Summary

Self-motivated, hands-on Civil Coordinating and Site execution offering over 12 years of successfully working within a broad range of facilities ensuring highest levels of quality control and assurance. Dedicated and motivated to utilize knowledge gained through experience to add immediate value to a growing organization. Proficient in the areas of workforce performance management, productivity and progress oversight, and cross-functional collaboration.

Professional Highlights

  • Safety at work as per OSHA standards. Zero Accidents and very less near misses have been reported.
  • Quality at work as per Field quality assurance plan according to the technical terms of the contract have been take care atmost.
  • The cost benefits during the execution of projects have identified at various times and immediate action taken for the benefit of the company.
  • Timely completion of the project with desired quality as per schedule mentioned in the contract have been taken care at all the times.
  • Handled individually a team of 7 engineers & labor strength of 450 approximate on daily basis during the execution of projects.
  • The billing system (Client/Consultant/Contractor/Vendor) as per the companies policy have been maintained.
  • Always followed the technical & commercial terms of the contract on top priority.

Overview

12
12
years of professional experience
1
1
Language

Work History

Deputy Manager

Engineers India Limited
Panipat
10.2023 - Current
  • All the Civil works of IOCL-Panipat Refinery Expansion Project(P-25) MUG Unit, which includes substation building, Satellite rack room, all equipment foundation, pipe racks, roads and drains
  • Physically checking all the incoming materials and verifying all IMIR
  • Monitors work in progress and prepares report
  • Witnessing and verifying all the ITP.

Project Coordinator

AECOM
Jamnagar
01.2022 - 08.2023
  • Ensure the utmost adherence to the HSE & Quality policies of the company
  • Assists in preparation and implementation of Project Execution Plan (PEP)
  • Attends the Weekly Progress Meetings (Internal as well as with Client) and assist in preparation of Minutes Of Meetings
  • Monitors work in progress and prepares weekly report of the status of each assignment
  • Ensuring all procedures and calculations are submitted to the client for review and approval
  • Coordinates materials and assists in the logistics, its shipment and receipt at construction site
  • Coordinates with all project related personnel on day-today progress of work activities, procurement and operations to ensure timely completion of the project
  • Provide full support as required by the Management and PMT for all projects.

Senior Manager

Reliance BP Mobility
Patna
11.2020 - 08.2021
  • Construction of Petrol stations, sales building, fuel court, driveway and other allied structures
  • Proper Smoothening & integration of works with the vendors, and sequencing of all the major site Activities
  • Strictly following the required quality standard of all Civil works
  • Preparation of Inspection & Test Plan (ITP) & Material inspection report process (IRP)
  • Issuing of IFC drawings to the contractors and collected the execution methodology
  • Preparation of SOQ’s for work allotment & Analysis of Rates
  • Data collections & compilations from design team for smooth functioning of construction activities
  • Ensure the utmost Adherence to the HSE policies of the company
  • Closely monitoring the quality standards during execution of works and ensure the proper location of embedded items in the concrete
  • Checking & certification of contractor’s bills.

Assistant Manager

Patanjali Ayurveda Ltd.
Tezpur
11.2016 - 05.2019
  • Ground breaking to Handing over to the operation’s team
  • Collected DPR from the project later compilation for meetings
  • Collected the Weekly reports from the sites and consolidated for the weekly review meetings
  • Advised the site office for the preparation of the monthly resource’s requirement report
  • Prepared the variance reports based on the works executed with the works executed by the subcontractors
  • Follow up the site team and ensured the reconciliation of major materials like cement, Reinforced steel & structural Steel
  • Checked and verified the subcontractors bills and recommendation for release of payments
  • Interaction with consultants for release & revise drawings as per the project progress
  • Continues meeting with Higher officials for smooth progress of project.

Manager

Reliance Industries Ltd.
Jamnagar
04.2014 - 11.2016
  • Execution of Air separation unit which includes all civil work like Substation, Cold Box, Main Air Compressor, Nitrogen Air compressor, LIN & LOX tank, silencers & water coolers, machine shelter, molecular sieve, Train 1 & 2, evaporation coolers
  • Maintaining the proper record of drawings, RA Bills, site instructions and Measurement sheets
  • Collected the daily progress from each contractor and prepared the consolidated DPR and circulated to the Higher officials
  • Contractor’s materials stock verification and early warning the contractor
  • Daily site visits and site walkthrough with the contractor’s representatives
  • Prepared catch up plans and follow up with the contractors
  • Reconciliation of all Consumables.

Site Engineer

BGR Energy Systems
Marwa
08.2011 - 03.2014
  • Execution of all civil works Ash handling system at 2 X 500 MW thermal power
  • Preparation & Checking of BBS, plant Layout & level fixing with auto level, Concreting & shuttering alignment work
  • Collected DPR from the project later compilation for meetings
  • Collected the Weekly reports from the sites and consolidated for the weekly review meetings
  • Advised the site office for the preparation of the monthly resource’s requirement report
  • Prepared the variance reports based on the works executed with the works executed by the subcontractors
  • Follow up the site team and ensured the reconciliation of major materials like cement, Reinforced steel & structural Steel
  • Checked and verified the subcontractors bills and recommendation for release of payments
  • Interaction with consultants for release & revise drawings as per the project progress
  • Continues meeting with Higher officials for smooth progress of project
  • Coordinate with other professionals, such as contractors, architects, engineers, and plumbers, to ensure job success.

Education

PGPPM - Project Management

NICMAR (SODE)
08.2015

BE - Civil Engineering

Sathyabam University
06.2011

Skills

  • MS office
  • Auto Cad

Languages

Hindi
First Language
English
Upper Intermediate (B2)
B2

Timeline

Deputy Manager

Engineers India Limited
10.2023 - Current

Project Coordinator

AECOM
01.2022 - 08.2023

Senior Manager

Reliance BP Mobility
11.2020 - 08.2021

Assistant Manager

Patanjali Ayurveda Ltd.
11.2016 - 05.2019

Manager

Reliance Industries Ltd.
04.2014 - 11.2016

Site Engineer

BGR Energy Systems
08.2011 - 03.2014

PGPPM - Project Management

NICMAR (SODE)

BE - Civil Engineering

Sathyabam University