Summary
Overview
Work History
Education
Skills
Certification
Timeline
INFRACON ID
Key Qualifications
Disclaimer
Generic
Ravi Srivastava

Ravi Srivastava

Senior Manager (QA/QC)
158, Salarpur Mudrasan Near-Pond Dist-Sitapur

Summary

With over 20 years of extensive experience in civil engineering, specializing in the construction of state highways, national highways, and expressways, offers a proven track record in quality assurance and quality control. Expertise in modern construction techniques and equipment, along with a thorough understanding of IS and IRC codes and MORTH specifications, positions as a strong candidate for the Senior Manager/AGM-QA/QC role. Experience on diverse construction projects across India ensures a commitment to driving excellence in future projects. Eager to bring this expertise to your esteemed organization and contribute to its continued success.

Overview

2
2
Languages
1
1
Certification
20
20
years of professional experience

Work History

Senior Manager (QA/QC)

Uttar Pradesh Expressways Industrial Development Authority
08.2022 - Current
  • Concessionaire: Adani Road Transport Limited
  • Employer: Cemindia Project Limited, Mumbai
  • Consultant: Dhruv JV Artefact Association Global Infra Solutions.
  • Client: UPEIDA
  • Development of an Access-Controlled Six lane (Expandable to Eight lane) Greenfield 'Ganga Expressway' [Group-IV, (from Km. 445+000 (Village: Sarso, Distt: Unnao) To Km. 601+847 (Village: Judapur Dando, Distt: Prayagraj) Design length=156,847 Km)] in the State of Uttar Pradesh on DBFOT (Toll) basis under PPP. Cost: INR 4900 Cr. Project Length- 156.847 Km.

Material Engineer (QA/QC)

Uttar Pradesh Expressways Industrial Development Authority
09.2020 - 08.2022
  • Employer: PNC Infratech Limited, Agra
  • Consultant: Ayesa – SA Infrastructure Ltd (JV).
  • Client: UPEIDA
  • Six-Lane Development of Purvanchal Expressway (Package-VI) From Gobindpur (Dist. Azamgarh) to Mojrapur (Dist. Azamgarh) (Km 218+300 to Km 246+500) in the State of Uttar Pradesh on EPC Basis. Project Cost: INR 1200 Cr. Project Length- 28.20 Km.

Sr.Manager (QA/QC)

Uttar Pradesh Expressways Industrial Development Authority
01.2018 - 09.2020
  • Employer: G R Infraproject Limited, Udaipur
  • Consultant: Ayesa – SA Infrastructure Ltd (JV).
  • Client: UPEIDA
  • Six-Lane Development of Purvanchal Expressway (Package-VII) From Mojrapur to Bijuaara (Km 246+500 to Km 292+530) in the State of Uttar Pradesh on EPC Basis. Project Cost: INR 1500 Cr. Project Length- 46.030 Km.

Sr. Manager (QA/QC)

Madhya Pradesh Road Development Corporation
01.2017 - 12.2018
  • Employer (Concessionaire): Elsamex Maintenance Service limited Group Company of IL&FS Transportation Network Limited
  • Consultant: MSV International USA-HEC (JV).
  • Client: Madhya Pradesh Road Development Corporation
  • Widening and Reconstruction of Madhya Pradesh District Road II Sector Project - Package No. 10: Bariya Choki - Lugasi-GharilMahara Road (MP-MDR-35-0 6), Bamitha- Dumra Road (MP - MDR-35-07), Rajnagar-Bachhon Road (MP-MDR-35-10), KhapariaBansphari Road (MP-MDR-35-13) & Chhatarpur- Vikrampur- Rajnagar Road (MP-MDR-35-23). Project Cost: INR 213.54 Crores. Project Length- 102.50 Km (Rigid Pavement).

QA/QC Manager

National Highways Authority of India
05.2015 - 01.2017
  • Employer (Concessionaire): Constructora Sanjose, Spain
  • Consultant: Theme Engineering service Pvt.Ltd.
  • Client: National Highway Authority of India
  • Up -Gradation of Raebareli-Banda Section of NH-232 to 2-lane with paved Shoulder from km 152.533 (existing chainage 152.600 of NH-232) to km 285.818 (existing chainage 319.610 of SH-13) in the state of Uttar Pradesh on EPC Mode. Project Cost: INR 424.29 Crores. Project Length- 132 Km.

AQME

National Highway Authority of India
12.2013 - 05.2015
  • Employer: STUP Consultants Pvt.Ltd. Mumbai
  • Client: National Highway Authority of India
  • Concessionaire: Essel Infra Projects Ltd.
  • Construction Supervision of Four Laning of Lucknow-Raebareli section from Km 12+700 to 82+700 of NH-24B in the state of Uttar Pradesh under NHDP Phase IV A. Project Cost: INR 500 Crores. Project Length- 70 Km.

QA/QC Manager

Madhya Pradesh Road Development Corporation
03.2011 - 12.2013
  • Employer: DILIP Buildcon Limited,Bhopal
  • Client: M.P.R. D.C
  • Consultant: Ict. Pvt.Ltd.
  • Rehabilitation Up gradation (Major Maintenance) Widening work under Phase -III, State Highway -15 from Badi to Budhni & Udaypura to Silwani Road Project (0+000 to 60+000) & (0+000 to 30+000) MPSRP/Package -07. Project Cost: INR 101 Cr. Project Length- 90 Km.
  • As Quality Manager, responsible for:
  • Preparation and establishment of Quality Assurance Program for the project
  • Mix designs of bituminous concrete and cement concrete modifications in the mix design, laying methods, sampling and testing procedure and quality control measures, to ensure the required standard and consistency of items.
  • Ensuring that the materials delivered to sites comply with specifications.
  • Monitoring setting up of testing laboratories and ensuring that the laboratories are staffed with qualified personnel and equipped with duly calibrated testing equipment during the entire course of the assignment.
  • Supervise the setting up Crusher Plant and Bituminous Mixing Plant and also perform and/or supervise production of materials and testing of various materials as per Quality Assurance Manual.
  • Testing the soils and other materials by carrying out various tests to determine their suitability and ensure that the material testing and sampling area in accordance with specifications.

Sr.Quality Control Engineer

Madhya Pradesh State Road Project
05.2010 - 03.2011
  • Employer: M/s MBL Infrastructures Ltd, Delhi
  • Client: M.P.R. D.C
  • Consultant: Scott Wilson Pvt.Ltd.
  • Rehabilitation Upgradation(Major Maintenance) Widening work under phase -II,State Highway -10 from Amanganj to Malhera Road(Ch12+800 to 89+640)MPSRP/Package-10. Cost: INR 68 Crores. Project Length- 77.0 Km.

Quality Control Engineer

Uttar Pradesh State Roads Project
03.2009 - 05.2010
  • Employer: M/s MBL Infrastructures Ltd, Delhi
  • Client: UPPWD (World Bank)
  • Consultant: Scott Wilson Pvt.Ltd./Smec India Pvt.Ltd.
  • Rehabilitation Up gradation (Major Maintenance) Widening work under phase -II, State Highway -26 from Rajaganj to Near Sarada Bridge (118+000 to 156+000) UPSRP/RMC -31. Cost: INR 30.3 Crores. Project Length- 38.0 Km.

Asst.Quality Control Engineer

Uttar Pradesh State Roads Project
07.2006 - 03.2009
  • Employer: M/s K.N.R Construction Ltd, Hyderabad
  • Client: UPPWD (World Bank)
  • Consultant: Scott Wilson Pvt.Ltd.
  • Managed rehabilitation and widening work for phase-II, State Highway-26 from Khuttar to Rajaganj (Ch. 75 + 200 to 118+000) under Uttar Pradesh Road Project Loan No. 4684-IN, ensuring project adherence to budget of INR 42 Crores and completion of 44 Km.

Education

B. Tech - Civil Engineering

UPTU
Jhansi, India
06-2006

Skills

Team Leadership

Material testing

Material strength analysis

Laboratory equipment management

Material testing

Material compliance assurance

Quality assurance

Equipment Compliance Oversight

Certification

Participated in the workshop on Mix Design of hot mix asphalt (HMA) using reclaimed asphalt pavement (RAP) material jointly organized by IIT(BHU) Varanasi, M/s G R Infraproject Ltd and National Highway authority of India held on 2020-02-07.

Timeline

Senior Manager (QA/QC)

Uttar Pradesh Expressways Industrial Development Authority
08.2022 - Current

Material Engineer (QA/QC)

Uttar Pradesh Expressways Industrial Development Authority
09.2020 - 08.2022

Sr.Manager (QA/QC)

Uttar Pradesh Expressways Industrial Development Authority
01.2018 - 09.2020

Sr. Manager (QA/QC)

Madhya Pradesh Road Development Corporation
01.2017 - 12.2018

QA/QC Manager

National Highways Authority of India
05.2015 - 01.2017

AQME

National Highway Authority of India
12.2013 - 05.2015

QA/QC Manager

Madhya Pradesh Road Development Corporation
03.2011 - 12.2013

Sr.Quality Control Engineer

Madhya Pradesh State Road Project
05.2010 - 03.2011

Quality Control Engineer

Uttar Pradesh State Roads Project
03.2009 - 05.2010

Asst.Quality Control Engineer

Uttar Pradesh State Roads Project
07.2006 - 03.2009

B. Tech - Civil Engineering

UPTU

INFRACON ID

ravisrivastava557@gmail.com

Key Qualifications

More than 20.0 years of rich experience in material testing and quality control of 2/4/6-lane highways and other projects in various states of India. My spectrum of experience includes supervising setting up of field-testing laboratories including calibration of equipment, investigation of borrow areas, planning and designing of testing schedule, soils and materials testing, preparing specification for variety of construction materials, material procurement, review of bituminous and concrete mix designs, monitoring and setting of crusher and bituminous mix plant, machinery and materials. Substantial familiarity with modern highway construction technology like use of geo-textiles, polymer modified bitumen etc. and contractual arrangements. Well conversant with relevant Indian standards and have done extensive work on bituminous and non-bituminous mix designs, calibration of plants and lab instruments. Excellent insight in the development of quality control system and great zeal in the implementation of quality control system. Have excellent experience in the setting up and running of material testing laboratory.

Disclaimer

I hereby declare that all the information furnished in this resume is true, complete, and accurate to the best of my knowledge and belief. I understand that any misrepresentation may lead to disqualification of my candidature.

Place: Sitapur, Uttar Pradesh

Ravi SrivastavaSenior Manager (QA/QC)