Fully responsible for DCS based operation of FBC Boiler and Steam turbine and it’s auxiliary and Bop of Plant. Fully responsible for Boiler Preparation for boiler start-up, Boiler light up and smooth handling operation from control room desk during Plant Light-up. Fully responsible for Preparation & Rolling of Turbine through governor control system and DCS. Fully responsible for Smooth handling and operation at the Time of Plant Black out, Home Load and all emergency. Confidently handle emergency situation and make plant normal & smooth. Fully responsible for daily observing water, steam and condensate parameter, Fuel parameter, LOI report, and losses from various part of boiler & turbine. Fully Responsible to calculate Boiler efficiency, Turbine efficiency, Plant efficiency, Turbine Heat Rate, PLF, SSC, SCC, DM water Consumption. Dexterous in planning, scheduling and execution maintenance (Preventive, Predictive, Productive) for all equipment to achieve operation efficiency & resources utilization. Team leader of Plant Efficiency Team (PET) from Operation dept. side and play key role in calculating payback period and giving PPT presentation on all area of Plant.