Summary
Overview
Work History
Education
Skills
Timeline
Generic

SHAMSAD ALAM

Siwan,BR

Summary

Seeking Mechanical Technician Millwright level assignment in a reputed organization, where I can utilize my more than 12.7 years of experience. Summary of Major Job execution Having 12..7 years experience (Gulf Experience-9.7 yrs) in the field of Static and Rotary Equipment Installation,Alignment,Prerservation and Piping Installation activities related to Construction of Oil & Gas, petrochemical in Middle East Algeria & India.

Overview

9
9
years of professional experience
3
3
years of post-secondary education

Work History

Millwright fore man

Consolidated Contractors Company, CCC
  • Project:Sahil and Shafull field Development project

Mechanical Technician

Hyundai Engineering Company Ltd
Elmilia , Bilara
2018.10 - 2021.12
  • Combine Cycle Power Plant,1398 MW,(CCPP, Installation & Alingnment of Gas turbine.(MS9001 FA)
  • Installation & Alignment of ACC (Air Cool Condenser) Tube bundles, Fan Motor & Blades
  • Alignments, Levelling and verticality adjustment for all ACC structure and support
  • Pumps alignment by Reverse dial and Rim & Face Indicator methods
  • DBSE,Soft Foot and Shimming calculation and installation of shims to make proper alignment
  • Alignment of piping to the pump suction line.
  • Inspected and tested equipment, machinery and components to diagnose issues, recognize defects and determine appropriate repairs.
  • Prepared and installed exchangers and vessels.
  • Frequently diagnosed mechanical problems and determined how to correct issues.
  • Recommended retransmission equipment employment based on capabilities of equipment and mission requirements.
  • Evaluated design drawings for new and changed tools by measuring dimensions and examining specifications.
  • Created preliminary layouts and made calculations regarding parts, labor and assembly.
  • Performed research to develop equipment specifications for system performance parameters.

Millwright technician

Saudi Techint Ltd
Al Khafji , Saudi Arabia
2014.08 - 2016.12
  • Upgrading Hout Crude onshore facility project, Installation of Rotating Equipments ( Pumps-centrifugal/rotary, Fan and Blower)
  • Installation of Static Equipments ( Fin Fan Coolers, Columns, Tanks, Vessels and internals etc.)
  • Alignments, Levelling and verticality adjustment for all the rotary and static equipment including Boiler, Columns, Steam Drums, centrifugal and reciprocating pumps
  • Pumps alignment by Reverse dial and Rim & Face Indicator methods installation of shims to make proper alignment
  • DBSE calculation between the shafts of Pump and motor
  • Soft Foot calculation
  • Preservation of static and rotary equipments
  • Alignment of piping to the pump suction line
  • Hydrotest and pneumatic test of piping
  • Air blowing /water flushing /Bolt torque and reinstatement of pipe.
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Inspected and examined all machinery and equipment to detect malfunctions or irregularities.
  • Installed stationary industrial machinery and mechanical equipment according to layout plans.
  • Connected power unit to machines or steam piping to equipment, and tested units to evaluate mechanical operation.

Millwright

CCIC
Sahil And Sah , UAE
2011.06 - 2012.12
  • Installation of Rotating Equipments ( Turbine, Pumps-centrifugal/rotary, Fan and Blower)
  • Installation of Static Equipments ( Fin Fan Coolers, Columns, Tanks, Vessels and internals etc.)
  • Alignments, Levelling and verticality adjustment for all the rotary and static equipment including Boiler, Columns, Steam Drums, centrifugal and reciprocating pumps
  • Static equipment Internal cleaning and box-up
  • Pumps alignment by Reverse dial and Rim & Face Indicator methods
  • DBSE,Soft Foot and Shimming calculation and installation of shims to make proper alignment
  • Preservation of static and rotary equipments
  • Alignment of piping to the pump suction line.
  • Inspected and examined all machinery and equipment to detect malfunctions or irregularities.
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Laid out mounting holes, using measuring instruments and drilled holes with power drill.
  • Increased customer satisfaction by resolving issues.

Millwright Technician

Consolidated Contractors Company, CCC
Al Ruais , UAE
2007.02 - 2009.10
  • Borogue 2 Ethylene cracker project, Installation of Static and Rotating Equipments ( Compressors, Pumps-centrifugal/rotary, Fan and Blower, Heater, Fin Fan Coolers, Columns, Tanks, Vessels and internals etc.)
  • Alignments, Levelling and verticality adjustment for all the rotary and static equipment including Heater,Boiler, Columns, Steam Drums, centrifugal and reciprocating pumps
  • Pumps alignment by Reverse dial and Rim & Face Indicator methods
  • DBSE,Soft foot,Shimming calculation and installation of shims to make proper alignment
  • Preservation of static and rotary equipments
  • Alignment of piping to the pump suction line
  • Hydrotest/Pneumatic test, Air blowing and water flushing of piping .
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Inspected and examined all machinery and equipment to detect malfunctions or irregularities.
  • Positioned steel beams to support bedplates of machines and equipment weighing over Number pounds, using blueprints and schematic drawings.

Millwright Technician

Essar construction and engg pvt. Ltd
2004.02 - 2007.01
  • Static and Rotary equipment installation,Alignment,box-up and preservation activities.

Education

Diploma - Mechanical Engineering

Intellectual Institute of Management & Technology
New Delhi
2002.01 - 2005.02

Skills

Profound knowledge of the relevant tools

undefined

Timeline

Mechanical Technician

Hyundai Engineering Company Ltd
2018.10 - 2021.12

Millwright technician

Saudi Techint Ltd
2014.08 - 2016.12

Millwright

CCIC
2011.06 - 2012.12

Millwright Technician

Consolidated Contractors Company, CCC
2007.02 - 2009.10

Millwright Technician

Essar construction and engg pvt. Ltd
2004.02 - 2007.01

Diploma - Mechanical Engineering

Intellectual Institute of Management & Technology
2002.01 - 2005.02

Millwright fore man

Consolidated Contractors Company, CCC
SHAMSAD ALAM