Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Overview
19
19
years of professional experience
Work History
Area in charge
TPL Service Pvt Ltd (subsidiary of Tata projects Limited)
03.2021 - Current
As a Area in charge, I have done successfully work in conveyor belt replacement jobs (all type conv)), Drive Pm relative jobs, pulley replacement, gearbox replacement jobs with alignment & other conv related equipment jobs with my teammate on Global belt arc.
Troubleshooting of frequent RMHS issue like belt slippage, misalignment, overheating & abnormal vibration.
Day to day planning and scheduling of maintenance activities to timely execute and give start up for all pm in time to meet all requirements and deadlines in the best possible way.
Maintaining of site records like Daily Progress report (DPR), Man power report, Minutes of meeting (MOM) & Material requirement.
Planning and implementing the preventive and predictive maintenance schedules for improving the equipment conditions.
Involves in maintenance planning, manpower arrangement, tools & tackles arrangement for the maintenance activities.
Preparing and submitting the daily job progress report schedule to our clients.
Involves in re-conciliation of Material Issued for the maintenance work.
Knowledge on House Keeping techniques (5S Principle’s) to execute the efficiently.
Ability Work with planning Team to develop job packs for Shutdown.
Better planning in monthly shutdown & major shutdown jobs with proper manning.
Arrangement of monthly safety mass meeting, Aic meeting with client.
Client: Tata steel, Tsm
Tpl Service Pvt Ltd
01.2021 - Current
Tata Steel Meramandali
Sr. Engineer (Mechanical)
Pressmach Engg Pvt Ltd
05.2020 - 02.2021
Lead a team of maintenance professional, streamlining the process and implement the best methodology to reduce the machine downtime.
Maintain the pre & post job related checklist, maintain weekly billing.
Coordinate with other dept. to ensure alignment of maintenance activities with production schedule.
We are fabricate & erection of conv structure, its drive unit.
Maintain billing cycle with zero reduction about consequence management.
Client: Tata Steel, KPO
Press Mach Engineers Pvt Ltd
01.2020 - 01.2021
Tata Steel Kalinga Nagar
DET & Jr. Engineer (Mechanical)
Larsen & Toubro Ltd
08.2011 - 12.2017
Successfully identification, shifting, erection & commissioning of equipment, at RMHS-2 & erection and commissioning of heating and cooling furnace, ducting line, blower at CAPL.
Complete of major shutdown at G-BLASTFURNACE of equipment such as conveyor line, drill m/c, mud gun. of 1.8mtpa capacity
At PLTCM shutdown dismantling & installation of rolling mill, furnace at Jamshedpur.
Managing the functions of preventive/predictive/breakdown maintenance process machines to reduce downtime to minimum Preparing TPM Schedule, Annual Preventive Maintenance Plans, Costing, Checklists for Conducting
After Structural erection job & Equipment erection job completion at RMHS & CHP area, we are successfully commissioned it with zero casualty.
Maintain proper coordination with climate for smooth running of equipment.
Erection & commissioning of screen, vibrometer, magnetic separator, drive unit etc.