Summary
Overview
Work History
Education
Skills
Professional Exposure
Personal Information
Languages
Disclaimer
Timeline
Generic

Srinivasarao Sriramsetty

Guntur

Summary

Seeking a quality and motivated environment where the knowledge and experience can be shared and enriched and also looking for an opportunity where I can strengthen my career more and deliver the best skills in me for the benefits of the organization through continuous learning.

Overview

1
1
year of professional experience

Work History

Jr. Production Engineer

APEX Pvt Ltd
Guntur
12.2021 - 06.2022
  • Production and Quality Engineer

Jr. Production Engineer

APEX Solutions Pvt Ltd
Guntur
07.2021 - 12.2021
  • Production Engineer

Jr. Production Engineer

APEX Solutions Pvt Ltd
Guntur
02.2021 - 07.2021
  • Production and Quality Engineer

Jr. Production Engineer

APEX Pvt Ltd
Guntur
06.2022
  • Production and Quality Engineer

Education

B.Tech (Automobile) -

Eswar College Of Engineering & Technology Narasaraopet, JNTU Kakinada
01.2020

Diploma (Automobile) -

Govt.Polytechnic For Minorities Nallapadu, State Board Of Technical Education & Training
01.2017

S.S.C -

Z.P.H.S Nallapadu, Board Of Secondary Education
01.2014

Skills

  • AutoCAD
  • Magellan & MicroStation
  • MS-Office, Excel & Outlook
  • Knowledge about HYBRID FIBER COAXIAL Network (HFC)
  • Self Confidence and positive Attitude
  • Quick learner
  • Adaptable to the change in environment
  • Problem solving

Professional Exposure

  • Jr. Production Engineer, APEX Solutions Pvt Ltd, Guntur, India, Production and Quality Engineer, 02/2021 to 07/2021, Charter 2011, Atlanta, Plan and Redraft (HFC network), Microstation Bentley, AutoCAD, 10/2021 to 07/2021, Charter communication is broadband cable system services provider that serves approximately 2,600,000 customers in 41 states with cable television, telephone and high speed internet services. The scope of the project is to redraft RF (coaxial), support and address from charter legacy lode data. Here we need to redraw different type of pole, strands, address and nodes, amplifiers, line extenders, in-line equalizers, splice, power supply, splitter, taps, cables boundary’s...etc. Initially copy the allocated Node/Grid related source with necessary inputs from respective folder find grid numbers given on source after finding location we can query the data Toolbars all available in Bentley toolbar section for placement of support features i.e. poles, pedastal, Vault, Handhole, Strand, trench and manhole etc. After placing all support Coax network will start at proposed location associated to a pole/ped. It will go to every Address location as per source AutoCAD Going forward certain Cables, taps, power supply, DCcoupler, splitter, line extenders & Amplifiers are used as per house count given on source. Avoid overlap with one another. As per network area draw node boundary with proper naming to the coax and fiber data. We will prepare deliverables like (BOM, Address, splice, trace reports).
  • Jr. Production Engineer, APEX Solutions Pvt Ltd, Guntur, India, Production Engineer, 07/2021 to 12/2021, BAU, Charter, Plan and Design HFC network, Magellan, 07/2021 to 12/2021, BAU projects now require an address validation file to be uploaded into the internal files of Prism, Xmier and MQMS. This file will outline any address changes/updates contrary to the walkout. In areas where street names are not present, you must add the street names using misc text. This is to identify and make the road names visible during pdf creation. The HFC network would be served to different users. HFC Access Network is that it uses RF frequencies for transportation of the information between the user side and the network side of the access network. As such, the information, including both signaling and user information, must be mapped in one way or another into the RF frequency spectrum and the traditionally used frequency bands for Radio and Television. In addition to the downstream traffic, some upstream traffic may be required. Depending upon the type and bandwidth of the information, different solutions may be required for different services to be supported. get with leadership to reach out to charter. Download all latest source PDF in Prism and it is opened in WPS. Review the information and determined the best possible route to feed all of the MUX wavelengths with information available in network area. It gives two wave lengths to serve all user side network and uses muxes in splitter. Since each CWDM/DWDM mux gets four channels adding (CH20-CH23) and create circuits & Sub-circuits. Then we follow storage loops condition also. From each cable draw distribution fiber network along with RF to feed customers and add Taps each customer location. No over lashing is permitted in distribution and over lashing is allowed with distribution and dedicated trunk route. BAU design every fiber equipment will be named manually in Magellan/AutoCAD application. Every SPLICE & FBTP node will be give connectivity from distribution cables and added splices, splitter splices at certain planned location. Draw the FTTH and Prism boundary around your groupings of addresses We prepare Deliverables like (Before, after, Overview Pdf, KMZ, Splice, HAF, MOP, PON, XIMER and trace report).
  • Jr. Production Engineer, APEX Solutions Pvt Ltd, Guntur, India, Production and Quality Engineer, 12/2021 to 06/2022, High Split design, Rainbow, Plan and Design HFC network, Magellan, 12/2021 to 06/2022, High Split projects now require files to be uploaded into the internal files of Prism, Xmier and MQMS. The main theme of high split design to upgrade existing equipment’s and to increase the frequency range from 750mz to 1000mz of HFC equipment’s. The HFC equipment’s change old station to new station(spec). Download all the Source PDF we have available and load them in to Adobe reader. Review the information and determined the best possible route to feed all of the HFC node with information available. Change the As-built comments in target as per source PDF, after that take a before PDF. Then start the HFC design, firstly upgrade the Actives & Passives (HFC node, Amplifier, Line extender, power supply, DC’s, splitters, Taps, etc.) current station to new station. After upgrade, run the analyzer and all taps should be upgraded or not need to check then check all taps, run the power from power supply. Draw the Prism boundary around your groupings of HFC network area. We prepare Deliverables like (Before, after print, BOM and XIMER reports).
  • Jr. Production Engineer, APEX Solutions Pvt Ltd, Guntur, India, Production and Quality Engineer, 06/2022 to present, RDOF, Charter, Plan and Design FTTH and FTTX network, Magellan, 06/2022 to present, RDOF projects now require an address validation file to be uploaded into the internal files of Prism, Xmier and MQMS. This file will outline any address changes/updates contrary to the walkout. In areas where street names are not present, you must add the street names using misc text. This is to identify and make the road names visible during pdf creation. If you determine the OLT would be better served from a different HE, get with leadership to reach out to charter. Download all the Rideout/walkout KMZ we have available and load them in to Google earth. Review the information and determined the best possible route to feed all of the OLTs with information available. In the backbone path draft a trunk network from the HFC tie point to the first OLT location. Since each OLT gets four channels adding (CH20-CH23) and create circuits & Sub-circuits. Then we follow storage loops condition also. From each OLT we will draw distribution fiber network to feed customers and add OTE (or) MST Taps each customer location. No over lashing is permitted in distribution and over lashing is allowed with distribution and dedicated trunk route. RDOF design every fiber equipment will be named manually in Magellan application. Every OTE (or) MST taps will be give connectivity from distribution cables and added splices, splitter splices at certain planned location. Draw the FTTH and Prism boundary around your groupings of addresses We prepare Deliverables like (Before, after, Overview Pdf, KMZ, Splice, HAF, MOP, PON, XIMER and trace report).

Personal Information

  • Father's Name: Krishna Sriramsetty
  • Date of Birth: 05/24/98
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Single

Languages

  • Telugu
  • English
  • Hindi

Disclaimer

I hereby declare that the above-mentioned information is true to best of my knowledge and belief.

Timeline

Jr. Production Engineer

APEX Pvt Ltd
06.2022

Jr. Production Engineer

APEX Pvt Ltd
12.2021 - 06.2022

Jr. Production Engineer

APEX Solutions Pvt Ltd
07.2021 - 12.2021

Jr. Production Engineer

APEX Solutions Pvt Ltd
02.2021 - 07.2021

B.Tech (Automobile) -

Eswar College Of Engineering & Technology Narasaraopet, JNTU Kakinada

Diploma (Automobile) -

Govt.Polytechnic For Minorities Nallapadu, State Board Of Technical Education & Training

S.S.C -

Z.P.H.S Nallapadu, Board Of Secondary Education
Srinivasarao Sriramsetty