* Proficient Project Engineer with 5+ years of experience driving over 8 projects to completion. Skilled in overseeing technical staff and checking that projects are completed on schedule, within budget, and according to specifications.
* Secondary Design Engineer with 4+years of experience and Working procedure bellow
1.Studying the specification received along with the project.
2.Collection of Required inputs by following up with
customer.
3.Involved in Technical discussion with the customer.
4.Preparation Feeder Block Diagram, Trip matrix, System
Overview, FO cable list, Interlocking document, Panel layouts,
Mimic-BCM802 , Main material List , Voltage selection concepts.
5.Preparation of Signal Lists, like Relay I/O, BCU I/O,
Annunciation & SCADA
6.Preparation of the scheme drawings.
7.Co-ordination with existing panels, Circuit Breaker,
Isolators and Power line carrier communication equipment.
8.Sending the drawings and continuous following up with the
PM/Customer for approval.
9.Once the approval is received issue of necessary indents to
respective dept's for the manufacturing of the panels.
10.Interaction with Testing dept/Production dept to complete
internal testing before customer inspection.
11.Incorporating the comments if any during FAT.
12.Completion of the project
*Testing Engineer With 1+ years of experience and Working procedure bellow
1.Control Relay Panel Scheme check up to 400kV system.
2.Substation Protection Relay configuration & all types of relay testing using Omicron &Doble.
3.Inspection of control and relay panel, preparation of Test Report and cable schedule for sub-station.
4.Relay/control panel, BCU, operational interlocks trouble shooting.