A vigilant, meticulous, and competent individual with over 10 years of captivating experience in the area of Fabrication & Erection (Steel Superstructures), Quality Assurance & Control, Construction Management, Project Engineering, and Documentation in Heavy Steel Fabrication/Railway Steel Bridges/Erection and Launching. Seeking to pursue a career in the upper echelons of an esteemed organization, that calls for extremely high levels of leadership qualities, technical abilities and regulatory knowledge and expertise, with the goal of leading Construction/Railway infrastructure/Fabrication Plant/Metro project functions to contribute to the success of the organization.
Title: Asst. Manager (Steel Bridges/Elevated Bridges) | Quality Assurance & Control | Fabrication and Erection | Project Engineering
L&T- High Speed Rail Project-
Design and Construction of Civil and Building Works including Testing and Commissioning on Design Build Lump Sum Price Basis for Double Line High Speed Railway involving Viaducts & Bridges (excluding fabrication and transportation of steel truss girder components), Maintenance Depot, Tunnels, Earth Structures and Stations (Thane, Virar and Boisar), between Shilphata in the State of Maharashtra and Zaroli at Maharashtra-Gujarat border from MAHSR Km 21.150 to MAHSR Km 156.600 [excluding Thane Depot] for the Project for Construction of Mumbai-Ahmedabad High Speed Rail
MRIDC-(HO Mumbai)-
Construction & Design of Road Over Bridges (ROBs), Road Under Bridges (RUBs) and Foot over Bridges (FOBs) all over the Maharashtra State, Central Railway, Western Railway, South Central Railway, South East Central Railway, Asst.Manager (Steel Bridges)- HQ Mumbai, 2000 cr. Designation Construction of ROBs, across 69 Railway level crossings all over Maharashtra. Fabrication of RDSO Standard Girders, Semi Through Girders, Bow String Girders & Open Web Girders Construction.
CHENAB BRIDGE PROJECT UNDERTAKING ( World Highest Railway Bridge ) - J&K
Design of World Highest and Special Railway Bridge Across river Chenab under USBRL Railway Project., Konkan Railway Corporation Limited. Northern Railways under the ministry of Indian Railways, Engineer (Fabrication, Erection & Quality Control & Quality Assurance), 2200 cr, Construction of the World's Highest Railway Bridge 1.315 KM Across river Chenab, Height of the Bridge 854.517 m from sea level & 362.122 m from River Bed. Total Steel Fabrication 25000 MT including all piers, arch, Trestles & viaduct.
MG Setu over River Ganga, MoRTH-Ministry of road transport and Highway Govt. Of India Enterprise-
Engineer (Quality Control and Quality Assurance), 1742 cr, Replacement of Superstructure of existing 5.575 Km long, 4 Lane Road Bridge over Ganga River on NH-19 From Km 2.72 to Km 218.295 through EPC mode in Patna (Bihar)