Summary
Overview
Work History
Education
Skills
Affiliations
Languages
Computer Skills
Timeline
Generic
Niteshkumar  Patel

Niteshkumar Patel

A-1/98 Sidharth App, Palanpur Patiya, Rander Road,Surat

Summary

An organized and motivated individual, with robust experience in managing complex projects from inception to completion. Strengths include adept problem-solving, strategic planning, and strong communication skills. Have consistently delivered high-quality results, improved efficiency, and executed successful project roll-outs in previous roles.

Overview

3
3
years of professional experience

Work History

Assistant Manager- Projects

Kutch Copper Limited/ Adani Enterprise Limited
Mundra
08.2022 - Current

Phosphoric Acid Plant (800 TPD Capacity) – Engineering.

  • Assisted in the review and finalization of the Design Basis, Layout, PFDs, P&IDs, HMB, and GAD for major process units, including reaction, filtration, and concentration sections.
  • Created a blending chart for optimizing rock phosphate grades, enabling efficient raw material utilization.
  • Supported equipment datasheet review for the various equipment and units, such as HVBF, pumps, crushing units, heat exchangers, etc.
  • Maintained a Master Document List, ensuring seamless documentation control and easy traceability across the engineering and procurement stages.
  • Coordinated project timelines and resources with cross-functional teams.
  • Coordinated with licensor's and consultants to validate process parameters and design assumptions.

Effluent Treatment Plants (ETP – 1500 KLD & 335 KLD Capacity)

  • Monitored project progress from engineering to commissioning.
  • Ensuring the timely approval of the document and supply of materials to the site by managing the lead time of equipment, procurement schedules, follow-ups, and logistics.
  • Coordinated with the civil team during execution, ensuring the timely completion of equipment foundations, trenches, and structural supports, as per engineering drawings.
  • Collaborated with the mechanical team during erection, overseeing the installation of pumps, tanks, piping, and other mechanical systems.
  • Led cold and hot commissioning activities, ensuring the readiness of equipment, piping, and electrical systems for safe and efficient startup. Supervised commissioning protocols, including flushing, hydrotesting, loop checks, and trial runs.

Education

Bachelor in Engineering - Chemical Engineering

Vishwakarma Government Engineering College
Ahmedabad
06-2022

Higher Secondary Education - Science

Sanskar Bharti Vidhyalaya
Surat
03-2018

SSC - 10th

Sanskar Bharti Vidhyalaya
Surat
03-2016

Skills

  • Process deliverables review
  • Equipment validation
  • Project documentation
  • Commissioning protocols
  • Scope management
  • Cross-functional collaboration
  • Project planning and management
  • Regulatory compliance

Affiliations

  • Singing
  • Travelling

Languages

Gujarati
First Language
English
Proficient (C2)
C2
Hindi
Proficient (C2)
C2

Computer Skills

  • Office – MS Word, Excel, PowerPoint
  • AutoCAD
  • 3D-NWD

Timeline

Assistant Manager- Projects

Kutch Copper Limited/ Adani Enterprise Limited
08.2022 - Current

Bachelor in Engineering - Chemical Engineering

Vishwakarma Government Engineering College

Higher Secondary Education - Science

Sanskar Bharti Vidhyalaya

SSC - 10th

Sanskar Bharti Vidhyalaya
Niteshkumar Patel