To serve the MEP Design environment with my intelligence and dedication. To find myself being involved in the growth and development of the organization. To add profits to the organization even by giving better services to the customers. STRENGHT I have good ability to learn on job, flexible, goal oriented & a team player. I Have ability to take independent responsibility as well as ability to contribute & be a productive team member.
Overview
14
14
years of professional experience
Work History
Associate - Plumbing and Fire Fighting
Urja Building Services Consultants Pvt Ltd
05.2015 - Current
Space planning of plumbing, firefighting, electrical and low voltage services for residential and commercial projects.
Detail planning and designing of Plumbing and Firefighting services as per project requirement.
Independently handling Orientation/Kick off meetings, client meetings and site visits.
Distribution of work, leading and guiding Engineers and drafting team for preparation of MEP drawings and ensuring completion of work as per deadlines.
Checking of Schematic, Design development and GFC drawings.
Complete Plumbing & Firefighting design calculations such as Water demand, STP, Solid waste genration, Storm water drain, PRV, Drainage diversion, Drainage stack, Drainage Infra, Rain water harvesting, ICV calculation, Orifice plate and pumps calculations.
Co-ordination with clients for the project related requirement as and when required.
Preparation of Design Base Report (DBR).
Quantity take off for Plumbing and firefighting services.
Preparation of Bill of Quantities (BOQ’s) and estimation.
Monthly project wise planning for billing and follow-up with client for payments.
Checking of slab before casting with respect to MEP services.
Potential:
Basic Planning knowledge of Electrical, Low voltage and Hvac System.
Good/Professional experience of Plumbing & Firefighting drafting.
Key Projects worked on:
Mahindra Life Space Developer’s – Happinest-1 at Tathawade, Pune – 18 Lac Sq.ft
Mahindra Life Spaces Developer’s – Citadel at Pimpri, Pune – 40 Lac Sq.ft
SD Corp (Shapoorji Pallonji) - North Parcel 1.2 at Kandhivali, Mumbai - 12 Lac Sq.ft
Lodha Developers – Regalia at Mulund – 2B + G + 38 floors x 2 Wings + 3B + G + 12 floors MLCP + 13 floor Rehab
Lodha Developers – Raj Tattva – 1B + G + 2P + 36 floors x 2 Wings
Rustomjee’s – Ashiyana at Juhu – 2B + G + 15 Floors
K-Raheja - Trombay House at Juhu, Andheri – B + G +13 Floors – Premium Building
N rose Developer’s - Northern Hills at Dahisar, Mumbai – 2B + LG + UG + 10P + 57 Floors x 2 wings
N rose Developer’s - Northern Heights at Dahisar, Mumbai – B + G + 2P + 43 Floors x 2 wings
Options and Evershine Developers Joint Venture - Kinara at Juhu, Andheri – 2B + G +15 Floors
State and Central Government’s – GST Bhavan at Wadala – 2B + G + 5P + 22 Floors x 4 wings
City Walk – Commercial Complex at Democratic Republic of Congo, Africa
LA Galleria – Commercial Complex at Democratic Republic of Congo, Africa
GNP Group – Vihar Lake at Powai, Mumbai – G + 8P + 27 Floors x 2 wings + 20 Floors x 2 wings
Techno Fresh world LLP – Indraprasth at Worli, Mumbai – B + G + 6P + 36 Floors + 20 Floors Rehab Wing
Sahaj Developers – Saroj 9 at Matunga, Mumbai – B + G + 6P + 11 Floors – Premium Building
Dattani Developers – Mall at Vasai – 15 Lac Sq.ft
Mechanical Engineer
M/s Voltas Ltd
06.2014 - 05.2015
Tendering of project for plumbing and Hvac Services
Quantity Take-off as per IFC & Shop drawings
Preparation of bill of quantities for plumbing and Hvac Services
Preparation of shop drawings for External Services (Drainage, Storm Water, Water Supply)
Independently preparation of schematic drawings from shop drawings
Independently revised drawings as per client’s comments
Projects Worked On:
Salwa Beach Resort – Qatar
W-Hotel Palm jumeirah – Dubai
Changi General Hospital - Singapore
Altair Tower – Srilanka
JTC Food HUB – Singapore etc.
Line Engineer
Bajaj Auto Ltd
08.2009 - 04.2014
Procurement, Logistics & Supply Chain Management, Procurement of material as per requirement of daily, weekly and monthly production
Planning of spare parts and VOR requirements for plant
Responsible for procurement of higher value items like_
Carburettor, ECU (Engine control unit, CDI, Wiring harness, Head lamps, Brake kits, Oil coolers, Air filters etc
Responsible for uninterrupted flow of material to reduce down time of the production line
Manpower handling for continuous supply of material on production line
Planning for Long lead time items to avoid shortages
Planning & controlling the material to achieve the daily, weekly & monthly production target
Follow up of material shortages with other production shops, warehouses support & vendors etc
Monitoring and control on physical stock to avoid production loss
Planning the material flow & production on labour charges at vendors.
Monitoring physical stock of A, B & C class items with SAP system stock
Implementation of MILK RUNS for items critical for Production due to transportation delay
Continuously implementing KAIZENS in working area
Worked as a PIV (perpetual inventory verification) Co-ordinator to achieve yearly targets of stock verification
Knowledge of all types of dispatches like Chargeable, OLC (On labour charges), Loan, Rejection system Etc
Knowledge of making GRN for material received in store.
Permanent address : H.No-1388 B, Rajiwada naka, Ratnagiri, Maharashtra, India.
Date of Birth : 05 September 1990
Gender : Male
Age : 32 years
Marital status : Unmarried
Nationality : Indian
Place : Mumbai
Declaration
I hereby declare that the above mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above mentioned particulars.