Talented leader and analytical problem-solver with over 18 years of experience successfully managing front-line Tunneling operations. Efficiently maintain and repair TBM and Tunneling equipment. Coordinate resources and staff to handle any requirement.
Specialist for:
All works related to Tunneling / Shaft sinking Engineering.
Material handling. TBM Using an EPB or Slurry TBM is based Assembling & dismantling and tunneling execution,
TBM slurry separation plant, SCHOMA Locomotives & Muhlhauser Flat cars, MSV (TMS) Hydraulic System, Air System, Transmission System, Cooling Water System, Engineering Works & Fabrication, Tunneling pipe line design Works, Railway Maintaining & Fabrication, conveyor systems & engineering etc.
Location:- Ismailia Road Tunnel Project, Ismailia, Egypt Ismailia Tunnels Under the Suez Canal Project.
Green Line Underground Doha - Qatar
Contracts C933. (DTL3)Singapore.
C917 and C918) Circle Line 3 and 4, Singapore.
Alimineti Madhava Reddy Project Srisailam
2.No Ø 10.0 m (32.8 ft.) Double Shield TBM machines Assembling, Robbins in At 43.5 km ( 27. miles ) the Alimineti Madhava Reddy (AMR Project)