Summary
Overview
Education
Work History
Skills
Timeline
Work Availability
Languages
Generic
Pradeep Kumar Singh

Pradeep Kumar Singh

Project Manager Highway
Lucknow

Summary

Experienced Civil Engineer with 18+ years of expertise in planning and executing project plans for rigid and flexible pavement projects. Skilled in leadership, organization, and ensuring project milestones are met. Proficient in road finishing work according to industry guidelines. Proven track record of implementing efficient processes and achieving project goals. Responsible for managing subcontractors, manpower, and machinery on site for project success.

Overview

18
18
years of professional experience
2
2
Languages

Education

10th (High School) -

UP Board
UP Board
04.2001 -

12th (Intermediate) -

UP Board
UP Bord
04.2001 -

B.E.(Civil) -

Pt. Ravi Shankar Shukla University
Raipur, India
04.2001 -

Work History

Project Manager Highway

SHALIMAR CORPORATION LIMITED
01.2025 - Current
  • Project - Development of the Six-Lane Jhanki-Sargi Section of NH-130 CD Road from Km. 00+000 to Km. 42+800 under the Raipur-Vishakhapatnam Economic Corridor in the State of Chhattisgarh on HAM mode. PKG-1.
  • Client – NHAI
  • Project Cost - Rs. 1,000.00 crores.
  • Assist the key experts in understanding the design, extracting the details from the design, and making minor modifications to the design as needed.
  • Assist key personnel in reviewing all activities related to the construction of the highway.
  • Oversee the construction of the road, highway, and expressway project from beginning to end.
  • Determine the necessary equipment, materials, and manpower needed.
  • Carry out the survey according to the project schedule and site conditions regarding the highway and structure.
  • Contractor monitoring, watching plant production, and preparation of the weekly program.
  • Preparation of subcontractor bills.
  • Coordination with clients, consultants, and sub-contractors.
  • Observation on materials such as cement, sand, aggregate, dowel bars, tie bars, laying materials, etc.
  • Quality control of roads as per MORTH and IRC specifications.
  • Giving assistance to seniors in all aspects of construction supervision, surveys, and calculation of quantities of road work.
  • Managing highway-related projects from conceptual stages through all phases of pre- and post-contract activities.
  • Supervising and overseeing the work of the project design team members, including senior engineers, engineers, and graduates.
  • Coaching, mentoring, and developing junior staff.
  • Managing and developing both internal and external client relationships and identities.

Deputy Project Manager

SHALIMAR CORP LIMITED
07.2023 - 12.2024
  • Project - Development of Six Lane Jhanki-Sargi Section of NH-130 CD Road from Km. 00+000 to Km. 2+800 under Raipur Vishakhapatnam Economic Corridor in the State of Chhatisgarh on HAM mode. PKG-1
  • Client – NHAI
  • Project Cost - Rs. 1,000.00 crores. Determine the necessary equipment, materials, and manpower needed.
  • Carry out the survey according to the project schedule and site conditions regarding the highway and structure.
  • Maintaining a record set of working drawings and construction records.
  • Assist the client in monthly bill checking and carry out a review of all detailed designs and estimates for the road sections prepared by the design engineer, and suggest modifications for the road, if required.
  • Execution of earthwork for the main highway, CTSB, CTB, AIL, DBM, BC, DLC, and PQC work.
  • Contractor monitoring, watching plant production, and preparation of the weekly program.
  • Preparation of subcontractor bills.
  • Maintaining day-to-day DPR, RFIs, material reconciliation, machinery, and labor reports.
  • Responsible for laying activities for PWC and DLC, groove cutting, sealant filling, and curing.
  • Coordination with clients, consultants, and sub-contractors.
  • Observation on materials like cement, sand, aggregate, dowel bar, tie bar, laying materials, etc., for the execution of work.
  • Quality control of roads as per MORTH and IRC specifications.
  • Giving assistance to seniors in all aspects of construction supervision, surveys, and calculation of quantities of road work.
  • Managing highway-related projects from conceptual stages through all phases of pre- and post-contract activities.
  • Supervising and overseeing the work of the project design team members, including senior engineers, engineers, and graduates.
  • Coaching, mentoring, and developing junior staff.
  • Managing and developing both internal and external client relationships, and identifying and managing project risks.
  • Undertake the role of Project Manager as necessary.
  • Knowledge of standard engineering practices, techniques, and procedures.
  • Managerial responsibility for scheduling and resourcing project teams, and related staff.

Deputy Project Manager

ARSS INFRASTRUCTURE PROJECTS LTD
12.2021 - 07.2023
  • Project - Improvement of 2 lanes with paved shoulders of NH-0 section from Km. 93 + 90 to Km. 123 + 800 (Design Km. 10 + 670 to Km. 37 + 550). Design length = 26.550 km. in the state of Meghalaya on EPC mode under JICA loan assistance (Package II).
  • Client - NHIDCL
  • Project Cost - Rs. 210.00 Crores. Oversee the construction of the road, highway, and expressway project from beginning to end.ay & Expressway project from beginning to end.
  • Determine the necessary equipment, materials and manpower needed.
  • Carry out survey as per schedule of project and site condition regarding highway and structure.
  • Maintaining a record set of working drawings and construction records.
  • Assist the Client in Monthly Bill checking & carrying out review of all detailed designs and estimates for the road sections prepared by the Design Engineer and suggest modifications for the road, if required.
  • Execution of earth work for main Highway, GSB, CTSB, WMM, DBM, BC, DLC and PQC work.
  • Contractor monitoring, Watching plant production, preparation of weekly program.
  • Preparation of subcontractor bills.
  • Maintaining day to day DPR, RFI's, material Reconciliation, Machinery and Labour Reports.
  • Responsible for laying activities for PWC and DLC, groove cutting, sealant filling and curing.
  • Coordination with clients, consultants and sub-contractors.
  • Observation on materials like cement, sand, aggregate, dowel bar, tie bar, laying materials etc. for execution of work.
  • Quality control of road as per MORTH & IRC Specification.
  • Giving assistance of Senior in all aspects of Construction Supervision, surveys, calculation of quantities of road work.
  • Managing highway-related projects from conceptual stages through all phases of pre and post- contract activities.
  • Supervising and overseeing the work of project design team members including senior engineers, engineers and graduates.
  • Coaching, mentoring and developing junior staff.
  • Managing and developing both internal and external client relationships and identification and management of project risks.
  • Undertake the role of Project Manager as necessary.
  • Knowledge of standard engineering practices, techniques and procedures.
  • Managerial responsibility for scheduling and resourcing project teams and related staff development activities.


Deputy Project Manager

SS INFRAZONE PVT. LTD.
04.2021 - 10.2021
  • Project - Shillong-Dawki Road Project Improvement/ Widening to 2-Lane With paved Shoulder to -Laningof NH-0, Project Length- 11.60 K.M Package- 01
  • Client - NHIDCL
  • Project Cost - Rs. 102.00 Crores Execution of Earthwork, GSB, WMM, DBM & BC for man carry way and service road asper technical specification, quality control test as per MORTH' S 5th revision at site.
  • Monitor progress of work, site engineers, supervisors, labours and machinery in my section.
  • Prepare day to day progress report as per site work and handling task given by the Management.
  • Liaise with consultant, sub-contractors, planners and surveyors.
  • Handling all activity of Highway construction independently.
  • Planning of construction operations.
  • Handle local issue that may come up during a project.

Highway Manager

GAYATRI PROJECTS LIMITED
10.2018 - 03.2021
  • Project - Development of Purvanchal Expressway Greenfield Project (Six Lane) Package II (Km.0+200 to Km. 79+900) in State Uttar Pradesh
  • Client - UPEIDA
  • Consultant - Egis India Pvt. Ltd.
  • Project Cost - Rs. 1276.00 Crores Conduct Road & Structure Inventory.
  • Carryout Survey as per schedule of Project as per agreement and Site conditions regarding highway and structure.
  • Execution of laying of Earthwork, Granular Sub-base, wet mix, macadam, Dense Bituminous Macadam, Bituminous Concrete (Main carriageway and service road) as per technical specification, quality control test conduct as per MORTH 5th Revision at site.
  • Execution of medium drain, chute Drain, Slope protection (Turfing/Stone Pitching) Geocell on slopes.
  • Checking of safety arrangement before execution of work.
  • Execution and supervision of approved design and drawings as per Plan and Profile of Highway and Structure as per site conditions.
  • Day to day progress report preparation as per site work and RFI and also handling task given by the management.
  • Monitor Progress of work, Site Engineers, Supervisors, Labour and Machinery in my section and utilized machinery and man-power according to site conditions.
  • Maintain site records.
  • Liaise with Consultant, Sub-Contractors, Planners and Surveyors.

Senior Highway Engineer

Gayatri Project Ltd.
06.2016 - 10.2018
  • To complete monthly target given by planner such as Embankment Construction, Subgrade preparation according to guidelines.
  • Liaise with Engineer and Junior Engineer, supervision to work accordance to the given plan.
  • Monitoring day to day activity of the site.
  • To follow my senior instruction to complete the work.
  • Liaise with Consultant and Client to complete the given target.
  • Project - Four laning of Sultanpur to Varanasi Section NH-56 Package-I from Km. 13.70 to Km205 in State Uttar Pradesh under NHDP PhaseIV.
  • Client - NHAI
  • Project Cost - Rs. 986.00 Crores

Senior Highway Engineer

GVR INFRA PROJECTS
11.2014 - 06.2016
  • Project - Rehabilitation and Up-gradation of Sindoor River to Start of Bareli Bypass Section of NH 12 from existing 130.10 to Km. 19 to four laning with paved shoulder in M.P.

Highway Engineer

Tele Communication Consultants India Limited
11.2011 - 10.2014
  • Project - Bina- Kurwai Sironj Road (MPRDC Project) in M.P.SH No.-61, Length-56. Km., Cost-107.00 Cr.

Highway Engineer

Tele Communication Consultants India Limited
07.2007 - 10.2011
  • Project - Highway Engineer in PWD work awarded to TCIL from Dhamtari to Nagri(6.72 Km.) in Chhattisgarh.

Skills

Project coordination

Timeline

Project Manager Highway

SHALIMAR CORPORATION LIMITED
01.2025 - Current

Deputy Project Manager

SHALIMAR CORP LIMITED
07.2023 - 12.2024

Deputy Project Manager

ARSS INFRASTRUCTURE PROJECTS LTD
12.2021 - 07.2023

Deputy Project Manager

SS INFRAZONE PVT. LTD.
04.2021 - 10.2021

Highway Manager

GAYATRI PROJECTS LIMITED
10.2018 - 03.2021

Senior Highway Engineer

Gayatri Project Ltd.
06.2016 - 10.2018

Senior Highway Engineer

GVR INFRA PROJECTS
11.2014 - 06.2016

Highway Engineer

Tele Communication Consultants India Limited
11.2011 - 10.2014

Highway Engineer

Tele Communication Consultants India Limited
07.2007 - 10.2011

10th (High School) -

UP Board
04.2001 -

12th (Intermediate) -

UP Board
04.2001 -

B.E.(Civil) -

Pt. Ravi Shankar Shukla University
04.2001 -

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Languages

English
Hindi
Pradeep Kumar SinghProject Manager Highway