With over 8 years of extensive experience in the railway signaling and telecom sector, seeking middle-level assignments with a growth-oriented organization. Goal is to secure a position utilizing strong organizational skills, educational background, and knowledge, while working effectively within a team. Resourceful, innovative, and comfortable working and interacting with cross-cultural and multinational teams. Gained valuable experience in railway signaling, including planning of railway works, monitoring and follow-up of drawings and documentation. Possess a good understanding of planning, monitoring, and reporting of signaling technologies, with a keen interest in adopting modern signaling methodologies.

Overview

9
9
years of professional experience
2
2
Languages

Work History

Sr. Engineer(S&T)

Kiran infra engineers limited
10.2021 - Current

Project-I

  • Outdoor signalling and telecom and electronic interlocking of kyosan systems(General) works in connection with doubling of Makrana-degana section
  • Reporting to: Sse/sig/c/AII
  • Client: NWR Railway

Project-II

  • Outdoor signalling and telecom and electronic interlocking of kyosan systems(General) works in connection with doubling of Makrana-Phulera section
  • Reporting to: Sse/sig/c/BKN
  • Client: NWR Railway

Project-III

  • The scope of the work involves the design, supply, installation, testing, and commissioning of outdoor equipment/gears for signaling works and telecommunication works in connection with Virar (VR)-Dahanu Road (DRD) Quadrupling Project in Mumbai Suburban (MUTP-III), Palghat district.
  • Reporting to:-Sse/Rodic/Mumbai
  • Client:MRVC

Role & Responsibilities:-

  • Project planning, Procurement of Materials & Overseeing works of Technical/Supervisors/Wiremen /Foremen are at site to get the Quality of Output
  • Estimated the Material requirement, procurement and nominated the required Technical staff to install and testing of the Equipment based on Approved SIP
  • Trenches made as per the RVNL Schedule and Cable Laying in Proper manner I.e
  • Meggering the Cables before & after Laying
  • Responsible for Installation, Testing and Commissioning of all Signalling equipments & Signalling gears (CLS Signals, LC Gates & TRACK CIRCUITS)
  • OUTDOOR particulars for Locations & Signals, Track circuits & Digital Axel Counters
  • Day-to-Day reporting to Client-RVNL/RAILWAYS/MRVC of Running works in Safety aspects
  • Site Works Execution, Quality Control and also involving in Testing Team towards Commissioning
  • Survey of the site with Railway/Rvnl staff for infringement in new work and planning the same to shift so not to disturb the existing railway movement
  • Internal wire testing as per the Interface diagram 1Wire 2Wire testing in relay room
  • Preparation of Energy Conservation Management (ECM) report to be submitted to Ministry of Environment floor plan of Relay Room as relay racks, CT racks and OCV, Micro Controller of EI with Data Logger, IPS room as placement of mini IPS for EI system and main IPS with maintenance PC placement
  • Verification of various drawings as per RDSO latest guidelines as Cable Core Chart, Cable Route Plan, Track Insulation of Plan, as per approved SIP and RDSO guide lines
  • Marking Glued Joint,Location foundation and signal foundation as per approved Track Insulation Plan &SIP
  • Core to Core meggring and core to earth meggring of various cables before laying, and preparation of report as well
  • Checking of RDSO/RITES Inspection request call letter in which confirmation of firm is in RDSO list or not and the quantity mentioned is as per the BOQ list

Site engineer(S & T)

Shivakriti international limited
08.2016 - 09.2021

Project-I

  • Outdoor signalling and telecom and electronic interlocking of kyosan systems works in connection with doubling of savrupganj- abu road section and Abu Road to Sarotra road section(49 km)
  • Reporting to: General Manager Project
  • Client: RVNL

Project:II

8IBS Project of NWR rewari to jaipur

  • Reporting to: SSE/SIG/PROJ./JP
  • Client: NWR RAILWAY

Education

RS-CIT - computer

Vardhman Mahaveer Open University
Kota, India
03-2017

B. Tech - Electrical Engineering

Rajasthan Technical University
Kota, India
04.2011 - 2015.01

Skills

Team leadership

IT SKILLS - Productivity Software

MS Office

Autocad basic

Disclaimer

I, the undersigned Certify that, to the best of my knowledge and belief, this bio data correctly describes my qualifications, my experience and myself. I understand that any willful miss-statement described herein may lead to my disqualification or dismissal, if engaged. I have not left without approval of Competent Authority of RVNL/RAILWAY any of the RVNL/RAILWAY works without completing my assignment and shall be available to work with the consultants if the Consultancy contract is awarded to the consultant. In case I leave the assignment without approval of RVNL/RAILWAY or am removed by RVNL/RAILWAY on account of some default, RVNL/RAILWAY would be at liberty to take appropriate action against me including debarment for up to Two Years. I am willing to undertake the assignment if the Consultancy contract is awarded to the firm and ensure my availability for the duration of the assignment. I have no history of involvement in Vigilance/CBI/Police Case, resulting in punishment.

Timeline

Sr. Engineer(S&T)

Kiran infra engineers limited
10.2021 - Current

Site engineer(S & T)

Shivakriti international limited
08.2016 - 09.2021

B. Tech - Electrical Engineering

Rajasthan Technical University
04.2011 - 2015.01

RS-CIT - computer

Vardhman Mahaveer Open University