Rashik GUPTA

Dholpur

Summary

  • Construction experience of RCC retaining earth wall, box culvert, MNB, VUP, PUP, drainage, and PSC girder, snow net protection, MSC wall (Mechanically Stabilized Earth Protection Wall).
  • Planning (short-term and long-term).
  • Knowledge of preparation, Subcontractor monthly bills, maintaining records of site work, and machinery report.
  • Preparation of Material Requirement Schedule, manpower, and machinery deployment schedule.

Overview

6
6
years of professional experience
1
1
Certification

Work History

Site Engineer (Str)

Galfar Engineering & Contracting (India) Pvt. Ltd.
10.2023 - Current

Project name :- Upgradation 2 lane to 4 lane of Rajasthan Border-Fatehpur-Salasar Section of NH-65 (new NH-52 & 58) (Length-154.141) in the state of Rajasthan on Design, Build, Finance, Operate and Transfer (DBFOT) basis.

  • Client :- NHAI
  • Cost of project :- 976 cr
  • Responsibility :- Vup - Total structure of Vehicular underpass=3 Nos ( 1*12*5.5)
  • Box culvert and pipe culvert: total number of box culverts = 17 (sizes 2x2, 3x3), total number of pipe culverts = 16.
  • ROB: Dudvakhara Total number of spans - 3 (total length of ROB 90 m).
  • Flyover: Fatehpur - total length of PSC girder 30 m, open foundation.
  • Cup: Cattle underpass 07 nos (1*7*3.0)

Str. Engineer

Skylark Infra Engineering Pvt. Ltd.
12.2021 - 10.2023

Project name :- Upgradation to intermediate lane of NH-301 Kargil-Zanskar Road from Km 117+180 to Km. 148 + 320 in the state of Jammu and Kashmir on EPC mode.

  • Client :- Nhidcl
  • Cost of project :- 1500 cr
  • Responsibility :- MNB - Total structure of minor Bridge=15 Nos ( Different Sizes)
  • Box culvert - total number of box culverts = 22 (size 2X2, 3X3).
  • Rangdum Bridge: 2-lane bridge of single span with a length of 25 m; Foundation: open foundation.
  • Gonpa Bridge: 2-lane bridge of single span with a length of 25 m; Foundation: open foundation.
  • Tashi Bridge: 2-lane bridge of single span with a length of 25 m; Foundation: open foundation.
  • Major Bridge - Suru Bridge (total length of bridge 254 m, total number of spans = 10, open foundation in abutment).

Site Engineer

Kcc Buildcon Pvt.Ltd
10.2019 - 11.2021

Project name :- 4-laning of Dhangaon-Boregaon section of NH-347BG & 753L (Indore to Boregaon-Pkg IV) Design Ch.81.000 to 139.000 (Length 58.000 Km) under Bharatmala Pariyojana Phase -I in the State of MadhyaPradesh.

  • Client :- NHAI
  • Cost of project :- 806 cr
  • Responsibility :- Vup - Total structure of Vehicular underpass=6 Nos ( 1*12*5.5)
  • MNB - Total structure of minor bridges: 3 nos (different sizes).
  • Lvup: Total structure 02 (1 * 10 * 4.5)

Education

B.tech - Civil Engineering

Poornima University
Jaipur
05-2019

Polytechnic -

Diploma
BTER
04-2015

Diploma - Diploma in Railway Work

The Institution of Permanent Way Engineers
Delhi
11-2017

Skills

  • Windows98
  • Windows2000
  • WindowsXP
  • MS-Word
  • MS-Excel
  • MS-Power Point
  • Maintenance of Computer system
  • Installation of Computer system
  • Surfing
  • Email
  • AUTO CAD 2D
  • Ability to rapidly build relationship
  • Ability to set up trust
  • Ability to cope up with different situations

Minor Projects

Rain Water Harvesting System, To make something economical and beneficial to reuse of water for college campus.

Languages

  • Hindi
  • English

Certification

Codineter is in the cultural fest at Poornima University

Silver medal in the kabaddi sport fest

Affiliations

  • Executive member of the Sports Committee at Poornima University

Hobbies and Interests

  • Reading Novel
  • Playing Games

Personal Information

  • Father's Name: Ved Prakash Gupta
  • Mother's Name: Sarita Gupta
  • Date of Birth: 05/11/1993
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Single

Disclaimer

I do hereby declare that the above information is true to the best of my knowledge.

Timeline

Site Engineer (Str)

Galfar Engineering & Contracting (India) Pvt. Ltd.
10.2023 - Current

Str. Engineer

Skylark Infra Engineering Pvt. Ltd.
12.2021 - 10.2023

Site Engineer

Kcc Buildcon Pvt.Ltd
10.2019 - 11.2021

B.tech - Civil Engineering

Poornima University

Polytechnic -

Diploma

Diploma - Diploma in Railway Work

The Institution of Permanent Way Engineers
Rashik GUPTA