Summary
Overview
Work History
Education
Skills
Timeline
Generic

SHAMSAD ALAM

Siwan,BR

Summary

Seeking Mechanical Technician Millwright level assignment in a reputed organization, where I can utilize my more than 12.7 years of experience. Summary of Major Job execution Having 12..7 years experience (Gulf Experience-9.7 yrs) in the field of Static and Rotary Equipment Installation,Alignment,Prerservation and Piping Installation activities related to Construction of Oil & Gas, petrochemical in Middle East Algeria & India.

Overview

9
9
years of professional experience
3
3
years of post-secondary education

Work History

Millwright fore man

Consolidated Contractors Company, CCC
  • Project:Sahil and Shafull field Development project

Mechanical Technician

Hyundai Engineering Company Ltd
Elmilia, Bilara
10.2018 - 12.2021
  • Combine Cycle Power Plant,1398 MW,(CCPP, Installation & Alingnment of Gas turbine.(MS9001 FA)
  • Installation & Alignment of ACC (Air Cool Condenser) Tube bundles, Fan Motor & Blades
  • Alignments, Levelling and verticality adjustment for all ACC structure and support
  • Pumps alignment by Reverse dial and Rim & Face Indicator methods
  • DBSE,Soft Foot and Shimming calculation and installation of shims to make proper alignment
  • Alignment of piping to the pump suction line.
  • Inspected and tested equipment, machinery and components to diagnose issues, recognize defects and determine appropriate repairs.
  • Prepared and installed exchangers and vessels.
  • Frequently diagnosed mechanical problems and determined how to correct issues.
  • Recommended retransmission equipment employment based on capabilities of equipment and mission requirements.
  • Evaluated design drawings for new and changed tools by measuring dimensions and examining specifications.
  • Created preliminary layouts and made calculations regarding parts, labor and assembly.
  • Performed research to develop equipment specifications for system performance parameters.

Millwright technician

Saudi Techint Ltd
Al Khafji, Saudi Arabia
08.2014 - 12.2016
  • Upgrading Hout Crude onshore facility project, Installation of Rotating Equipments ( Pumps-centrifugal/rotary, Fan and Blower)
  • Installation of Static Equipments ( Fin Fan Coolers, Columns, Tanks, Vessels and internals etc.)
  • Alignments, Levelling and verticality adjustment for all the rotary and static equipment including Boiler, Columns, Steam Drums, centrifugal and reciprocating pumps
  • Pumps alignment by Reverse dial and Rim & Face Indicator methods installation of shims to make proper alignment
  • DBSE calculation between the shafts of Pump and motor
  • Soft Foot calculation
  • Preservation of static and rotary equipments
  • Alignment of piping to the pump suction line
  • Hydrotest and pneumatic test of piping
  • Air blowing /water flushing /Bolt torque and reinstatement of pipe.
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Inspected and examined all machinery and equipment to detect malfunctions or irregularities.
  • Installed stationary industrial machinery and mechanical equipment according to layout plans.
  • Connected power unit to machines or steam piping to equipment, and tested units to evaluate mechanical operation.

Millwright

CCIC
Sahil And Sah, UAE
06.2011 - 12.2012
  • Installation of Rotating Equipments ( Turbine, Pumps-centrifugal/rotary, Fan and Blower)
  • Installation of Static Equipments ( Fin Fan Coolers, Columns, Tanks, Vessels and internals etc.)
  • Alignments, Levelling and verticality adjustment for all the rotary and static equipment including Boiler, Columns, Steam Drums, centrifugal and reciprocating pumps
  • Static equipment Internal cleaning and box-up
  • Pumps alignment by Reverse dial and Rim & Face Indicator methods
  • DBSE,Soft Foot and Shimming calculation and installation of shims to make proper alignment
  • Preservation of static and rotary equipments
  • Alignment of piping to the pump suction line.
  • Inspected and examined all machinery and equipment to detect malfunctions or irregularities.
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Laid out mounting holes, using measuring instruments and drilled holes with power drill.
  • Increased customer satisfaction by resolving issues.

Millwright Technician

Consolidated Contractors Company, CCC
Al Ruais, UAE
02.2007 - 10.2009
  • Borogue 2 Ethylene cracker project, Installation of Static and Rotating Equipments ( Compressors, Pumps-centrifugal/rotary, Fan and Blower, Heater, Fin Fan Coolers, Columns, Tanks, Vessels and internals etc.)
  • Alignments, Levelling and verticality adjustment for all the rotary and static equipment including Heater,Boiler, Columns, Steam Drums, centrifugal and reciprocating pumps
  • Pumps alignment by Reverse dial and Rim & Face Indicator methods
  • DBSE,Soft foot,Shimming calculation and installation of shims to make proper alignment
  • Preservation of static and rotary equipments
  • Alignment of piping to the pump suction line
  • Hydrotest/Pneumatic test, Air blowing and water flushing of piping .
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Inspected and examined all machinery and equipment to detect malfunctions or irregularities.
  • Positioned steel beams to support bedplates of machines and equipment weighing over Number pounds, using blueprints and schematic drawings.

Millwright Technician

Essar construction and engg pvt. Ltd
02.2004 - 01.2007
  • Static and Rotary equipment installation,Alignment,box-up and preservation activities.

Education

Diploma - Mechanical Engineering

Intellectual Institute of Management & Technology
New Delhi
01.2002 - 02.2005

Skills

Profound knowledge of the relevant tools

Mechanical skills

Physical strength and stamina

Particular attention to details

A High School diploma with several years of experience as a professional or as an apprentice

Mechanical skills, which enable a mechanical fitter to understand which tools to use and how they should be used

Adequate knowledge of system structures and how to troubleshoot systems by utilizing the knowledge of how the system was designed to perform

Problem-solving skills, which enable a mechanical fitter to solve and repair system issues efficiently and effectively

Timeline

Mechanical Technician

Hyundai Engineering Company Ltd
10.2018 - 12.2021

Millwright technician

Saudi Techint Ltd
08.2014 - 12.2016

Millwright

CCIC
06.2011 - 12.2012

Millwright Technician

Consolidated Contractors Company, CCC
02.2007 - 10.2009

Millwright Technician

Essar construction and engg pvt. Ltd
02.2004 - 01.2007

Diploma - Mechanical Engineering

Intellectual Institute of Management & Technology
01.2002 - 02.2005

Millwright fore man

Consolidated Contractors Company, CCC
SHAMSAD ALAM