Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Sandeep Gupta

Sandeep Gupta

Pre Sales Product And Services Manager
Noida West

Summary

Aspiring Telecommunications Professional Aspiring To Work In The Telecommunications Sector, With A Growing Organization That Offers A Challenging Environment Where I Can Carve A Niche For Myself And Effectively Deliver Towards Contributing To The Organization’s Target & Aspirations.

Overview

16
16
years of professional experience
4
4
years of post-secondary education

Work History

NPO Product Manager & Smart Capex Analyst

Nokia
Noida, Uttar Pradesh
02.2018 - Current

• Smart Capex Analysis to identify future capacity expansions (band additions, sectorisation, 5G deployment, new site or small cells) based on the highest traffic capturing and/or ROI potential.

  • Working and provide the solution to improve business case for extending 4G & 5G Roll out and upgradation.
  • Analysis to provide the Growth factor on network level or cell/sector level.
  • Smart Capex working to identify the unserved traffic.
  • Preparation of Costing for different Scopes of all NPO portfolios (5G Network design/planning, optimization, SON, Modernization, Layer addition, Swap etc)
  • Preparation of solution for Open RAN & Cloud RAN,2G/3G/LTE/5G
  • Good understanding of AZURE,KUBERNETES,DOCKER,Data center dimensioning used in Cloud RAN using X-RAN Tool
  • Understanding of all configuration and design for LTE & 5G Upgradation and give solution to the customer
  • Preparation of SOW, SOR, SSD,SOC, CBL and other supporting documents to provide best solution to the customer
  • Selling Upsell as a service to the customer for more business to the Nokia
  • Knowledge of O-RAN, V-RAN portfolio as per market and operators need
  • Sync up with Delivery team (Project Manager, Planning resources, optimization resources, Post processing Resources) for smooth deliver after winning the case (Gate 6)
  • Knowledge of X-SU tool to make CBL with zero errors
  • Project Title : Modernization of Nokia Flexi Radio to AirScale for Advance LTE and 5G Supportable network of BT UK operator

Network Design and Optimization

Nokia Solutions & Networks Pvt Ltd
Noida, Uttar Pradesh
09.2017 - 01.2018
  • Project Title : Modernization of Nokia Flexi Radio to AirScale for Advance LTE and 5G Supportable network of BT UK
  • Preparation of Pre-Nomination & Final Nomination based on soft comments from customer.
  • Understanding of all configuration and design for LTE & 5G Upgradation and give solution to the customer
  • Prediction plots of all pre and post technologies to check with their stats.
  • Preparing the design of the sites in Nemesis tool.
  • Preparing RDS for final approval.

Radio Network Optimization

Nokia Networks
Noida, Uttar Pradesh
12.2014 - 03.2017
  • Description: Leading Zambia Ericsson area Globally and responsible for all major and minor activities related to Optimization/Capacity planning/AFP Planning/Customer Meeting (On site) etc
  • Radio Access Network Optimization Detail
  • RAN Performance Monitoring and Performance Problems Troubleshooting
  • Day to Day activities including fetching the report, KPIs Degradation reason and RCA, Worst cells analysis, post KPIs after raising CR, BSC and MSC Health checkup etc
  • NQI Improvement and degradation reason are the focus area of Customer, All KPIs must meet all the thresholds
  • Features trial to improve KPIs and NQI.

Radio Optimization Engineer

Ericsson Global India Ltd
Noida, Uttar Pradesh
11.2013 - 12.2014
  • Project:-Airtel Bharti (Africa–Nigeria) Telecommunication (GSM)
  • Discription:-KPI And Whole Network Optimization Of 7 BSC and RNC Of Abuja
  • Drive test Log files analysis for RSSA Account.
  • Access Network Performance Problems – Improve Cell and User Throughput, Retainability, Accessibility, Mobility (Intra and Inter Frequency, IRAT), Congestion, Channel Reconfiguration, Interference, End-User Service Quality, Resource Usage Efficiency, Traffic Balancing and Strategy.
  • Daily Analysis of NBH & BBH KPI Cells. Drop Statistics, Neighboring List Optimization, Their Reasons and Take Necessary Action.
  • Daily Monitoring of OMCR Reports U To Analyze the Radio Network Performance to Verify the Radio Utilization, Blocking (Tch/Sdcch), Assign Failures Etc. & Take Corrective Steps to Achieve the Optimum KPI.
  • Analysis Of Radio Utilization to Identify Blocking, And Its Minimization by Parameter Changes, Adding New Carrier (TRX) To the Cell, Installing New Sites After Locating Hot Spots, Implementing Dynamic Half Rate and Dual Band (Common BCCH) Features.
  • Frequency Planning, Neighbors Planning, Optimization of The Network.
  • Project 2:-Airtel Bharti (AFRICA UGANDA SWAP PROJECT)
  • Discription:- Swap project from Huawei (Warid Network) to Ericsson(Airtel)
  • Preparation plan for Swap sites from Huawei network to Ericsson.
  • Pre analysis for the cells having poor performance and taken action plan and KPIs adjustment to improve Network (KPIs) after swap.
  • Responsible Pre and Post cluster optimization and to take sign off from customer.
  • Involvement in Customer meeting for Go No Go for cluster cut over.
  • Access Network Performance Problems – Improve Retain ability, Accessibility, Congestion, Channel Reconfiguration, Interference, End-User Service Quality, Resource Usage Efficiency, Traffic Balancing and Strategy.
    -Support Cluster Acceptance Activities, Perform Analysis Based on Oss Statistics, Propose Optimization Actions and Troubleshoot Problematic Areas

Radio Optimization Engineer

Ericsson India Ltd.(ARP) from Apara Consultancy
Dehradun, Uttarakhand
05.2010 - 05.2012

Project:-Airtel Bharti Telecommunication(3g And 2g)

Discription:-KPI And Whole Network Optimization Of 7 Bsc And RNC Of Uttrakhand(2G And 3G)

  • Access Network Performance Problems – Improve Cell And User Throughput, Retainability, Accessibility, Mobility (Intra And Inter Frequency, IRAT), Congestion, Channel Reconfiguration, Interference, End-User Service Quality, Resource Usage Efficiency, Traffic Balancing And Strategy.
  • Daily Analysis Of NBH & BBH KPI Cells . Drop Statistics, Neighboring List Optimization, Their Reasons And Take Necessary Action.
  • Daily Monitoring Of OMCR Reports U To Analyze The Radio Network Performance To Verify The Radio Utilization, Blocking (Tch/Sdcch), Assign Failures Etc. & Take Corrective Steps To Achieve The Optimum KPI.
  • Analysis Of Radio Utilization To Identify Blocking, And Its Minimization By Parameter Changes, Adding New Carrier (TRX) To The Cell, Installing New Sites After Locating Hot Spots, Implementing Dynamic Half Rate And Dual Band (Common BCCH) Features.
  • Customer Complaints ,events Handling & VVIP routes optimization expertise.

Radio Optimization Engineer

Mobile Comm India Pvt Ltd
Channai, Tamilnadu
03.2009 - 04.2010

Project:-Unitech Siemens Project, Chennai

Discription:-End To End Project(Drive Test, Optimization, KPI)

  • Direct Co-Ordination With The Customers.
  • Leading A Team Of Engineers For In-Depth Analysis Of Different Reports For Hard As Well As Soft Optimization Of Sites.
  • Verification Of Network Performance, Detection Of Any Interference Present Due To Low C/I Or C/A And To Check The Speech Quality In The Network Through The Drive Test Plots.
  • Frequency Planning, Neighbors Planning, Optimization Of The Network.
  • Analysis Of Radio Utilization To Identify Blocking, And Its Minimization By Parameter Changes, Adding New Carrier (Trx) To The Cell, Installing New Sites After Locating Hot Spots, Implementing Dynamic Half Rate And Dual Band (Common BCCH Features.
  • Proposal For New Parameter Changes In Network For Improving The Performance.

RF Drive Test Engineer

N.R. Switch And Radio System Pvt. Ltd
Mumbai, Maharatra
10.2008 - 03.2009

Project:- Bharti Airtel

Discription:-This Project Is Undertaken To Maintain & Improve The KPI Of Existing Network Of Bharti Airtel By Rf Drive Testing & Optimizing A Cell Site Of The Network.

  • Daily Analysis Of Nbh & Bbh KPI, Ioe Cells . Drop Statistics, Neighboring List Optimization, Their Reasons And Take Necessary Action.
  • Drive Test of the cluster and VVIP Routes for optimization of the KPIs.
  • Bsc Drive Test Log Files Identifying Poor Coverage And Quality Patches Through Drive Test And Making Action Plan To Resolve The Same.
  • Recomendation to add or delete the neighours to improve the HOSR.
  • Physical visit to improve the Swap, Antenna wrong dimentioing.

RF Drive Test Engineer

Toshniwal Enterprises Control Pvt. Ltd.
Gurgaon, Hariyana
03.2008 - 10.2008

Project:-Vodafone,Erricson ,New Delhi

Discription:-To Check The Effect Of Network After Bts Swap From Motorola To Erricson

  • Pre drive test of the poor performing sites to identify the problem.
  • Cluster drive test to improve the overall performance of the cluster.
  • SSV and Physical visit to check the swap.
  • Post Processing and report preparation for successful submission of the reports.
  • Customer complaints and identification of the solution.

Education

Bachelor of Science - Electronics & Instrumentation Engineering

Hindustan College of Science & Technology, Agra
03.2003 - 07.2007

Skills

Technical Tools usedundefined

Accomplishments

  • AFP Planning to improve Quality of the network, DCR, SD Drop rate once in 6 months
  • User level knowledge of OSS / NMS tools and report generated by Netcool and Remedy
  • Managing faults and work in crisis to resolve the faults
  • Access Network Performance Problems – Improve Cell and User Throughput, Retainability, Accessibility, Mobility (Intra and Inter Frequency, IRAT), Congestion, Channel Reconfiguration, Interference, End-User Service Quality, Resource Usage Efficiency, Traffic Balancing and Strategy
  • Support Cluster Acceptance Activities, Perform Analysis Based on Oss Statistics, Propose Optimization Actions and Troubleshoot Problematic Areas
  • Daily Analysis of NBH & BBH KPI Cells
  • Drop Statistics, Neighboring List Optimization, Their Reasons and Take Necessary Action
  • Daily Monitoring of OMCR Reports U To Analyze the Radio Network Performance to Verify the Radio Utilization, Blocking (Tch/Sdcch), Assign Failures Etc
  • Take Corrective Steps to Achieve the Optimum KPI
  • Analysis of Radio Utilization to Identify Blocking, And Its Minimization by Parameter Changes, Adding New Carrier (TRX) To the Cell, Installing New Sites After Locating Hot Spots, Implementing Dynamic Half Rate and Dual Band (Common BCCH) Features
  • Frequency Planning, Neighbors Planning, Optimization of The Network
  • Previous Employer: 1 Ericsson Global India Ltd, As A Network Engineer (5th Nov’13 To 16th Dec’14) Noida (India)
  • Name Of the Organization: Airtel Bharti (Africa–Nigeria) Telecommunication (GSM) Project Title : KPI And Whole Network Optimization Of 7 BSC and RNC Of Abuja Duration : Aug’14 To 16th Dec’14 date
  • Network Used : Ericsson System
  • Description: This Project Is Established Project Where KPI (2G And 3G) Meet and All Optimization Is Required to Maintain the Quality and Improve the Quality./2G Radio Access Network Consultant
  • 3G RAN Performance Monitoring and Performance Problems Troubleshooting
  • Drive test Log files analysis for RSSA Account
  • User level knowledge of OSS / NMS tools and report generated by Netcool and Remedy
  • Managing faults and work in crisis to resolve the faults
  • Access Network Performance Problems – Improve Cell and User Throughput, Retainability, Accessibility, Mobility (Intra and Inter Frequency, IRAT), Congestion, Channel Reconfiguration, Interference, End-User Service Quality, Resource Usage Efficiency, Traffic Balancing and Strategy
  • Support Cluster Acceptance Activities, Perform Analysis Based on Oss Statistics, Propose Optimization Actions and Troubleshoot Problematic Areas
  • Daily Analysis of NBH & BBH KPI Cells
  • Drop Statistics, Neighboring List Optimization, Their Reasons and Take Necessary Action
  • Daily Monitoring of OMCR Reports U To Analyze the Radio Network Performance to Verify the Radio Utilization, Blocking (Tch/Sdcch), Assign Failures Etc
  • Take Corrective Steps to Achieve the Optimum KPI
  • Analysis Of Radio Utilization to Identify Blocking, And Its Minimization by Parameter Changes, Adding New Carrier (TRX) To the Cell, Installing New Sites After Locating Hot Spots, Implementing Dynamic Half Rate and Dual Band (Common BCCH) Features
  • Frequency Planning, Neighbors Planning, Optimization of The Network
  • A
  • Name of The Organization: Airtel Bharti (AFRICA UGANDA SWAP PROJECT) Telecommunication (GSM)
  • Project Title : Swap project from Huawei (Warid Network) to Ericsson(Airtel)
  • Duration : May’14 To July’14 Network Used : Ericsson System
  • Description: This Project Is Established Project Where KPI (2G) Meet and All Optimization Is Required to Maintain the Quality and Improve the Quality after Swap done from Huwei to Ericsson
  • GSM Radio Access Network Engineer
  • Preparation plan for Swap sites from Huawei network to Ericsson
  • Pre analysis for the cells having poor performance and taken action plan and KPIs adjustment to improve Network (KPIs) after swap
  • Managing faults and work in crisis to resolve the faults
  • Responsible for meeting all G2 criterion for swap sites
  • Responsible Pre and Post cluster optimization and to take sign off from customer
  • Involvement in Customer meeting for Go No Go for cluster cut over
  • Representation to show Swap and cutover confidence for more improvement after swap
  • Access Network Performance Problems – Improve Retain ability, Accessibility, Congestion, Channel Reconfiguration, Interference, End-User Service Quality, Resource Usage Efficiency, Traffic Balancing and Strategy
  • Support Cluster Acceptance Activities, Perform Analysis Based on Oss Statistics, Propose Optimization Actions and Troubleshoot Problematic Areas
  • C
  • Name of The Organization: Airtel Bharti (Africa–Nigeria) Telecommunication (GSM) Project Title : KPI And Whole Network Optimization Of 7 BSC and RNC Of Abuja Duration : Nov’13 To May’14
  • Network Used : Ericsson System
  • Description: This Project Is Established Project Where KPI (2G And 3G) Meet and All Optimization Is Required to Maintain the Quality and Improve the Quality./2G Radio Access Network Consultant, 2 Ericsson India Ltd,As A Network Consultant ( Arp) With Tics Pvt Ltd(June 2012 To Oct 2013) And Apara Consultancy(May 2010 To May 2012) Dehradun
  • A.Name Of The Organization: Airtel Bharti Telecommunication(3g And 2g) Project Title : KPI And Whole Network Optimization Of 7 Bsc And RNC Of Uttrakhand(2G And 3G) Duration : May’10 To Oct’13 Network Used : Ericsson System
  • Description:This Project Is Established Project Where KPI(2G And 3G) Meet And All Optimization Is Required To Maintain The Quality And Improve the Quality./2G Radio Access Network Consultant, Proposal For New Parameter Changes In Network For Improving The Performance
  • Name Of The Organization : Reliance Gsm(Huawei) ,Mumbai
  • Project Title : Maintenance Of Existing Network And Optimization Of Reliance Gsm,Mumbai
  • Network Used : Reliance Gsm, Mumbai
  • Description : This Project Is Undertaken To Check Performance Of The New Cell Site & Optimizing The Cluster By Drive Test & Optimisation N Making Ppt & Reports To The Customer By Using Probe 1.53 And Assistant 1.53 Tool
  • Previous Employer: 4 Company : N.R
  • Switch And Radio System Pvt
  • Ltd.,Gurgaon Duration : (Oct’ 08 To Mar’ 09)
  • Key Projects Handled
  • Name Of The Organization : Aircel ,Nokia Siemens Network (Nsn)
  • Project Title : Maintenance & Improvement Of Existing Network Of Aircel
  • Network Used : Aircel, Delhi/Ncr
  • Description : This Project Is Undertaken To Maintain & Improve The Existing Network Of Aircel By Rf Drive Testing & Physically Optimizing A Cell Site Of The Network
  • Name Of The Organization : Nokia Siemens Network (Nsn)
  • Project Title : To Improve The KPI Of The Existing Sites Of Bharti Airtel .Mumbai
  • Network Used : Airtel, Mumbai
  • Description : This Project Is Undertaken To Maintain & Improve The KPI Of Existing Network Of Bharti Airtel By Rf Drive Testing & Optimizing A Cell Site Of The Network.

Timeline

NPO Product Manager & Smart Capex Analyst - Nokia
02.2018 - Current
Network Design and Optimization - Nokia Solutions & Networks Pvt Ltd
09.2017 - 01.2018
Radio Network Optimization - Nokia Networks
12.2014 - 03.2017
Radio Optimization Engineer - Ericsson Global India Ltd
11.2013 - 12.2014
Radio Optimization Engineer - Ericsson India Ltd.(ARP) from Apara Consultancy
05.2010 - 05.2012
Radio Optimization Engineer - Mobile Comm India Pvt Ltd
03.2009 - 04.2010
RF Drive Test Engineer - N.R. Switch And Radio System Pvt. Ltd
10.2008 - 03.2009
RF Drive Test Engineer - Toshniwal Enterprises Control Pvt. Ltd.
03.2008 - 10.2008
Hindustan College of Science & Technology - Bachelor of Science, Electronics & Instrumentation Engineering
03.2003 - 07.2007
Sandeep GuptaPre Sales Product And Services Manager