Dynamic Lead Engineer with a proven track record at ZAMIL ITG, excelling in project management and team leadership. Expert in HVAC system design and Plumbing System design. Achieved significant cost savings through workflow optimization while mentoring junior engineers to enhance team productivity and product reliability.
Louver, Disc Valves, Door Grille, etc.
o Pipe and Duct Routing & Sizing as per specifications & standards
o Chilled water Isometric drawings with welding joints tags and material specification.
o Air flow & Water flow control diagram
o P&ID & Process flow Diagram
o HVAC major, minor & bulk material submittals and obtaining approval for construction purpose
o Variation Orders as per the project requirements
o Bill of quantity for Duct, Pipe and insulation for invoicing
o Equipment schedule (bill of material as well as performing procurement operations of various equipment for
several prestigious projects
o plumbing design and drawing preparation.
o External Static Pressure (ESP) covered Software (Elite) and Manual
o Pump Head & Hydraulic Calculations for Chilled Water System as well volume of water required for the same
Team Management
Project Management
Elite Software: Heat Load & External Static Pressure (ESP) Calculations
CAD/CAM: AutoCAD-2D & 3D, REVIT 2024
HVAC Software: Duct Sizer, Pipe Sizer and Psychometric Charts
HVAC system design
Plumbing systems (Water Supply and Drainage) design
MEP coordination
Major Projects Handled:
1) MARSEK LOGESTIC PARK, JEDDAH PORT, SAUDI ARABIA
Description: This Project consist of Warehouse building, Office Building, Ancillary Building and Substation Building.
Responsibilities: Supervising Design verification for the mechanical system (HVAC, Public health (Water supply and Drainage), Fire protection), Preparation of shop drawings, Preparation of as built drawings, Preparation of External Services Shop drawings and Coordination drawings, Preparation of material approval submittals. HVAC air flow diagrams, HVAC Ducting, Piping Layouts & Sections, HVAC Controls Schematic. Development of equipment schedules.
2) RIYADH METRO PROJECT – PACKAGE 1 (KAFD STATION 1A1)
Description: KAFD station 1A1 consist of 7 floors (B01, B02, G00, P01, F02, P03, F04)
Responsibilities: Design verification for the mechanical system (HVAC, Public health (Water supply and Drainage), Fire protection), Preparation of shop drawings, Preparation of as built drawings, Preparation of material approval submittals. HVAC air flow diagrams, HVAC Ducting, Piping Layouts & Sections, HVAC Controls Schematic. Development of equipment schedules.
3) Petrochemical query (PCQ-2) –SABIC-Jubail-KSA.
Description: Preparing the HVAC system design for the 36 building. Which includes substations, LAB, Office buildings.
Responsibilities: Preparing of HVAC design calculations, HVAC air flow diagrams, HVAC Ducting, Piping Layouts & Sections, HVAC Controls Schematic.Development of equipment schedules. Submission of materials like HVAC equipment, major / minor / bulk material.
4) YANBU Export refinery project (YERP EPC-1,EPC-2,SP-1)- Saudi Aramco Project-KSA
Description: This Project Consist of 6 Buildings. which includes Switchgear Building, PIB Equipment Building
Responsibilities: Preparing of HVAC design calculations, HVAC air flow diagrams, HVAC Ducting, Piping Layouts & Sections, HVAC Controls Schematic.Development of equipment schedules. Submission of materials like HVAC equipment, major / minor / bulk material.
5) UMM WU’AL DAP/NPK Plant and Storage Project- MA’ADEN-KSA
Description: This Project Consist of 7 Buildings. which includes Process Building E-F Electrical Substation, Administrative & Maintenance Building, Port Operation Building.
Responsibilities: Preparing of HVAC design calculations, HVAC air flow diagrams, HVAC Ducting, Piping Layouts & Sections, HVAC Controls Schematic.Development of equipment schedules. Submission of materials like HVAC equipment, major / minor / bulk material.
6) HAWIYAH Contractors park- Saudi Aramco, KSA
Description: This Project Consist of 9 Buildings. Which includes Main Mosque, Dining & Kitchen, Maintenance Workshop, Clinic Building, Kitchen Support Building, Fire Station Hanger.
Responsibilities: Preparing of HVAC design calculations, HVAC air flow diagrams, HVAC Ducting, Piping Layouts & Sections, HVAC Controls Schematic.Development of equipment schedules. Submission of materials like HVAC equipment, major / minor / bulk material.
7) SAUDI ELECTRICITY COMPANY (SEC) SUBSTATIONS
Description: 10 Substations 380/132/13.8 kv (SEC) Project, KSA
Responsibilities: Preparing of HVAC design calculations, HVAC air flow diagrams, HVAC Ducting, Piping Layouts & Sections, HVAC Controls Schematic.Development of equipment schedules. Submission of materials like HVAC equipment, major / minor / bulk material.
8) Saline Water Conversion Corporation (SWCC), Jubail & SHUQUAIQ-KSA
Description: This Project Consist of 117 Buildings, Which includes Main & Booster Pump House, Electrical Buildings, Chlorination
Building and Water Quality Monitoring Building.
Responsibilities: Preparing of HVAC design calculations, HVAC air flow diagrams, HVAC Ducting, Piping Layouts & Sections, HVAC Controls Schematic.Development of equipment schedules. Submission of materials like HVAC equipment, major / minor / bulk material.