Summary
Overview
Work History
Education
Skills
Career Highlights
Awards
Disclaimer
Timeline
Generic
Srikanth Adoni

Srikanth Adoni

Bengaluru

Summary

Dynamic Electrical Integration Engineer with extensive experience at Alstom Transportation, specializing in CATIA V5 for electrical harness design and interface point management. Proven track record in delivering high-quality projects on time, demonstrating strong technical documentation skills and effective team collaboration to resolve complex engineering challenges.

Overview

13
13
years of professional experience

Work History

Electrical Integration Engineer

Alstom Transportation
Bengaluru
06.2023 - Current

Client : France Government.

  • Accountable for the Delivery of Electrical Harness Integration outputs, in compliance with the Engineering Quality, Cost and delivery commitments.
  • Cable trays/Cable ducts design and it’s mounting definition
  • Electrical Harness routing in CATIA V5 using EHI work bench based on the synoptic, schematic, connector and device list
  • Bundling/Segregation of harnesses based on the EMC (Electromagnetic Compatibility) classification.
  • Mounting of Electrical equipment’s
  • Design of Jumper cables and Earthling /Grounding
  • Bogie and Underframe Electrical mounting definitions
  • Electrical Cubicle design, Mounting and complete harness routing (Structure definition, Welding, Fastening definition, circuit brackets, relays and other communication and signaling equipment’s as per electrical architecture.
  • Equipment position definition and interface development: Example: CCTV camera, Speaker, LCD display, Dynamic route monitor
  • XML file from the schematics to be linked with the Harness designed in CATIA V5 and exchanged with Schematic team.

Project Lead

L & T Technology services
Bengaluru
05.2022 - 06.2023

Client : Safran Aerospace GMBH

  • Worked on A350F program in Electrical Harness Routing.
  • Coordinated with the onsite team to understand the technical details and share the same with the offshore Team.
  • Experienced in interface point management (IPM) Activity.
  • Involved in SAM A to SAM C and GRM Activity for A350F XWB-1000.
  • Extensively worked on Bracket proposal with respect to design guidelines provided by Airbus and WSP (Work share partners) through interface point management (IR-IN-IP) process.
  • Electrical harness routing and segregation of electrical bundles in compliance with TDD and SIDP for MSN’s
  • Worked on Product Structure creation for V928 and V929 part zone in VPM
  • Constantly coordinated with the team to resolve the technical issue and to make sure the quality deliverables are achieved on time.
  • PDM attributes updating in SSCI

Lead Engineer

Quest Global
Bengaluru
10.2017 - 01.2022

Client: Bombardier Transportation- Derby UK, Production Support for Crespin, France and NJT Canada

  • Handling Work Packages, Estimating delivery time and Hrs.
  • Coordination with the onsite team to understand and share the technical details of the project
  • Electrical routings are done referring to Harness layouts and equipment layouts provided.
  • CSV computation is done using CATElectre to finalize the Diameter of the harness and connectors connection.
  • Implemented the Harness layouts in the Saloon Roof and Body side of the Various Cars like DM, PM, M1, TLW, PMLW.
  • Carryout the PDM updates such as revision of the articles, uploading the latest drawings, EN report generation and submit the DRL.
  • Studying the Change requests raised by the production team. Interaction with Cross functional teams and suppliers for resolving Change request issues and implementing the changes on the affected models, assemblies and drawings in Catia and VPM.

Senior Design Engineer

TechMahindra Ltd
Bengaluru
08.2016 - 10.2017

Client: Alstom Transport – COE Interiors Valenciennes, France

  • Discuss the new developments with the integrators and do the modifications required to achieve the functionality.
  • Changed the design due to the manufacturing problems by daily communication with the clients.
  • Resolved issues with respect to space allocation and eliminating clash and interference faced while assembling the parts
  • Review the work together with all other stake holders to finalize the designs modification
  • Documenting the lessons learned from Customer observation and Remarks, share the same with all cross functional team to follow this template for future projects.
  • PROJECTS: Sydney Metro & Various sub systems

Design Engineer

Cyient Ltd
Bengaluru
01.2013 - 08.2016

Client: Alstom Transport – COE Interiors Valenciennes, France

  • To read and interpret the customer input drawings.
  • Creating the Design table for the Part Families of Various configurations.
  • Modeling the Part in Catia V5 and linking the design table with the CATPart.
  • Controlling the Dimensions in the sketch with Knowledge Ware Advisor Module in Catia
  • PROJECTS: Alstom, Bell helicopter, Diehl Aerospace

Education

Bachelor of Engineering - Mechanical

Bangalore Institute of Technology
Bengaluru
07.2012

Skills

  • CATIA V5
  • Solid Edge
  • Auto CAD
  • DATA MANAGEMENT
  • ENOVIA
  • PDM
  • SAP
  • TEAM CENTER
  • PASS SSI
  • TREND,DMU,IMADE,RIC
  • MS Office Tools
  • EXCEL
  • WORD
  • PPT

Career Highlights

  • Overall, 11 years of experience in electromechanical design and development for aerospace and rail
  • Good Exposure in Electrical Harness Design and Integration for lower and upper deck for A350F, Saloon Roof Area and side walls for Trains
  • Familiar with computation process using CATElectre.
  • Experienced in Flattening and form board drawing creation.
  • Conversant with Basics of GD&T and welding symbols.
  • Extensive Knowledge in studying Rail and Aerospace Drawings
  • Familiar with MBD’s for single parts and assemblies

Awards

Received associate of the month on multiple occasion., 

Awarded PAT ON BACK for Excellent Support for Belfort site , 

Received Team of the Month award for successful complication of standard parts project on time

Disclaimer

I, Srikanth Adoni, hereby declare that the information contained herein is true and correct to the best of myknowledge 

 

Srikanth Adoni

Timeline

Electrical Integration Engineer

Alstom Transportation
06.2023 - Current

Project Lead

L & T Technology services
05.2022 - 06.2023

Lead Engineer

Quest Global
10.2017 - 01.2022

Senior Design Engineer

TechMahindra Ltd
08.2016 - 10.2017

Design Engineer

Cyient Ltd
01.2013 - 08.2016

Bachelor of Engineering - Mechanical

Bangalore Institute of Technology
Srikanth Adoni