Experienced IRSE Licensed Signalling Design Engineer with 8+ years of expertise in UK railways and PTC Wayside designs. Strong understanding of Signalling principles, Interlocking concepts, standards and practices. Hands-on experience in PTC Wayside system designs, Relay Interlocking, and Electronic Interlocking (equivalent to Ansaldo's Microlok and Alstom's Electrologix) interlocking products. Involved in multiple projects from initial detailed design to completion of Final Records.
Bax OMSL Works (173818):
Scope of work:
Main scope of this project is to provide Overlay MSL at Bax crossing. And the alteration work at location VIR 47/35 involve only extension of 110v supply to VaMoS case and provision of an Earth Leakage Detector.
The design deliverables covered under the scope are, Scheme Sketch, supporting calculations, Axle counter schematics and alterations in existing location VIR 47/35.
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Also involved in the delivery of NR Acceptance copies, AFC copies, Closure Lists, Commissioning copies, Maintenance Copies & Final records return documentation.
EBI200 Track Circuit Conversion (161023):
Scope of work:
Main objective of this project is to replace the existing Reed track circuits and AC 50Hz Vane track circuits with EBI200 track circuits.
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Wessex Signal Head Conversion (165468):
Scope of work:
Main objective of this project is conversion to LED Dorman type signal head from Filament Lamp lit and Fibre Optic Repeaters on the Wessex area.
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Also involved in the delivery of NR Acceptance copies, AFC copies, Closure Lists, Commissioning copies, Maintenance Copies & Final records return documentation.
Wessex TCAIDS Mark II 20/21 (169065):
Scope of work:
Main objective of this project is to produce signalling designs for TCAID Mk2 units and TCAID-HVI units for the DC track circuits and HVI track circuits on the Wessex route which are not fitted with TCAIDs earlier and are prone to wrong side failures due to railhead contamination.
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Duwdse 19/20 TI21 Digital RCM (167420):
Scope of work:
Main objective of this project is upgrade Ti21 Analogue to Digital and the Provision of RCM final records..
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Romsey Area Life Extension (164067):
Scope of work:
Main objective of this project is to replace the line side assets which was re-signalled approximately 35 years ago in Romsey area.
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Also involved in the delivery of NR Acceptance copies, AFC copies, Closure Lists, Commissioning copies, Maintenance Copies & Final records return documentation.
Dibbleys Integrated MSL Works (170777):
Scope of work:
Scope of this project is to install an Integrated OMSL system at Dibbley crossing to improve the safety.
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Also involved in the delivery of NR Acceptance copies, AFC copies, Closure Lists, Commissioning copies, Maintenance Copies & Final records return documentation.
Chiltern ATP TPWS (161667):
Scope of work:
The main objective of this project is provision of new TPWS equipment for the non-fitted signals, repositioning some existing TPWS fitments and provision of additional TPWS equipment for already fitted signals in Stage A & recovery of existing ATP in stage B.
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Also involved in the delivery of NR Acceptance copies, AFC copies, Closure Lists, Commissioning copies, Maintenance Copies & Final records return documentation.
Goole Swing Bridge (162933):
Scope of work:
The overall aim of the project is to renew the operating plant on Goole Swing Bridge with a modern, reliable equivalent.
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Also involved in the delivery of NR Acceptance copies, AFC copies, Closure Lists, Commissioning copies, Maintenance Copies & Final records return documentation.
Liverpool Street FED Design (151440):
Scope of work:
Main scope of this project is to be recovered and renewed L11R banner signal line side cables, Platform 2 & 3 off indicators line side cables, 20 TRS and RA plungers & line side cables, 21 TRS and RA plungers & line side cables.
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Rose Hill Location Move (168928):
Scope of work:
Main scope of this project is to recover the existing location 29/37 along with the base and provide a new location on a staging in the same position due to poor grounding connections.
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Also involved in the delivery of NR Acceptance copies, AFC copies, Closure Lists, Commissioning copies, Maintenance Copies & Final records return documentation.
Tonford Vamos MSL Signalling Design (173818):
Scope of work:
The main scope of this project is to install a VaMoS OMSL system at the Tonford crossing to remove the TSR and improve user safety.
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Also involved in the delivery of NR Acceptance copies, AFC copies, Closure Lists, Commissioning copies, Maintenance Copies & Final records return documentation.
Yeovil Pen Mill Life Extension (168321):
Scope of work:
Main scope of this project is to Production & integration of GRIP 4/5 designs/documentation for the renewal and relocation of the obsolete equipment within Yeovil Pen Mill Signal Box into a suitably sized relocatable equipment building (REB base and cable management system from the signal box is already in situ) & GRIP 4/5 designs/documentation for the renewal of existing lead acid batteries with modern equivalents.
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Chiltern ATP TPWS (161667):
Scope of work:
Main objective of this project is provision of new TPWS equipment for the non-fitted signals, repositioning some existing TPWS fitments and provision of additional TPWS equipment for already fitted signals in Stage A & recovery of existing ATP in stage B.
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Also involved in the delivery of NR Acceptance Copies, AFC Copies, Closure Lists & Commissioning Copies.
Aster Track circuit Conversion (167295):
Scope of work:
Main objective of this project is to convert obsolete U type aster track circuits to MVDC track circuits.
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Chiltern ATP TPWS (161667):
Scope of work:
Main objective of this project is provision of new TPWS equipment for the non-fitted signals, repositioning some existing TPWS fitments and provision of additional TPWS equipment for already fitted signals in Stage A & recovery of existing ATP in stage B.
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Class II FSP Remedial Works (162113):
Scope of work:
Main objective of this project is to upgrade the existing 650V power equipment to Class II switch gear & transformers or T/Js to reduce the risk of electric shock without changing the transformers output parameters.
Role: Designer , I have been involved with multiple tasks under this project as listed below:
CAMBRIDGE STATION (155752):
Scope of work:
The main objective of this project is to extend platform by 40m towards country end by recovery of existing CD/RA indicator & 10 stop marker board and provision of new LED type CD/RA indicator & 10 stop board marker.
Role: Designer , I have been involved with multiple tasks under this project as listed below:
HEADBOLT GRIP 4 Works:
Scope of work:
This project will provide a new integrated transport interchange at headbolt lane. It is proposes an extension of Merseyrail approximately 1200m from Kirkby station to a new station at Headbolt lane with a corresponding shift of ELR:WKL2 terminus from kirkby to headbolt lane.
Role: Designer , I have been involved with multiple tasks under this project as listed below:
LAP Production support & Scheme Plan production Support for the Adding new plat forms at station
TSR/ESR Design:
Scope of work:
Main scope of this project is to provide ESR/TSR designs at Inverkeithing Station and Cross Water of Luce area.
Role: Designer , I have been involved below:
Aster Track circuit Conversion (167295):
Scope of work:
The Main objective of this project is to convert obsolete U type aster track circuits to MVDC track circuits.
Role: Lead Designer , I have been involved with multiple tasks under this project as listed below:
Train Management Dispatching System:
Train Management Dispatching System:
As a Asst. Signalling Engineer, I have tested on Train Management dispatcher system applications like CAD, Code, Comm, Control, BOS, Field Simulator, View Client, Web APP & TMC in ARRC, Metro link, KCSP, NCTD, NICTD, FECR, AAF, FXE, MRL, KCT, BRC, Metra, Denver, NMRL, KCSM & NMRX Rail Roads
East Putney ESTL Plain Lining Stage 2:
Princess Hwy LC:
LNW Signalling Power Distribution Cable Renewals:
Produced correlation updates, stage designs, commissioning Copies & Modification designs which includes
Inverness Depot (Provision of Protected Staff Walkway):
LNE Signalling Power Distribution Renewals:
ETCS PLAN B (TPWS):
Class II Power Upgrade Works:
IRSE Signalling Designer, 00080215
Signalling Sighting Committee Member
UK Main Line Signalling
Train Management Dispatch System
I have successfully completed sandwich industry attachment internship training at 132/33KV Sub station Kanumolu, APTRANSCO with project title as Study of 132/33KV Sub-Station - Kanumolu. under A.E. supervision and guidance from 20-Nov-2015 to 17-May-2016.
I, Santhosh Yedla hereby declare that the above details mentioned are true to the best of my knowledge and belief.