Summary
Overview
Work History
Education
Skills
Languages
Certification
Timeline
Generic

Suman Mandal

Piping Manager/ Engineer
Kolkata

Summary

S K I L L S :

  • Construction Management
  • Value Engineering
  • Project Management
  • Piping Engineering

Having 16 years of relevant experience in Industrial construction (Piping & steel structure Construction) with various Industries like Thermal Power Plant, Renewable plants like Solar, Steel plant and Oil & Gas

Being Proud to got Chance to work in World Largest Single Location Solar Power Plant (648MW), India’s Biggest Thermal Power Plant in private sector (3x330+5*660MW) and World Largest Refinery in Jamnagar

Overview

18
18
years of professional experience
4
4
Certifications

Work History

Deputy Manager

Tecnimont Pvt. Ltd. Through Aarvi Encon Ltd.
05.2024 - Current

Job Summary:

Erection of AG piping as a area incharge, ISO Clearance, Mechanical Clearance, Hydro test, Box Up etc

Manager

Reliance Industries Limited.
02.2022 - 04.2024

Job Summary :

  • Demolition of old pipe line (as require)
  • Shifting of Stripper column -WT 63MT height 42m by jump over 3 PR and install in new location just a single short job. Proud to feel as a EIC of entire job and save RS. 1Crore.
  • Modification of Equipment: Modified total 31 nos. equipment (Column, Vessel, and Exchanger). Install total 102 new nozzle of various size with localized Hydro test. Worked as an EIC.
  • Tie in
  • IBR: IBR coordinator, IBR piping execution
  • Titanium Piping

Assistance Manager-Piping

L&T Hydrocarbon Engineering Limited
07.2019 - 01.2022

Job Summary: Erection of AG piping (250000 IM), ISO Clearance, Mechanical Clearance, Box Up etc. Erection up to 104” dia pipe

Manager-Piping

Reliance Industries Ltd. Jamnagar. Export Refinery Jamnager
05.2016 - 06.2019

Project :

  • 1. MPC (Minor Project Cell)- 3month turnaround Shutdown
  • 2 . R I L - J 3 P r o j e c t

Job Summary: Completed entire unit piping erection followed by ISO Clearance, Mechanical Clearance, Hydro test, Box up, MIQA, WTPA audit and final PSSR audit as per

Associate 1

Adani Infra Limited Through Adecco
01.2016 - 04.2016

Job Summary: Erection table and Module, Handling of different Module like Seasonal Solar, Front tech Solar, Bi facial Solar etc., Billing, Materials coordinate and Management

Deputy Manager

Akamai Construction Pvt Ltd.
08.2008 - 12.2015

Project : 1. J3-RIL- Jamnagar, Gujrat

2. 5x660 MW Adani Power Ltd- Mundra, Gujrat

3. 3x40 MW Shyam DRI – Rengali, Odisha

4. Action Ispat and Power Limited

Job Summary: Fabrication & Erection of Structure Steel and Piping Spool, Fabrication & Erection of Conical Structure. Handover to client followed by Mechanical clearance and Box up.

Assistance Engineer

Gannon Dunkerley & Co
08.2006 - 07.2008

Various type of structural work, co- ordinate with client &consultant

Education

Diploma - Mechanical Engineering

Ramkrishna Mission Shilpapitha- WBSCTE Board
Belgharia
04.2001 -

Higher Secondary - Science Education

WBBHSE
New Barrackpur
04.2001 -

Secondary Exam -

WBBSE Board
New Barrackpur
04.2001 -

Skills

  • Directed various functions such as fabrication, erection, mechanical clearances, hydro-testing of unit piping/urea piping; used different materials such as CS, SS, Alloy Steel (P5, P9, P11, P91, P22), and LTCS

  • Reviewed Engineering Drawings /Documents such as Equipment Layout, Schematic Diagrams, GAD and P&IDs; implemented Indian & International Piping Code & Standards as per the project requirement

  • Spearheaded on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output; planned project schedules as per the defined SOPs

  • Led a team of 10 Engineers and Supervisors and 100 workmen for successful completion of All construction activities including providing technical inputs for methodologies of construction And coordinating for site management activities; monitored inventory & stocks; coordinated With Planning Department for material procurement

  • Reviewed ITP & test packs; monitored fabrication & erection activities; spearheaded functions For mechanical clearance

  • Ensured accurate Hydro-Test and Pneumatic Analysis; assured timely completion of complete Project activities such as punch listing, verification of completion of all punch items, coordinated Pre-commissioning works (flushing, drying, chemical cleaning, spring supports setting); Restored piping and inspecting all pipe support

Languages

English
Advanced (C1)
Hindi
Advanced (C1)
Bengali
Advanced (C1)

Certification

ASNT NDT level II

Timeline

Deputy Manager

Tecnimont Pvt. Ltd. Through Aarvi Encon Ltd.
05.2024 - Current

Manager

Reliance Industries Limited.
02.2022 - 04.2024

Assistance Manager-Piping

L&T Hydrocarbon Engineering Limited
07.2019 - 01.2022

Manager-Piping

Reliance Industries Ltd. Jamnagar. Export Refinery Jamnager
05.2016 - 06.2019

Associate 1

Adani Infra Limited Through Adecco
01.2016 - 04.2016

Deputy Manager

Akamai Construction Pvt Ltd.
08.2008 - 12.2015

Assistance Engineer

Gannon Dunkerley & Co
08.2006 - 07.2008

Diploma - Mechanical Engineering

Ramkrishna Mission Shilpapitha- WBSCTE Board
04.2001 -

Higher Secondary - Science Education

WBBHSE
04.2001 -

Secondary Exam -

WBBSE Board
04.2001 -
Suman MandalPiping Manager/ Engineer