Summary
Overview
Work History
Education
Skills
Websites
Timeline
Generic

SAGAR GADRI

Rajasthan

Summary

Results-driven Mechanical Engineer with experience in Asset Optimization and Reliability Improvement in manufacturing environments. Skilled in analyzing MTBF and MTTR, conducting Root Cause Analysis (RCA), and implementing data-driven maintenance strategies to reduce downtime and improve equipment availability. Proficient in SAP (PM/MM) and Excel for maintenance planning and performance tracking. Focused on improving operational efficiency, reliability, and cost optimization.

Overview

4
4
years of professional experience

Work History

Engineer - Asset Optimization

Vaaman Engineers India Limited
01.2026 - Current
  • Monitored asset performance and improved maintenance KPIs, contributing to ~10-15% reduction in unplanned downtime
  • Analyzed MTBF and MTTR data to identify failure patterns and supported initiatives improving equipment reliability by ~10%
  • Conducted Root Cause Analysis (RCA) for recurring failures, reducing repeat breakdowns by ~15%
  • Supported optimization of preventive maintenance plans, improving maintenance compliance by ~20%
  • Utilized SAP PM for work order management, maintenance tracking, and historical data analysis
  • Developed Excel-based dashboards for tracking downtime, asset performance, and maintenance efficiency
  • Collaborated with maintenance and production teams to improve maintenance execution and reduce delays

Project Engineer

Tempsens Instruments India Limited
02.2024 - 12.2025
  • Managed end-to-end engineering projects, ensuring on-time delivery and quality compliance
  • Improved production workflow efficiency by ~10-12% through process optimization initiatives
  • Maintained accurate BOM and technical documentation, reducing planning errors by ~15%
  • Utilized SAP for production planning, scheduling, and material tracking
  • Coordinated with cross-functional teams to resolve engineering and production issues

Graduate Apprentice Trainee - Utility Department

JK Tyre & Industries Ltd.
04.2022 - 04.2023
  • Supported operation and maintenance of utility systems (compressed air, HVAC, water systems)
  • Assisted in preventive maintenance, reducing minor equipment issues and improving system reliability
  • Monitored system parameters and contributed to ~5-8% efficiency improvement in utility operations
  • Participated in safety inspections and maintenance programs

Education

B.Tech - Mechanical Engineering

Rajasthan Technical University
Kota

Skills

  • Asset Optimization & Reliability Engineering
  • MTBF / MTTR Analysis & Improvement
  • Root Cause Analysis (RCA)
  • Preventive Maintenance Planning
  • Equipment Performance Monitoring
  • Continuous Improvement
  • SAP PM/MM
  • Data Analysis (Excel)
  • SAP (PM/MM)
  • Microsoft Excel (Advanced Reporting)

Timeline

Engineer - Asset Optimization

Vaaman Engineers India Limited
01.2026 - Current

Project Engineer

Tempsens Instruments India Limited
02.2024 - 12.2025

Graduate Apprentice Trainee - Utility Department

JK Tyre & Industries Ltd.
04.2022 - 04.2023

B.Tech - Mechanical Engineering

Rajasthan Technical University
SAGAR GADRI