Project Accomplishment:
GREENKO PROJECT (30 X 1.6 MW WTGS) AT BASAVANA BAGWADI SITE IN KARNATAKA, INDIA.
RAYALA GREENKO PROJECT (30 X1.6 MW WTG'S) AT ANANTAPUR SITE IN
ANDHRAPRADESH,INDIA
BHORUKA POWER PROJECT (24 X1.7 MW WTG'S) AT RAYBAG SITE IN KARNATAKA, INDIA
BHORUKA POWER PROJECT (24 X1.7 MW WTGS) AT GADAG SITE IN KARNATAKA, INDIA
MYTRAH PROJECT (52 X1.7 MW WTGS) AT JAISALMER SITE IN RAJASTHAN, INDIA
ELECTRA PROJECT ( 120 X 2.3 MW WTGS) AT WICHITA FALLS, UNITED STATES
KCT PROJECT (23 X1.7 MW WTGS) AT ASPARI SITE IN AP, INDIA
ATRIA POWER PROJECT (10X2.3 MW WTGS) AT CHITRADURGA SITE IN KA, INDIA
ECOREN PROJECT(25 X 2.3 MW WTGS) AT KADAPA SITE IN ANDHRAPRADESH, INDIA
MYTRAH POWER PROJECT (105 X 2.4 MW WTG'S) AT MANIYACHI SITE IN
TAMILNADU,INDIA
POWERICA(19X2.7MW WTG'S) AT GONDAL SITE IN GUJARAT WORK Proto SIERRA 3.3
EXECUTION IN KA, INDIA
Hong Phong1 (08X5.3 MW WTG's)CYPRESS PLATFORM INSTALLATION EXECUTION FOR
HP1, VIETNAM
BIM (22X5.5MW WTG's) Cypress Platform, Vietnam Powerica SECI VI (19X2.7MW) Khambalia, Gujarat, India.
Job Responsibilities:
- Development of I&C construction within budget.
- Completed the projects of 600MW + Cumulative from GEIIPL
- Responded promptly to customer inquiries or complaints.
- Ensured compliance with safety protocols, regulations and standards.
- As a CoE Team successfully installed first Cypress 5.5MW Turbine in Vietnam.
- Supporting all SA, APAC region on the crane lift plan & Method statement
- Supported for technical input for Sierra 3X Proto Turbine in India
- Developing best practices and tools for project execution and management by tracking project milestones and deliverables.
- Preparing the project progress reports, incorporating the variances for review with the leadership team.
- Lead the development and implementation of the project execution strategy based on the contract, involving cross-functional aspects, with a dedicated plan for every area.
- Actively participating in customer kickoff meetings to address GE's scope, schedule, and execution work plan. Provide verbal or written project status reports to project teams, management, subcontractors, customers, or owners.
- Enforce within the assigned scope of discipline that subcontractors and workers are following GE's EHS requirements at the site and report any continuing non-compliance.
- Enforcing the highest quality of workmanship and adherence to the Site Quality Plan by all within-the-discipline subcontractors (subcontracting environments), or self-performance erection forces.
- Provide a civil, installation, and commissioning plan (crane, logistics, contractors, tools) per contract or customer requirement.
- Prepare JSA, LOTO, and other relevant EHS documents, and be sure all work complies with GE Renewable Energy.
- Provided input for global installation and commissioning procedures for review.
- Ensure all quality standards, including a full documentation package for installation, under the respective latest cost-effective, high-quality project execution within the given timeframe and budget. Take care of customer satisfaction and NPS (Net Promoter Score).
- Reporting and controlling of COQ (Cost of Quality), and time tracking for the Installation Group on site, PAC case management, and monitoring.
- Coordination and implementation of retrofits and RFR (Red Flag Review) items; maintain and monitor e-tools like PAC, e-field service, M&P, Wind PLM, Documentum, and COQ WF, etc.