To secure a challenging position in an organization that offers professional growth while utilizing my academic and mental potential to the fullest extent possible.
Having 8 years experience in the areas of project budgeting, co-ordination, operation & maintenance, planning, erection & commissioning, quality & safety management, site management. Client management, vendor management, supply chain management, Billing and installation work. Good knowledge of documents related to project. Coordinate project management activities, resources, equipment and information. Erection and commissioning of 11,33 kv line, Distribution transformer. Having knowledge of laying of underground cable by machine and manually.
· LIAISONING WITH JBVNL REPRESENTATIVE FOR SMOOTH IMPLEMENTATION OF NFMS PROJECT.
· REPRESENTING RELATED TO NFMS SCOPE AND OBJECTIVE LIKE MONITORING FOR POWER RELIABILITY PARAMETER SUCH AS SAIFI, SAIDI, HOUR OF SUPPLY ETC.
· MONITORING FOR POWER QUALIT PARAMETER SUCH AS VOLTAGE LEVEL, POWER FACTOR, AND FREQUENCY ETC.
· ENABLING INPUTS FOR DISCOM RATING, NETWORK PLANNING, LOAD MANAGEMENT, ENERGY ACCOUNTING ETC.
· ENABLING MACHINE TO MACHINE (M2M) DATA TRANSFER FROM FIELD EQUIPMENT TO THE SERVER AND DATA PROCESSING UNIT WITHOUT ANY MANNUAL INTERVENTION.
· THERE ARE MAILY 03/04 TYPES OF API TO BE DEVELOPED FOR (M2M) DATA TRANSFER LIKE-MASTER DATA API, METER TRANSTATIONAL DATA API, ALARM API AND OUTAGE SCADA/AMR RESPECTIVELY.
· THE MASTER DATA API HAVE 04 TYPES –INSTALL, REMOVE, REPLACE,CHANGE.
· THE METER TRANSTATIONAL DATA API HAVE 04 TYPES LIKE-BLOCK LOAD PROFILE, DEVICE EVENT, DAILY PROFILE, BILLING PROFILE.
· THE ALARM API 02 TYPES LIKE-AMR,SCADA/RT-DAS
· THE OUTAGE API HAVE EITHER PLANNED OR UNPLANNED.
· UPTO HIGHER AUTHORITY AS WELL AS LOWER EMPLOYEE.
· SECHEDULING MEETING TIME TO TIME ALONG WITH UTILITY AND ITS SYSTEM INTEGRATOR FOR INTEGRATION WITH NFMS.
· PROVIDING GUIDANCE TO UTILITY STEP BY STEP HOW TO COMES IN INTEGRATION PROCESS.
· AFTER SUCCESSFUL INTEGRATION THE DATA WILL BE ANALYSED AND IF ANY COREECTION IS REQUIRED FROM UTILITY SIDE AS WELL AS OUR DEVELOPMENT SIDE WILL BE CROSSPONDANCE WITH EACH OTHER AND TAKING NECESSARY ACTION TO RESOVED ISSUE ON GIVEN TIME.
· UPDATION OF PROGESS TO UTILTY HIGHER AUTHORITY LIKE M.D, DIRECTOR ON WEEKLY BASIS.
· SUPERVISION OF AMISP PROJECT WHILE IMPLEMENTATION OF RDSS.
· M2M INTEGRATION OF FEEDER CO ORDINATION WITH OUR CORPORATE OFFICE IT TEAM AS WELL AS JBVNL AND FMS AGENCY WHILE SMOOTH INTEGRATION.
· UPDATION OF PROGESS ALONG WITH RDSS NODEL AS WELL AS UTILLITY M D AND OUR CORPORATE OFFICE ON DAILY BASIS.
· PROVIDING ASSISTANCE AND INFORMATION TO UTILITY.
· SURVEY OF ELECTRIFICATION WORK DTR WISE WHICH COMES UNDER NHAI ROW AREA AS PER PROJECT SCOPE.
· DPR PREPARETION IN ACCORDANCE WITH EXISTING AND NEW WORK PERPOSAL UNDER PROJECT.
· COMPETENT UTILITY AUTHORITY APPROVAL FOR DPR AND DRAWINGS.
· MATERIAL INSPECTION AT SITE & FACTORY LIKE-POLES, CABLES, CONDUCTOR,INSULATORS, TRANSFORMER,HARDWARE FITTINGS.
· PREPARATION OF ERECTION PLAN ALONG WITH OUR TEAMS AND MAKE PRIORITY BASIS AS GIVEN BY CLIENT.
· PREPARTION OF INDENT FOR MATERIAL ISSUE FROM OUR CENTRAL STORE.
· RECHECK SURVEY BEFORE START ERECTION WORK.
· SHIFTING OF EXTING DTR,POLES,CABLES CONDUCTOR,TOWERS FROM ROW NHAI WORKING AREA TO THE CORNER OF NHAI CORIDOR (2 MTR) AND ERECTED NEW POLES,CABLES,CONDUCTOR AND UG CABLE.
· SHIFTING OF 220 KV M/C ROHTAK –MULDANA LINE TOWERS/ 220 KV DOUBLE CIRCUIT PANIPAT –NARELA TOWER/400 KV DOUBLE CIRCUIT KABULPUR-DEEPALPUR LINE TOWERS ETC. OF BBMB,HVPNL RESPECTIVELY FROM NHAI WORKINHG AREA TO OUT FROM THE NHAI CORRIDOR FOR CONSTRUCTION OF 4 LANE NH-334B ROHANA TO HARYANA BORDER/U.P IN STATE OF HARYANA.
· RESOLVE ROW ISSUE/HINDRANCE BY LOCAL PEOPLE.
· PREPARATION OF JMC (JOINT MEASUREMENT SHEET).
· COMPLIANCE RECTIFICATION GIVEN BY NHAI AS WELL AS UTILITY.
· HANDING OVER –TAKING OVER PROCEDURE.
· PREPARATION OF CLOSER DOCUMENT.