Summary
Overview
Work History
Education
Certification
Technical Skills
Software Skills
Internship
Languages
Hobbies and Interests
Personal Information
Disclaimer
Timeline
Generic
Santhosh Yedla

Santhosh Yedla

Summary

Experienced IRSE Licensed Signalling Design Engineer with 8+ years of expertise in UK railways and PTC Wayside designs. Strong understanding of Signalling principles, Interlocking concepts, standards and practices. Hands-on experience in PTC Wayside system designs, Relay Interlocking, and Electronic Interlocking (equivalent to Ansaldo's Microlok and Alstom's Electrologix) interlocking products. Involved in multiple projects from initial detailed design to completion of Final Records.

Overview

9
9
years of professional experience
1
1
Certification

Work History

Lead Engineer, Signalling

Wabtec India Industrial Pvt. Ltd.
04.2022 - Current

Bax OMSL Works (173818):

Scope of work:

Main scope of this project is to provide Overlay MSL at Bax crossing. And the alteration work at location VIR 47/35 involve only extension of 110v supply to VaMoS case and provision of an Earth Leakage Detector.

The design deliverables covered under the scope are, Scheme Sketch, supporting calculations, Axle counter schematics and alterations in existing location VIR 47/35.

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Source Records Request
  • Produced Scheme Sketch
  • Produced LOC case Design, RASS Case, Panel Diagram
  • Produced SIP Calculations, Voltage Drop Calculations & Power Load Calculations
  • CRE/DRN/MSRP Comments updates
  • Tester Pink Comments updates

Also involved in the delivery of NR Acceptance copies, AFC copies, Closure Lists, Commissioning copies, Maintenance Copies & Final records return documentation.

EBI200 Track Circuit Conversion (161023):

Scope of work:

Main objective of this project is to replace the existing Reed track circuits and AC 50Hz Vane track circuits with EBI200 track circuits.

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Produced Manufacturing Cases (EC35 & EC48 new cases)
  • Updated to Correlation Copies
  • Produced Location EC52 (Single Stage)
  • Produced Location EC45 (1-5 stages)
  • Produced Location EC35 & EC48 (All Stages)
  • Produced Stage ROC's or temporary stage records

Wessex Signal Head Conversion (165468):

Scope of work:

Main objective of this project is conversion to LED Dorman type signal head from Filament Lamp lit and Fibre Optic Repeaters on the Wessex area.

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Produced LOC EH218 & EH219 on securities copies
  • Produced Record office Copies
  • Verification of Locations (under mentorship of a Verifier)
  • Tester Pink Comments updates

Also involved in the delivery of NR Acceptance copies, AFC copies, Closure Lists, Commissioning copies, Maintenance Copies & Final records return documentation.

Wessex TCAIDS Mark II 20/21 (169065):

Scope of work:

Main objective of this project is to produce signalling designs for TCAID Mk2 units and TCAID-HVI units for the DC track circuits and HVI track circuits on the Wessex route which are not fitted with TCAIDs earlier and are prone to wrong side failures due to railhead contamination.

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Updated the Plans to the tester pink copies & site survey details
  • Prepared TGIC Pack for records return, QF915 Form & Maintenance Copies

Duwdse 19/20 TI21 Digital RCM (167420):

Scope of work:

Main objective of this project is upgrade Ti21 Analogue to Digital and the Provision of RCM final records..

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Updated the locations to the tester pink copies, Records Return & TGIC Pack

Romsey Area Life Extension (164067):

Scope of work:

Main objective of this project is to replace the line side assets which was re-signalled approximately 35 years ago in Romsey area.

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Source Records Request
  • Prepared Correlation Packs
  • Produced SDS & SDS addendum
  • Produced Power load calculations
  • Produced Battery supporting calculations
  • Produced Correlation Report
  • Produced Scheme Sketches
  • Updated the locations to the correlation comments
  • Produced Location Renewals designs, Battery Renewals design & Earthing arrangement designs
  • Produced stage locations
  • Updated the locations to the tester pink copies

Also involved in the delivery of NR Acceptance copies, AFC copies, Closure Lists, Commissioning copies, Maintenance Copies & Final records return documentation.

Dibbleys Integrated MSL Works (170777):

Scope of work:

Scope of this project is to install an Integrated OMSL system at Dibbley crossing to improve the safety.

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Source Records Request
  • Produced Scheme Sketch (under mentorship)
  • Produced Control tables (under mentorship)
  • Produced Power load calculations
  • Produced Voltage Drop Calculations
  • Produced Cable Core Plans & Cable Schematics
  • Produced Flex Case CT5B (interface) (under mentorship)
  • Produced Location designs alterations(CT5 & CT7)
  • Produced Panel Diagrams
  • Produced MOD designs
  • CRE/DRN/MSRP Comments updates
  • Tester Pink Comments updates

Also involved in the delivery of NR Acceptance copies, AFC copies, Closure Lists, Commissioning copies, Maintenance Copies & Final records return documentation.

Chiltern ATP TPWS (161667):

Scope of work:

The main objective of this project is provision of new TPWS equipment for the non-fitted signals, repositioning some existing TPWS fitments and provision of additional TPWS equipment for already fitted signals in Stage A & recovery of existing ATP in stage B.

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Produced Correlation Report
  • Produced Power load calculations
  • Produced GRIP5 LAP
  • Produced Stage A & Stage B designs
  • Produced Cable core plans & Cable schematics
  • Produced Stage A & Stage B Location Renewals designs
  • Produced MOD designs
  • Updated the Stage A designs to the tester pink copies
  • Combined Stage A & Stage B Designs
  • Produced Final Records by updating the testing copies comments

Also involved in the delivery of NR Acceptance copies, AFC copies, Closure Lists, Commissioning copies, Maintenance Copies & Final records return documentation.

Goole Swing Bridge (162933):

Scope of work:

The overall aim of the project is to renew the operating plant on Goole Swing Bridge with a modern, reliable equivalent.

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Source Records Request
  • Prepared Correlation Packs
  • Produced Scheme Sketch (Under mentorship)
  • Produced Location Area Plan extract
  • Produced Control tables (Under mentorship)
  • Produced Correlations
  • Updated the locations to the correlation comments
  • Produced Location Renewals designs
  • Produced Relay Room Design (Under mentorship)
  • Produced SDS addendum
  • Produced MOD designs
  • CRE/DRN/MSRP Comments updates
  • Produced Final Records by updating the testing copies comments

Also involved in the delivery of NR Acceptance copies, AFC copies, Closure Lists, Commissioning copies, Maintenance Copies & Final records return documentation.

Liverpool Street FED Design (151440):

Scope of work:

Main scope of this project is to be recovered and renewed L11R banner signal line side cables, Platform 2 & 3 off indicators line side cables, 20 TRS and RA plungers & line side cables, 21 TRS and RA plungers & line side cables.

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Updated the locations to the tester pink copies
  • Produced Location case renewal designs & prepared AFC copies

Rose Hill Location Move (168928):

Scope of work:

Main scope of this project is to recover the existing location 29/37 along with the base and provide a new location on a staging in the same position due to poor grounding connections.

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Produced SDS
  • Produced LAP
  • Produced Locations case renewals designs (Manufacturing & Commissioning)
  • Produced through circuits
  • Produced 650V power schematics
  • CRE/DRN comments updates
  • Updated to tester pink comments

Also involved in the delivery of NR Acceptance copies, AFC copies, Closure Lists, Commissioning copies, Maintenance Copies & Final records return documentation.

Tonford Vamos MSL Signalling Design (173818):

Scope of work:

The main scope of this project is to install a VaMoS OMSL system at the Tonford crossing to remove the TSR and improve user safety.

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Produced Scheme Sketch
  • Produced Power Load & SIP Calculations
  • Produced Location SD2 design under ODA agreement
  • CRE/DRN/MSRP comments updates
  • Updated to Tester pink comments

Also involved in the delivery of NR Acceptance copies, AFC copies, Closure Lists, Commissioning copies, Maintenance Copies & Final records return documentation.

Yeovil Pen Mill Life Extension (168321):

Scope of work:

Main scope of this project is to Production & integration of GRIP 4/5 designs/documentation for the renewal and relocation of the obsolete equipment within Yeovil Pen Mill Signal Box into a suitably sized relocatable equipment building (REB base and cable management system from the signal box is already in situ) & GRIP 4/5 designs/documentation for the renewal of existing lead acid batteries with modern equivalents.

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Source Records Request
  • Prepared Correlation Specification
  • Prepared Correlation Packs
  • Produced New Case Designs
  • Produced Alteration Location Case Designs

Senior Engineer, Signalling

Wabtec India Industrial Pvt. Ltd.
10.2021 - 03.2022

Chiltern ATP TPWS (161667):

Scope of work:

Main objective of this project is provision of new TPWS equipment for the non-fitted signals, repositioning some existing TPWS fitments and provision of additional TPWS equipment for already fitted signals in Stage A & recovery of existing ATP in stage B.

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Produced Correlation Report
  • Produced Power load calculations
  • Produced GRIP5 LAP
  • Produced Stage A & Stage B designs
  • Produced Cable core plans & Cable schematics
  • Produced Stage A & Stage B Location Renewals designs

Also involved in the delivery of NR Acceptance Copies, AFC Copies, Closure Lists & Commissioning Copies.

Aster Track circuit Conversion (167295):

Scope of work:

Main objective of this project is to convert obsolete U type aster track circuits to MVDC track circuits.

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Updated the Locations, LAP's & Bonding Plans to the Tester pink copies, MOD & Test logs
  • Prepared TGIC Pack for records return QF915 Form
  • Prepared Maintenance Copies

Engineer, Signalling

Wabtec India Industrial Pvt. Ltd.
08.2020 - 09.2021

Chiltern ATP TPWS (161667):

Scope of work:

Main objective of this project is provision of new TPWS equipment for the non-fitted signals, repositioning some existing TPWS fitments and provision of additional TPWS equipment for already fitted signals in Stage A & recovery of existing ATP in stage B.

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Produced Correlation Report
  • Produced Power load calculations
  • Produced GRIP5 LAP
  • Produced Stage A designs
  • Produced Cable core plans & Cable schematics

Class II FSP Remedial Works (162113):

Scope of work:

Main objective of this project is to upgrade the existing 650V power equipment to Class II switch gear & transformers or T/Js to reduce the risk of electric shock without changing the transformers output parameters.

Role: Designer , I have been involved with multiple tasks under this project as listed below:

  • Produced Form B's
  • Produced Location Power renewals designs

CAMBRIDGE STATION (155752):

Scope of work:

The main objective of this project is to extend platform by 40m towards country end by recovery of existing CD/RA indicator & 10 stop marker board and provision of new LED type CD/RA indicator & 10 stop board marker.

Role: Designer , I have been involved with multiple tasks under this project as listed below:

  • Produced LOC 89/92 design (under ODA agreement)
  • Produced AFC, Closure Lists, Commissioning copies

HEADBOLT GRIP 4 Works:

Scope of work:

This project will provide a new integrated transport interchange at headbolt lane. It is proposes an extension of Merseyrail approximately 1200m from Kirkby station to a new station at Headbolt lane with a corresponding shift of ELR:WKL2 terminus from kirkby to headbolt lane.

Role: Designer , I have been involved with multiple tasks under this project as listed below:

  • Produced Bonding Plan Draft design
  • Produced IBJ Siting forms
  • Prepared TGIC Pack & QF915 for records return

LAP Production support & Scheme Plan production Support for the Adding new plat forms at station

TSR/ESR Design:

Scope of work:

Main scope of this project is to provide ESR/TSR designs at Inverkeithing Station and Cross Water of Luce area.

Role: Designer , I have been involved below:

  • Produced TSR design at Inverkeithing Station area
  • Produced ESR Design at UB 163/068 Cross Water of Luce (18M 630Y to 18M to 730Y)

Aster Track circuit Conversion (167295):

Scope of work:

The Main objective of this project is to convert obsolete U type aster track circuits to MVDC track circuits.

Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:

  • Produced Stage LAPʼs & Stage Bonding Plans
  • Produced Location Alteration designs
  • Produced FED Designs
  • Produced Through Circuits
  • Produced MOD designs
  • Prepared NR Acceptance, Closure Lists & Commissioning copies

Engineer, Signalling

AM Rail Group (Formally Wabtec India Industrial)
04.2019 - 07.2020

Train Management Dispatching System:

  • TMDS is a fully integrated bilingual train control solution for all methods of operation including CTC, TWC, DTC & PTC
  • Worked on Many Rail Roads like ARRC, Metra, NMRX, Denver, NMRL, KCSP,FXE, FECR, AAF, Metro Link, BRC, KCT
  • Tested the customer raised defects or issues in TMDS related applications like CAD, Code Server, Communication Server, Control Server, BOS server, TMC, Web App, View Client, Track Editor
  • Performed Integration testing, Regression testing & Smoke testing
  • Validate the defects by using RMTrack, Redmine &Devops
  • Prepared Regression test suits, Test Cases & Test Status Reports
  • Preparing the environment Setup

Assistant Engineer, Signalling

AM Rail Group (Formally Wabtec India Industrial Pvt. Ltd)
02.2018 - 03.2019

Train Management Dispatching System:

As a Asst. Signalling Engineer, I have tested on Train Management dispatcher system applications like CAD, Code, Comm, Control, BOS, Field Simulator, View Client, Web APP & TMC in ARRC, Metro link, KCSP, NCTD, NICTD, FECR, AAF, FXE, MRL, KCT, BRC, Metra, Denver, NMRL, KCSM & NMRX Rail Roads

Assistant Engineer, Signalling

AM Rail Group (Formally Wabtec India Industrial)
06.2016 - 01.2018

East Putney ESTL Plain Lining Stage 2:

  • Produced correlation updates, Location design, Control Panel & Indication diagram

Princess Hwy LC:

  • Prepared FAdC axle counter related cell library in auto CAD for Princess Hwy Level Crossing

LNW Signalling Power Distribution Cable Renewals:

Produced correlation updates, stage designs, commissioning Copies & Modification designs which includes

  • Renewal of degraded and life expired 650V power distribution cables
  • Power distribution of 50V/110V/120V supplies to existing Signalling location cabinets from newly introduced 650V Functional Supply Points (FSPs) and produced FSP designs that is related to Signalling

Inverness Depot (Provision of Protected Staff Walkway):

  • Produced Master Record copies by updating the design to tester pink comments for the Inverness Depot (Provision of Protected Staff Walkway)

LNE Signalling Power Distribution Renewals:

  • I have updated source records to S&C Alliance works received under ODA agreement & Produced design alterations for Locations for renewal of existing degraded 650V equipment

ETCS PLAN B (TPWS):

  • Produced Master Record copies by updating the design to tester pink comments for the ETCS PLAN B (TPWS) project

Class II Power Upgrade Works:

  • Produced Locations and Form - B (E&P Document) which involves replacing existing Transformers, Link and Fuse boxes with new Class II FSP Switch gear units and Class II Transformers
  • Prepared Cell library

Education

Bachelor of Science - Computer Science

Andhra University
Visakhapatnam, India
10-2024

Diploma - Diploma in Electrical And Electronics Engineering

Govt. Polytechnic
Gannavaram, India
05-2016

Secondary Education -

Sudha Public School
Rajam, India
03.2013

Certification

IRSE Signalling Designer, 00080215

Signalling Sighting Committee Member

Technical Skills

UK Main Line Signalling

  • Detailed Design Activities
  • Scheme Plans, Location Area Plans, Bonding Plans, Panel Diagrams
  • Cable Core Plans, Cable schematics
  • Location/REB Designs (Signals, Points, AWS, TPWS, Power Supplies, SSI, FaDc Axle Counters, Track Circuits)
  • IBJ Siting Forms, Axle Counter Siting Forms
  • SDS, Correlation Spec., Designs Logs, Correlation Reports, Power Load Calculations, Voltage Drop Calculations, Battery Calculations

Train Management Dispatch System

  • PTC system
  • Verification & Validation Activities
  • Writing the System Requirements, Test Cases
  • PTC environment Simulation set up

Software Skills

  • Microstation V8i CAD
  • Alstom Plans Software
  • Auto CAD
  • Microsoft Project Programme
  • Microsoft Word/Excel
  • TMDS system Configuration
  • SQL Basics

Internship

I have successfully completed sandwich industry attachment internship training at 132/33KV Sub station Kanumolu, APTRANSCO with project title as Study of 132/33KV Sub-Station - Kanumolu. under A.E. supervision and guidance from 20-Nov-2015 to 17-May-2016.

Languages

Telugu
English

Hobbies and Interests

  • Reading Books
  • Watching Movies
  • Playing Cricket

Personal Information

  • Passport Number: W8096773
  • Date of Birth: 01/06/1998
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Single

Disclaimer

I, Santhosh Yedla hereby declare that the above details mentioned are true to the best of my knowledge and belief.

Timeline

Lead Engineer, Signalling

Wabtec India Industrial Pvt. Ltd.
04.2022 - Current

Senior Engineer, Signalling

Wabtec India Industrial Pvt. Ltd.
10.2021 - 03.2022

Engineer, Signalling

Wabtec India Industrial Pvt. Ltd.
08.2020 - 09.2021

Engineer, Signalling

AM Rail Group (Formally Wabtec India Industrial)
04.2019 - 07.2020

Assistant Engineer, Signalling

AM Rail Group (Formally Wabtec India Industrial Pvt. Ltd)
02.2018 - 03.2019

Assistant Engineer, Signalling

AM Rail Group (Formally Wabtec India Industrial)
06.2016 - 01.2018

Bachelor of Science - Computer Science

Andhra University

Diploma - Diploma in Electrical And Electronics Engineering

Govt. Polytechnic

Secondary Education -

Sudha Public School
Santhosh Yedla