Summary
Overview
Work History
Education
Skills
Websites
Accomplishments
DeClARatioN
Operations & Maintenance:
Production Management:
Timeline
Generic

SHIV KUMAR UKE

Working In Steel Melt Shop Operation
BHILAI

Summary

Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level manager position. Ready to help team achieve company goals.

Overview

20
20
years of professional experience

Work History

Manager

LLOYDS METALS AND ENERGY LTD GHUGHUS
07.2026 - Current
  • Identified plans and resources required to meet project goals and objectives.
  • Managed projects from procurement to commission.
  • Coordinated material procurement and required services for projects within budget requirements.
  • Provided detailed technical and operational direction in project challenges, consistently meeting deliverables according to deadlines.
  • Negotiated and managed third-party contracts related to project deliverables.
  • Developed and implemented project plans and budgets to ensure successful execution.
  • Reported regularly to managers on project budget, progress, and technical problems.

MANAGER SMS (Operation)

JSW _JEF STEEL LTD
07.2013 - 07.2026
  • As an operation Shift Manager at SMS-1 (110 ton/50-80 MVA Four EAF).
  • As a metallurgist and commissioning
  • As a metallurgist and commissioning engineer, working on modified Electric arc furnace
  • Studying commissioning activity.
  • Studying commissioning activities and giving feedback for improvement or modification of procedure or item.
  • Currently working on
  • Currently working on setting up charge mix, oxygen injection and tap input recipe.
  • Working with local operation team of troubleshoot the problem and maximize per day
  • Production
  • Also working on production parameter
  • Also working on production parameter of EAF operation and coordination with other respective department to avoid delay.
  • Participated in technical discussions, equipment installation, and HMI design finalization.
  • Worked on Hot and cold commissioning of the electric arc furnace (110 ton/50-80 MVA) supplied with the charge mix of 55% HOT METAL AND 45% DRI+Scrape charge mix.
  • Worked on project commissioning troubleshooting in at SMS-I.
  • PPC-required heat tapping chemistry and casting heat planning and execution
  • Ladle management and clear communication with the caster are essential for avoiding delays and furnace shutdowns.
  • Manpower handling and safety considerations.
  • Minimize input resources' cost and maximize production, also achieving the target on time.
  • Implementation for online heat tracking and data input tracking.
  • Many times 32Heat tapped in 8 Hr Shift duty.
  • Successfully managed budgets and allocated resources to maximize productivity and profitability.
  • Resolved staff member conflicts, actively listening to concerns and finding appropriate middle ground.
  • Improved marketing to attract new customers and promote business.
  • Developed detailed plans based on broad guidance and direction.
  • Maintained professional, organized, and safe environment for employees and patrons.
  • Set aggressive targets for employees to drive company success and strengthen motivation.

SR ENGINEER (Operation)

UTTAM VALUE STEEL LTD
02.2007 - 07.2013
  • Worked as a Melt Shop Shift engineer of a 60 ton capacity of EAF/LF/ CASTER.
  • Managed scrap yard to plan for EAF charge mix.
  • Was responsible for safety consideration of shift manpower and safety PPEs.
  • Worked on commissioning and stabilization of the electric arc furnace 60 t along with HOTMETAL procedure setup.
  • Worked with the SMS- team to standardize processes, safety interlocks, and HMI design finalization for smooth operation.
  • Had achieved tapping of 07 heat/day with a heat capacity of 60 tons/furnace.
  • Enforced rules and regulations to keep working environment safe.
  • Controlled project costs by approving expenditures.
  • Assisted in developing cost-effective solutions to engineering problems.
  • Analyzed and interpreted data to identify trends and recommend improvements.
  • Implemented new strategies to reduce costs and improve efficiency of engineering team.
  • Created detailed reports on engineering activities and findings.

GET

M/S SIMPLEX CASTING LTD RAIPUR
09.2006 - 02.2007
  • I began working as a GET at SIMLEX CASTING LTD on the SMS-Operation
  • Traveled to different sites to gain practical experience in new work zones.
  • Met cost standards by preparing cost-benefit analysis and tracking and reporting expenses.
  • Studied corrections from senior engineers to learn and grow professionally.

Education

BACHLOR OF ENGINEERING - METALLURGICAL ENGINEERING

G. E. C. RAIPUR
01.2006

Skills

  • Languages-Hindi, English,Marathi
  • MS WORD, EXCEL,& POWER POINT
  • EXCELLENT COMMUNICATION
  • DEDICATED TO WORK
  • COOL HEAD UNDER PRESSURE

Accomplishments

  • BEST PERFORMER OF THE YEAR :- (OUTSTANDING RATING) MAY-2011

DeClARatioN

To the best of my knowledge and belief, the information given in this form is true. Date: -2026-08-01 SHIVKUMAR UKE

Operations & Maintenance:

  • Effectively participating in maintenance schedules during shut-down.
  • Identifying the causes of purging failure.
  • Proactively identify areas of obstruction/breakdowns.
  • Improving Overall Equipment involved in improving yield by eliminating root cause analysis

Production Management:

  • Proficiency in making foamy slag during EAF operation.
  • Proficiency in making heat with high yield.
  • Awareness of furnace health.
  • Proficiency in addition of all alloying elements & fast heat making to achieve aim chemistry
  • Proficiency in making fast heat to match sequence in continuous casting machine.
  • Awareness of power consumption.
  • SMS Refractory management for managing costs and getting optimum life.
  • Responsible for Total Production Management in SMS section.

Timeline

Manager

LLOYDS METALS AND ENERGY LTD GHUGHUS
07.2026 - Current

MANAGER SMS (Operation)

JSW _JEF STEEL LTD
07.2013 - 07.2026

SR ENGINEER (Operation)

UTTAM VALUE STEEL LTD
02.2007 - 07.2013

GET

M/S SIMPLEX CASTING LTD RAIPUR
09.2006 - 02.2007

BACHLOR OF ENGINEERING - METALLURGICAL ENGINEERING

G. E. C. RAIPUR
SHIV KUMAR UKEWorking In Steel Melt Shop Operation