Summary
Overview
Work History
Education
Skills
Certification
Accomplishments
Languages
Timeline
Generic
Rajivgandhi Veerapandiyan

Rajivgandhi Veerapandiyan

Tamilnadu

Summary

Dynamic project manager with extensive experience at Elite Elevators, excelling in installation planning and team leadership. Achieved a 95% customer satisfaction rating through strategic resource allocation and robust maintenance scheduling. Proven track record in safety compliance and quality assurance, driving successful project outcomes in high-pressure environments.

Overview

17
17
years of professional experience
1
1
Certification

Work History

Assistant Manager-New Installation

Elite Elevators
Chennai
12.2024 - Current
  • Spearheaded installation and commissioning of high-end residential elevators, ensuring compliance with safety regulations and industry standards.
  • Developed comprehensive project plans, execution strategies, master schedules, and budgets.
  • Conducted cost-benefit analysis, feasibility studies, and assessments of project requirements.
  • Anchored complete installation and commissioning of equipment by analyzing blueprints and technical drawings.
  • Planned predictive, preventive, and corrective maintenance to minimize equipment downtime.
  • Established Standard Maintenance Procedures for critical equipment, maintaining checklists during maintenance activities.
  • Performed regular site inspections to monitor progress and implement corrective actions.

Senior Installation Engineer

Kone Elevator Ind Pvt Ltd
Chennai
10.2023 - 01.2024
  • Planned and scheduled installation activities, optimizing material and manpower planning for the successful installation of 17 Kone Monospace elevators across 7-10 story residential buildings
  • Developed comprehensive installation programs, reducing project timeline by 3 months through strategic resource allocation and detailed scheduling
  • Achieved a 9/10 customer satisfaction rating by implementing robust maintenance schedules and prompt issue resolution
  • Directed a team of technicians, ensuring project deadlines were met with 100% SLA adherence, utilizing strong leadership and coordination skills
  • Led site meetings and coordinated with sub-contractors, achieving accelerated work progress resulting in the early completion of 10 elevator installations
  • Reviewed contracts and agreements post-sale, aligning project execution with contractual and technical specifications to ensure seamless handover and implementation
  • Efficiently procured materials through proactive follow-up with the procurement department, ensuring on-time delivery for installation projects across multiple sites
  • Handled project correspondence, facilitating smooth internal communication and swift resolution of project-related issues, enhancing overall project coordination by 25%

Installation Supervisor

TK Elevator
Qatar
04.2021 - 04.2023
  • Managed erection and installation, and testing and commissioning of 71 fire-rated and 4 twin elevators across Lusail Plaza Tower, incorporating DCS, BMS, and seismic systems for enhanced operational efficiency
  • Installed 8 elevators with speeds ranging from 7.5m/s, optimizing vertical transportation across high-rise structures for improved accessibility and efficiency
  • Strategically planned staff and allocated resources to meet stringent project deadlines for the construction of a 'floor tower' ensuring timely completion and client satisfaction
  • Proactively identified and resolved project issues, achieving zero safety incidents, minimizing downtime, and optimizing workflow efficiency throughout the construction phases
  • Provided bi-weekly updates to management on project status, enabling informed decision-making and proactive adjustments to ensure project milestones were met effectively
  • Evaluated construction contractors and implemented tailored planning strategies, achieving streamlined operations and adherence to project timelines within a dynamic construction environment
  • Ensured site safety by promptly addressing obstacles and implementing comprehensive risk mitigation measures, fostering a secure work environment and maintaining regulatory compliance

Project Engineer

Schindler Ind Pvt Ltd
Hyderabad
12.2017 - 06.2020
  • Managed installation projects at Amazing IT Campus, overseeing the installation of 50 Fire rated elevators using 6.0R and 6.0M models, enhancing functionality with 3257, SIMS, and BMS systems
  • Led installation projects at My Home Twitza, installing 20 elevators with speeds of 2.5m/s to 3.0m/s and capacities ranging from 1000kg to 1600kg, integrating advanced operational systems for optimized performance
  • Reduced project defects by 30% through stringent quality assurance measures and meticulous project oversight, ensuring compliance with industry standards and client specifications
  • Achieved a 95% customer satisfaction rating by enhancing project planning and stakeholder communication, utilizing project management expertise to deliver results on time and within budget
  • Conducted comprehensive inspections and evaluations of installed systems, ensuring adherence to safety regulations and operational efficiency, facilitating seamless project transitions

Junior Service Examiner

Otis Elevator Dubai LLC
Dubai
07.2013 - 02.2017
  • Supported installation teams in setting up and maintaining elevators, ensuring timely project completion and enhancing client satisfaction
  • Assisted senior installers in assembling elevator components and implementing control systems, contributing to the installation of 100 elevators
  • Conducted detailed pre-installation inspections, ensuring readiness of all tools and materials, and reducing project delays by 15%
  • Executed post-installation tests to verify functionality, promptly resolving identified issues to maintain high operational standards
  • Collaborated effectively with team members to streamline processes, improving overall project efficiency and safety compliance

Elevator Field Mechanic

Kone Elevator ,ndia Pvt Ltd
Mumbai
06.2008 - 10.2011
  • Installed and maintained elevators, ensuring compliance with safety regulations for safe and efficient operation, utilizing expertise in regulatory adherence and technical proficiency
  • Collaborated with a team of 5 to successfully execute elevator installation projects within strict timelines, deploying strong project management skills
  • Conducted regular inspections and performed repairs to optimize elevator performance, enhancing reliability and operational efficiency
  • Maintained accurate documentation of all installations, repairs, and maintenance activities, ensuring compliance with audit requirements and future reference

Education

Graduate Diploma - Diploma in Electronics

Er. Perumal Manimekalai Polytechnic College
India
01.2008

Skills

  • Project Management
  • Team Leadership
  • Installation Planning
  • Elevator Installation
  • Technical Troubleshooting
  • Safety Compliance
  • Contract Management
  • Resource Allocation
  • Customer Satisfaction
  • Maintenance Scheduling
  • Equipment Procurement
  • Regulatory Adherence
  • Quality Assurance

Certification

  • Completed the Supervisory Skill Development Program (SSDP) administered by PGS Industrial Institute.
  • Completed the Construction Supervisor Academy (CS program hosted by OTIS Elevator Dubai LLC in Abu Dhabi, UAE.
  • TXGC Commissioning and Troubleshooting Training Certified from Schindler Training Centre - West - AXJ, 2019.
  • S7000 Installation Training Certified from Schindler Training Centre - West - MD, 2019.
  • TK Elevator Controller Testing and Commissioning Training: MC1 and MC2 Product.
  • Lifting Supervisor.
  • First Aider.
  • Work At Height Supervisor Training.
  • Permit Holder Training.
  • Power Tools Training.

Accomplishments

  • Received recognitions and rewards, including 'Quarterly Rials' for achieving Outstanding Safety Performer in February 2023 at TK Elevator.
  • Earned a Safety Award in January 2022 from MICK Construction for the Lusail Plaza Tower site.
  • Successfully installed elevators without safety incidents, earning a Safety Award in January 2021 from MICK Construction for the Lusail Plaza Tower site.

Languages

  • Hindi
  • English
  • Tamil

Timeline

Assistant Manager-New Installation

Elite Elevators
12.2024 - Current

Senior Installation Engineer

Kone Elevator Ind Pvt Ltd
10.2023 - 01.2024

Installation Supervisor

TK Elevator
04.2021 - 04.2023

Project Engineer

Schindler Ind Pvt Ltd
12.2017 - 06.2020

Junior Service Examiner

Otis Elevator Dubai LLC
07.2013 - 02.2017

Elevator Field Mechanic

Kone Elevator ,ndia Pvt Ltd
06.2008 - 10.2011

Graduate Diploma - Diploma in Electronics

Er. Perumal Manimekalai Polytechnic College
Rajivgandhi Veerapandiyan