Results-driven section head recognized for high productivity and efficient task completion. Specializes in strategic planning, team leadership, and operational improvement. Excels in communication, problem-solving, and adaptability, ensuring seamless team coordination and project success. Committed to optimizing processes and fostering professional growth within teams.
Overview
18
18
years of professional experience
Work History
Sectional Head (Manager) – Clinkerisation & Grinding Section
AMBUJA CEMENTS LIMITED (ADANI CEMENTS LTD)
Darlaght
08.2008 - Current
Successfully implemented of PM Module in SAP adopts Best Engineering Practice
SAP related activities i.e., material management, preventive maintenance records, History record, creating notifications, work order, measuring point, stoppage analysis etc. like all activity related to PM & MM modules
Minimized breakdowns and improved MTBF while reducing MTTR through targeted maintenance strategies.
Assisted in the commissioning of new fly ash grinding project, contributing to operational readiness.
Executed system upgrades and modifications to improve operational efficiency.
Replaced MCC, LRS, GRS, and distribution transformers to enhance system reliability.
ESP Transformer duct Modification work for ease Maintenance
Condition Monitoring by advanced technology Like: Thermal Imager of Electrical Equipments, Vibration Analysis by Spectrum Analyzer
In all Truck Loader’s Travel Drive Provide Proxy Switch with Limit Switch & tongue plate limit switch for Safety Purpose
Roller press New Buffer Resistance Commissioning work to avoid long plant stoppage
Bag filters inspection team member for optimisation of bag filters operation in grinding section.
Team member for SOP,HIRA,SMP preparation
Prepared documents for OH&S compliance and implemented required procedures.
Team member to IMS Coordinator to Prepare all documents as per IMS requirement & its Implementation work.
Coordinated resolution of technical faults across departments, achieving comprehensive analytical solutions.
Also looked for job planning, manpower handling, material indenting and arrangement for Preventive Maintenance during plant shutdown or Stoppage.
Installation of VCS for plant equipment
Participate in ISO & OHSAS related activities i.e., Audit, record keeping.
MS-Office & Excel, familiar with windows, internet, E-mail, Power Points & SAP module.
Education
Bachelor of Electrical Engg. -
Gujarat University
Bhuj , Kutch
Bhuj , Kutch
H.S.C. - Science
G.S.E.B
Dhoraji
Dhoraji
S.S.C. - Science
G.S.E.B
Mangrol
Mangrol
Skills
SAP material management
Preventive maintenance strategies
Condition monitoring techniques
Equipment installation
Technical fault resolution
Operational efficiency enhancement
Compliance auditing
Effective communication
Problem solving
Team collaboration
Safety management
Month-end closing
Operations management
Troubleshooting and problem resolution
Personal Information
Location Preference: Gujarat
Current CTC: 19.57 Lacs/Annum
Expected Salary: Negotiable
Notice Period: 2 Month
Date of Birth: 05/11/86
Gender: Male
Marital Status: Married
Hobbies and Interests
Sports
Listening Music
Travelling
Languages
English
Hindi
Gujarati
Disclaimer
I hereby declare that all the statements made above are true, complete and authentic to the best of my knowledge and belief.
Timeline
Sectional Head (Manager) – Clinkerisation & Grinding Section
SAP S4 Hana Service Delivery Manager at ATOS-SYNTEL (Renamed as Eviden- An ATOS Business)SAP S4 Hana Service Delivery Manager at ATOS-SYNTEL (Renamed as Eviden- An ATOS Business)