Desire to work in a company that utilizes my knowledge, talent, hard work, dedication and sincerity in a well manner. I am looking for the great opportunity that offers me challenging Assignments, professional development and career growth.
Overview
17
17
years of professional experience
1
1
Certification
3
3
Languages
Work History
Chief Electrical Engineer
SRI PARIJATHA MACHINARY WORKS PVT LTD
Bangalore
11.2024 - Current
Electrical Design
Electrical Bill of Materials Preparation
Electrical Panels wiring Testing and Troubleshooting
Over all Machines take Trails
Machine installation and Trails
Manpower handling
SPM -Assembly Testing and Trails
Documentation
Designed electrical control panels for various industrial applications that streamlined manufacturing processes.
Developed custom automation systems, increasing production efficiency and reducing human error.
Improved overall system efficiency by designing and implementing innovative electrical engineering solutions.
Optimized power distribution networks for increased reliability and reduced maintenance costs.
Managed electrical engineering projects from concept through completion, ensuring adherence to budgetary constraints and quality benchmarks.
Coordinated with vendors to source high-quality materials at competitive prices while adhering to established procurement policies.
Developed effective troubleshooting techniques that minimized downtime during critical operations.
Conducted in-depth analyses of power consumption data, identifying inefficiencies and recommending targeted improvements.
Evaluated emerging technologies for potential application within the organization''s operations, driving innovation and staying ahead of industry trends.
Identified specific cables, fuses and circuit breakers required for assigned installations.
Performed maintenance procedures and repairs on existing electrical products and systems.
Improved methods for measurement, documentation, and work flow management.
Established and maintained effective communication with clients and contractors.
Prepared detailed reports on electrical systems and components for project review.
Developed and implemented preventive maintenance and operational procedures for electrical systems.
Plant Maintenance, CNC Machine maintenance & General machines maintenance activities
UTILITY, BREAKDOWN MAINTENANCE
Maintained the plant and Machinery (CNC& SPM, General Machinery) Electrical, Mechanical, Pneumatics, Hydraulic Utilities, Chillers, Hydraulics, DG sets, HT LT Transformer, EOT Cranes, JIB Cranes, Press Machinery’s, Hydraulic Lifts AC Lighting Circuits and Related Coordinate
Maintenance activities of all Electrical and Mechanical. With Documentation Activities
Plant preventive maintenance; Break down Maintenance, corrective Maintenance
Electrical problem machines maintenance. Planning, with Machine Preventive, Predictive, Monthly, weekly
Breakdown analyses with taken corrective action plan
Manpower handling
Co-ordinate with Wenders follow-up. & Spare
Testing and Troubleshooting
Documentation. (ISO9001-2015)
Monitored employee performance to keep projects on task.
Determined equipment failure root cause and implemented solutions.
Led cross-functional team for successful completion of multiple large-scale projects, ensuring timely delivery within budget constraints.
Mentored junior engineers, providing guidance in best practices and fostering professional growth opportunities.
Enhanced system reliability by conducting thorough root cause analyses and implementing corrective actions to prevent future issues.
Improved project efficiency by streamlining engineering processes and implementing innovative solutions.
Enforced rules and regulations to keep working environment safe.
Delivered high-quality products by collaborating closely with sales teams to understand customer needs and translate them into viable solutions.
Accelerated product development cycles by employing Agile methodologies and fostering a collaborative work environment.
Reduced system downtime significantly, implementing robust monitoring protocols and quick-response strategies.
Coordinated with multidisciplinary teams to ensure project milestones were met on time and within budget.
Overhauled company's data management system, improving accessibility and security of vital information.
Trained and mentored junior engineers, providing guidance and direction.
Assisted in developing cost-effective solutions to engineering problems.
Conducted technical evaluations of engineering designs and test results.
Documented and developed engineering procedures and processes.
Developed comprehensive engineering documents for all projects.
Asst. Engineer -Production (Turning Division)
BHARAT FRITZ WERNER LTD
Bangalore
01.2016 - 02.2020
Electrical Design
Electrical Incharge Production and maintenance activities
Project Planning, with Machine testing and final clearance
Electrical Interfacing with Machine
Wenders follow-up and Manpower handling
Customer support- Online and offline
Testing and Troubleshooting
SPM -Assembly Testing and Trails
Documentation
Increased overall project safety by enforcing company policies and adhering to industry regulations.
Supported senior engineers with detailed design drawings, calculations, and analysis for various engineering projects.
Assisted in the development of technical specifications for engineering projects, ensuring accuracy and adherence to established guidelines.
Improved communication between team members by creating clear project documentation and updating progress reports regularly.
Developed cost-effective solutions for engineering challenges while maintaining high-quality standards and meeting deadlines.
Developed comprehensive engineering documents for all projects.
Conducted technical evaluations of engineering designs and test results.
Developed high-quality engineering designs and plans to meet industry standards.
Documented and developed engineering procedures and processes.
Developed and implemented procedures to verify compliance with engineering standards.
Streamlined workflow processes through effective management of resources, materials, and labor allocations.
Provided technical assistance to staff when needed.
Assisted in development, design and execution of projects.
Contributed to successful project completion by assisting with on-site inspections, testing, and quality control measures.
Mentored junior engineers by providing constructive feedback on their work, fostering a positive learning environment within the team.
Collaborated closely with clients to define requirements, address concerns, and provide updates on project status throughout each phase of work.
Provided technical support during construction phases of a project including field supervision or inspection services.
Assisted in the preparation of comprehensive budgets for engineering projects while monitoring expenditures to ensure adherence to financial constraints.
Reduced production downtime by troubleshooting equipment failures and implementing preventive maintenance measures.
Participated in continuous improvement initiatives aimed at increasing efficiency within the department or organization.
Created detailed reports on engineering activities and findings.
Developed and maintained relationships with suppliers to facilitate quality and timely delivery of materials.
Implemented automated systems to improve accuracy and efficiency of engineering processes.
Conducted research to identify and evaluate new technologies and concepts.
Optimized performance of mechanical systems by conducting thorough analyses and recommending improvements.
Stayed current on industry trends and emerging technologies through participation in professional development opportunities, ensuring the continued delivery of cutting-edge engineering solutions.
Assessed scope and requirements to assist with project design determinations.
Trained and mentored junior engineers, providing guidance and direction.
Collaborated with other departments to facilitate successful project completion.
Analyzed and interpreted customer requirements to develop engineering solutions.
Enhanced system reliability with thorough testing procedures and diligent attention to detail in design modifications.
Enhanced project efficiency by implementing innovative engineering solutions and streamlining processes.
Collaborated with engineering team to determine project specifications.
Studied corrections from senior engineers to learn and grow professionally.
Assisted engineers with inspections of finished construction.
Verified construction documentation to meet client requirements and vision.
Analyzed and interpreted data to identify trends and recommend improvements.
Jr. Executive-Maintenance
SAB MILLER INDIA LTD
Bangalore
04.2015 - 01.2016
Attending and Maintaining the Pillar, Depal, Seamer, Shrink rapper, Screen printing, coadding machine and General Machines (Automation)
VFD, Drives, System Related Paramerters, Conveyer, Motors etc
Located bottlenecks to streamline existing processes.
Assessed and analyzed departmental budgets to find ways to minimize expenses and optimize profits.
Achieved industry-leading customer satisfaction scores by revamping customer feedback and resolution process.
Jr. Egg Electrical
NEUMATICA TECHNOLOGY PVT LTD
Bangalore
04.2013 - 04.2015
Electrical Design
Project Planning & Electrical Design
Hydro-Pneumatic Press, SPM Machine Final Assembly
Check the Power Circuit & Control Circuit Connection
Check the All Inputs & Outputs Circuit Connections
Installed, maintained, repaired, and tested equipment for electricity generation and utilization.
Inspected electrical systems, equipment and components to identify hazards, defects, and repair requirements.
Used testing instruments such as ohmmeters, voltmeters, ammeters, and multimeters.
Performed routine and complex maintenance and repairs on various electrical equipment.
Reduced downtime for clients by quickly diagnosing and repairing complex electrical issues.
Mentored apprentice electricians in proper installation techniques, safety protocols, and troubleshooting methods to enhance their skill sets.
Maintained compliance with local codes and regulations by staying up-to-date on industry standards and best practices.
Education
Diploma - E&E
CMJ UNIVERSITY
01.2012
ITI - undefined
SRI SUMUKA ITI COLLEGE
01.2008
S.S.L.C - undefined
GOVT HIGH SCHOOL
01.2005
Skills
Knowledge in MS Office, Word, Excel, Auto CAD-Design, Z-CAD
DECLARATION
I consider myself familiar with INDUSTRIAL AUTOMATION and I am also confident of my ability to work in a team. I hereby declare that the above particulars furnished by me are true to the best of my knowledge and belief. Place: Date: You're faithfully, NINGARAJA.N
Senior Manager-Client Relations at Sri Sai Power and Equipment's Pvt Ltd & Sri Sai Tech And Hr Solutions Pvt LtdSenior Manager-Client Relations at Sri Sai Power and Equipment's Pvt Ltd & Sri Sai Tech And Hr Solutions Pvt Ltd