 - 2005.04
  • CARRIED OUT MAINT. OF CW SYSTEM, DM PLANT, COMPRESSORS & TURBINE AUXILIARIES.
  • Achievements/Tasks

SHIFT IN-CHARGE

NTPC LTD
1987.09 - 1999.04
  • CARRIED OUT OPERATION OF 200 & 500 MW UNITS IN THE CAPACITY OF DESK ENGINEER & SHIFT CHARGE ENGINEER.
  • Achievements/Tasks

Education

B.Tech (Mechanical Engineering) - Mechanical Engineering

BIT
Sindri, Dhanbad, Jharkhand
2001.04 -

M. Tech (PGT) - Power Generation Technology

IIT
New Delhi, India
2001.04 -

MBA - HR

IGNOU
New Delhi, India
2001.04 -

Skills

OPERATION OF 200, 500 & 800 MW THERMAL POWER PLANT

MAINTENANCE OF BOILER & TURBINE OF 200,500 & 800 MW THERMAL POWER PLANT

MANGEMENT OF ASH DYKE & ENVIRONMENT

FUEL HANDLING, COAL TRANSPORTATION, LISONING WITH RAILWAY & COAL COMPANIES

BULK SOLID HANDLING & STORAGE

ASSESSOR OF BEM , NTPC

FACULTY OF POWER GENERATION TECHNOLOGY

Accomplishments

  • 1. NTPC/Rihand stg-3 revival in 120hrs after its AHD system jeopardize due to roof collapse during its casting on 16th June 2016. It was handled as per my advise and appreciated by Director Operation also.
  • 2. Replacement of APH of Rihand STG-1 under R&M, due to its heavy passing (45%).
  • 3. Life enhancement of Rihand Ash dyke by 10 years with scope of one more raising. It’s toe drain portion was in the Rihand reservoir hence proposal of Buttressing from 1st raising was initiated by me and endorsed by IIT-K after due study.
  • 4. Enhanced coal transportation at Gadarwara and unloading with only three WTs with full safety and zero accident.

Interests

READING, YOGA , VISITING PLACES

Timeline

Vice President of Jindal Power Limited

JPL
2023.04 - Current

HOD FM

NTPC LTD
2022.08 - 2023.01

IN-CHARGE CHP

NTPC LTD
2020.09 - 2022.08

HOD BOILER

NTPC LTD
2018.08 - 2020.09

MAINT. ENGINEER

NTPC LTD
2005.04 - 2018.08

B.Tech (Mechanical Engineering) - Mechanical Engineering

BIT
2001.04 -

M. Tech (PGT) - Power Generation Technology

IIT
2001.04 -

MBA - HR

IGNOU
2001.04 -

MAINT. ENGINEER

NTPC LTD
1999.01 - 2005.04

SHIFT IN-CHARGE

NTPC LTD
1987.09 - 1999.04
Nand Kishore SinghService, Vice President JPL, Tamnar