Summary
Overview
Work History
Education
Skills
Training
Disclaimer
Personal Information
Quote
Timeline
Generic
R. YUVARAJ

R. YUVARAJ

Supply chain management /Production planning and Control
Chennai,Tamil Nadu

Summary

Focused and successful operation manager with expertise in planning, scheduling, and process improvement. Demonstrates exceptional composure and adaptability in high-pressure situations. Utilizes extensive knowledge of industry trends to provide valuable insights on opportunities for new growth and expansion. Skilled in evaluating current business functions and implementing Lean manufacturing tools to drive cost reduction and enhance efficiency. Proficient in cross-training staff members to perform diverse tasks while maintaining stringent quality control standards. Ensures compliance with federal and state OSHA regulations as well as ISO 9001 guidelines.

Overview

16
16
years of professional experience
8
8
years of post-secondary education
3
3
Languages

Work History

Assistant Manager (PPC-16Year Experience)

India Metal One Steel Plate Processing Pvt. Ltd.
Andrapradesh
01.2012 - Current
  • Company Overview: Japanese steel trader Metal One Corporation and Keiyo Blanking Kogyo Co., Ltd
  • Has started construction of a steel plate processing joint venture in India to meet the increasing plate demand for the construction machinery sector.

Role and Responsibility/Achievements

  • Raw material planning for all projects I have been in charge to maintain the stock at our end
  • Based on our business plan requirements from the PPC department
  • We have the process Primary, secondary, welding line, and Shot blasting and Painting processes
  • In the above process, I have been working with all internal departments to meet our customer requirements against the company’s targets
  • To enhance the process flow improvement tools 5S and kaizen utilizing to follow by all employees
  • I did both to contribute to the company's process improvement and cost-saving projects
  • 50000Ton cut process capacity yearly raw material cycle of the process to feed to line process flow monitoring daily, Weekly, and monthly requirement
  • I played a major role playing to make the company's annual turnover to 500Hurdred crore
  • During the development stage Caterpillar and Larsen& Toubro were the only customers handling during the period of 2012 to 2014
  • After that we got an order from Kobelco Construction Company in 2014 and 2015 Tata Hitachi, Liugong, XCMG, VESTAS, AND Doosan
  • Our company has many awards for supplier-end delivery performance, Quality, New product development, and Export product performance among other competitors

Assistant Engineer (Production Planning & Control)

Keiyo Blanking Kogyo Co., Ltd.
Ichihara
02.2012 - 04.2012
  • Trained contents: Tensuite software, Sales, Production Planning & Control, Production, CAD/CAM, Inventory & Logistics

Planning Assistant (Production Planning & Control)

The KCP Limited
Chennai
05.2009 - 01.2012
  • Company Overview: KCP Group has been a leading industrial group in South India for over seven decades
  • They manufacture Sugar machinery, Cement machinery, Steel castings, Heavy Gears, Boilers and pressure vessels, Plate Working Machines, Steel Plant equipment, equipment for Nuclear Installations, and Space Applications and defense Equipment

Achievements

• Since 2009, I have been selected for the first interview. I was selected as a trainee.
• I learned how to make feasibility studies and sketches for the manufacturing industry that were needed to make the Foundry, Fabrication, and Machining process knowledge expertise.
• Process flow for the products and how to make flow-based operations sequences expertise.
• Sales, Quality, manufacturing, Purchase, Design, Cad Cam, and Logistics how to work with interdepartmental against our company target to drive and contribute.
• Inventory management based on the customer delivery date. Drive has been driven through raw materials, BOC, Supplier supply, and Internal vendors make to stock the material based on the processing time we were fixed parts and Sub assembly Quantity maintained in the assembly area and store.
• Our customers L&T, BHEL, FLS SMITH, RELIANCE INDUSTRIES,TATA CHEMICAL,THYSSENKRUPP,INDIA CEMENT,HUMBOLDT, AND ISRO
• Raw materials handling Plates, Casting, Forgings and Tubes Etc..,
• During the 2009 TO 2010 FY I had been part of 158Core turnover and achieved the company's goal during the Fiscal year.
• I was appreciated and promoted by the company as a Planning Assistant in 2011.

Roles and Responsibility

  • Obtaining orders of sales from the sales departments and receiving consents for production
  • Planning, Methoding, Scheduling and Monitoring & Subcontracting
  • Study of drawings, Specifications, and Bill of Materials
  • Preparation of raw material requirements (Plates) and Purchase Technical Specification (PTS) for forgings during the initiation of the procurement activity
  • Preparation of fabrication and machining components sketches/drawings using AutoCAD for easy execution of jobs
  • Preparation of manufacturing schedule for the execution of Projects
  • Designing of jigs and fixtures to reduce the production time
  • Preparation of yearly, monthly, and weekly plan reports
  • Coordination with inter-department/customer
  • Dispatch Planning (Packing, Logistics (National & Exports) activities)
  • Coordination with Engineering, Purchase, Manufacturing, Quality & Cost Control departments
  • Inspect/arrange for Inspection prior to dispatch
  • Preparing sequence of execution by making individual assemblies, and sub-assemblies & obtaining product's final shape using ORACLE –ERP
  • ISO & ASME Documentation work
  • KCP Group has been a leading industrial group in South India for over seven decades
  • They manufacture Sugar machinery, Cement machinery, Steel castings, Heavy Gears, Boilers and pressure vessels, Plate Working Machines, Steel Plant equipment, equipment for Nuclear Installations, and Space Applications and defense Equipment
  • During the 2009 TO 2010 FY I had been part of 158Core turnover and achieved the company's goal during the Fiscal year.

Education

Bachelor of Science - Mechanical Engineering

Sathyabama University
Chennai,India
06.2012 - 12.2015

High School Diploma -

V. Ramakrishna Polytechnic College
Chennai, India
01.2007 - 04.2009

High School Diploma -

Sri. V.ramakrishna Hr. Sec School
Chennai, India
01.2004 - 04.2006

Skills

Material Requirement Planning

undefined

Training

Keiyo Blanking Kogyo Co., Ltd., 74-2,Yawata-Kaigan-dori, Ichihara, Chiba, 2900067, Japan, Assistant Engineer (Production Planning & Control), 02/02/12, 05/02/12, Tensuite software, Sales, Production Planning & Control, Production, CAD/CAM, Inventory & Logistics

Disclaimer

I hereby declare that the above furnished details are true to the best of my knowledge.

Personal Information

  • Number of Children: Only one Daughter
  • Date of Birth: 06/19/89
  • Nationality: Indian
  • Marital Status: Married

Quote

Every problem is a gift—without problems we would not grow.
Tony Robbins

Timeline

Bachelor of Science - Mechanical Engineering

Sathyabama University
06.2012 - 12.2015

Assistant Engineer (Production Planning & Control)

Keiyo Blanking Kogyo Co., Ltd.
02.2012 - 04.2012

Assistant Manager (PPC-16Year Experience)

India Metal One Steel Plate Processing Pvt. Ltd.
01.2012 - Current

Planning Assistant (Production Planning & Control)

The KCP Limited
05.2009 - 01.2012

High School Diploma -

V. Ramakrishna Polytechnic College
01.2007 - 04.2009

High School Diploma -

Sri. V.ramakrishna Hr. Sec School
01.2004 - 04.2006
R. YUVARAJSupply chain management /Production planning and Control