Summary
Overview
Work History
Education
Skills
Reporting To
Addresses
Languages
Hobbies and Interests
Projects
Overall Experience
Personal Information
Timeline
Generic

Rudra Pratap Singh

Siwan

Summary

Operation Manager having 10 Years of Experience in Operation Managment and Project Managment in Steel and Gas Plant.Accomplished industry leader offering many years of management expertise including staff training and development, performance evaluation, and continuous improvement. Focused and efficient with proficiency in financial reporting and budget adherence. Demonstrated success in evaluating P&L to achieve targets.

Overview

11
11
years of professional experience

Work History

DEPUTY MANAGER- Pellet Plant

M/S SHYAM SEL AND POWER LTD
Jamuria
12.2020 - Current
  • Handle all modification and procurement specifications related to the palletization plant, especially the Balling disc, Travelling Grates, HR Fan, ID Fan, Kiln, and Annular Cooler.
  • Develop, govern, and provide technical direction to the operations team.
  • Monitor and ensure performance, productivity, and utilization.
  • Any breakdown maintenance in shifts, attending, and manpower allotment.
  • Job assignment to workmen as per the priority of process, skills, and time required.
  • To ensure the quality of work and safety during periodic maintenance.
  • Ensure that you achieve the target of KPA/KPI.
  • Proactively identifying issues related to processes and the resolution of constraints.
  • Shift arrangement and manpower handling.
  • Check list checking, changeover schedule update, updating dashboard, attending line walk.
  • Maintaining quality, production, costing, and job plan.
  • Guide the shift in charge and CRO for maintaining all parameters and required fields.
  • Operation of the travel grate furnace temperature, and its inlet and outlet pressure; operation of the hood box, and wind box.
  • Operation of Gravity Cyclone Temperatures, and its HR, ID Fans, Root Blowers, and Compressors.
  • Operation of TG discharge to the kiln, maintaining its temperatures, its fuel oil pumps, and its auxiliaries.
  • Operation of kiln discharge, cooler main drives, and their zone temperatures and cooling air fans.
  • Operation of the dryer and PCI.

Sr. ENGINEER OPERATION (PELLET & PGP)

ANKIT METALIKS
Bankura
09.2017 - 09.2020
  • Company Overview: (Pellet Plant with 0.6 MTPA Capacity)
  • Operation and maintenance of equipment such as Travelling Grates, Rotary KILN, Annular Cooler, Mixer, Balling disc, Conveyor, HR Fan, ID fan and all ancillary unit of pellet plant
  • Handle structural erection, equipment assembly, erection & alignment in all above sites
  • Plant Checking and abnormalities identification
  • Routine Maintenance and Process desired Modification job i.e., especially for Quality Change
  • Attending Breakdown jobs in minimum possible time
  • Job assignment to Workmen as per the priority of Process, skills and Time required
  • Managed safety of total all manpower while on duty
  • Responsible for spares management for Pellet & PGP
  • Responsible for managing Mechanical maintenance team for Pellet & PGP
  • Maintenance of all types of Pumps and Prepare of all Spares
  • Responsible for Prepare Spares Management
  • Maintenance of Hydraulic power pack and hydraulic system
  • (Pellet Plant with 0.6 MTPA Capacity)

SITE ENGINEER -Mechanical

M/S DEV ENERGY EQIUPMENT PVT LTD
07.2014 - 09.2017
  • Involve in Product Fabrication and Erection, Commissioning and Site Inspection for 100% Compliance of the project
  • Make site layout as per need and monitoring of pre commissioning activities
  • Planning and scheduling Bar chart and its maintaining and prepare site report
  • Developing plans for continuous improvement in the project, reviewing the operational Practices and coordination and problem resolution Fabrication, Erection and Commissioning
  • Worked in procurement Department for planning and purchase of materials
  • Comparing the standards of the products bought from our foreign vendors and furnished MIS report
  • Involve in at site drawing mistakes checking /modified
  • Managing Manpower (Skilled and Semi-Skilled) regular and contractual workers
  • Involve in prepare BOM and checking /Modified drawing changes
  • Provide direction and coordination the Engineering and Design leads on an assign project

Education

B.E - Mechanical Engineering

RGPV
Bhopal, MP
01.2014

12th (Science) -

01.2010

10th (S.S.L.C) -

01.2008

Skills

  • Cost analysis and savings
  • Process and procedure development
  • Operations management
  • Performance improvements
  • Adaptability and flexibility
  • Project management abilities

Reporting To

Manager (O & M)

Addresses

B-105 Shreeniwasnagar, VKIA, Jaipur, Rajasthan, 302013, Vill-Sadikpur, P.O-Pachrukhi, Siwan, Bihar, 841241

Languages

  • Hindi
  • English

Hobbies and Interests

  • Playing Cricket
  • Watching Movie

Projects

Fabrication and Erection of Double Stage Cold Gas Plant, 10, GASIFIER, Ranchi, Jharkhand, Jindal Group (Jindal Steel and Power Ltd) Fabrication and Erection of Double Stage Cold Gas Plant, 1, GASIFIER, West Godawari, Andhra Pradesh, Sirazee Tiles Pvt Ltd Fabrication and Erection of Double Stage Cold Gas Plant, 1, GASIFIER, Jamshedpur, Jharkhand, Tata Group (Tayo Rolls Ltd) Fabrication and Erection of Double Stage Cold Gas Plant, 1, GASIFIER, Jaipur, Rajasthan, BP Bharat (Ceramic Tableware Pvt Ltd)

Overall Experience

10.5 Years

Personal Information

  • Current CTC: 11.65 Lakh
  • Father's Name: Sh. Bipin Singh
  • Notice Period: 30 Days (Negotiable)
  • Date of Birth: 02/17/93
  • Gender: Male
  • Marital Status: Married

Timeline

DEPUTY MANAGER- Pellet Plant

M/S SHYAM SEL AND POWER LTD
12.2020 - Current

Sr. ENGINEER OPERATION (PELLET & PGP)

ANKIT METALIKS
09.2017 - 09.2020

SITE ENGINEER -Mechanical

M/S DEV ENERGY EQIUPMENT PVT LTD
07.2014 - 09.2017

B.E - Mechanical Engineering

RGPV

12th (Science) -

10th (S.S.L.C) -

Rudra Pratap Singh