Summary
Overview
Work History
Education
Skills
Projects /Standouts
Personal Information
Training
Disclaimer
Languages
Timeline
Generic
Saikat Banerjee

Saikat Banerjee

Bhadreswar

Summary

Experienced Mechanical Engineer with over 5 years in the manufacturing sector, skilled in maintenance operations and efficiency optimization. Proven track record in enhancing production processes and implementing cost-saving measures. Adept in leading teams towards manufacturing excellence while ensuring safety and quality standards. Eager to apply maintenance expertise and leadership skills in a challenging new role.

Overview

6
6
years of professional experience

Work History

DEPUTY OFFICER(MAINTENANCE)

ITC LIMITED (PSPD DIVISION)
07.2024 - Current

MATERIALS EXECUTIVE

ASIAN PAINTS LIMITED
12.2018 - 07.2023

Education

Diploma - Mechanical Engineering

RAMAKRISHNA MISSION SHILPAMANDIRA, BELUR MATH
12.2018

TELINIPARA BHADRESWAR HIGH SCHOOL
12.2014

Skills

  • SAP EWM
  • SAP ERP
  • Truck Management System
  • Procurement of spares & consumables
  • Root Cause Analysis
  • Cost Estimation
  • Materials Handling
  • Team Work
  • Vendor Relationship Management
  • Preventive Maintenance
  • Continuous Improvement
  • Pneumatic & Hydraulic Systems
  • Scheduling
  • Equipment Troubleshooting
  • Hazardous Materials Handling
  • Scheduling shutdown Maintenance
  • TPM
  • IOT
  • DMAIC Project
  • CAPEX, OPEX
  • EHS , PM Pillar
  • Leadership
  • Project Management
  • Lean Manufacturing

Projects /Standouts

  • Implemented turbo vibrators in airside, increasing bulk material conveying rate from 4T/HR to 7.5T/HR . Boosted material conveying rate by 87.5% by enhancing efficiency.
  • Identified and resolved choking rms, saving ~4 lakhs annually by optimizing conveying phases.
  • SPC improvement through logic modification & installation of presence sensor of high power consuming de-dust collectors. (unit consumption/day reduced from ~450units to ~115units)
  • DATA FILE adjustment to improve conveying rate, SPC & reduction of breakdown due to line choking. (Initial 18 unit/ton to 10units/ton)
  • Highest breakdown of RMH department due to membrane damage solved by implementing low permeability membrane of 350mm of water column & high tensile bolts. Earlier MTBF was- (50-60) days & current MTBF is (300-320)days
  • Worked on Duiron material breakdown project. With modifications in logic & field breakdown hrs reduced from 55hrs to zero.
  • Worked on waste powder blitz for reduction of NHZ waste & reduce loss & waste. LCR implemented where system works on PDIT value of reverse jet filters which gives engineering control over leakages & spillages. waste powder rm reduced from 14T/month to 900kgs/month.
  • BSM fittings of bellows with higher elasticity installed.
  • Capex on single pressure vessel conveying taken & under implementation.
  • Reduction in bearing life defect by changing lubricant grease. (saving of ~ 4lakhs/year)
  • Led team in EHS & PM methodology, fostering a safer workplace and reducing incidents" to highlight leadership and impact on safety culture.
  • Kaizen on design modification through MOC,JIRA,LCR

Personal Information

  • Nationality: Indian
  • Marital Status: Single

Training

  • Undergone training on TRACC workshop
  • Undergone training on different problem-solving tools
  • Training on Asset care
  • PSM and firefighting training
  • Sight machine & data analytics

Disclaimer

I hereby declare that all the data and information provided above are true and correct to the best of my knowledge and I hold responsible myself for any irregularities if found.

Languages

Bengali
First Language
English
Proficient (C2)
C2
Telugu
Intermediate (B1)
B1
Hindi
Intermediate (B1)
B1

Timeline

DEPUTY OFFICER(MAINTENANCE)

ITC LIMITED (PSPD DIVISION)
07.2024 - Current

MATERIALS EXECUTIVE

ASIAN PAINTS LIMITED
12.2018 - 07.2023

Diploma - Mechanical Engineering

RAMAKRISHNA MISSION SHILPAMANDIRA, BELUR MATH

TELINIPARA BHADRESWAR HIGH SCHOOL
Saikat Banerjee