Summary
Overview
Work History
Education
Skills
Certification
Accomplishments
Timeline
Hi, I’m

SWADESH DEY

Mechanical Engineer
Vadodara
SWADESH DEY

Summary

Assignments in Project Management with a reputed organization preferably in the Oil & Gas / Steel / Aluminum /Power Plant industry. Over 23 years of experience in Project Execution of Steel Structural, Piping and Equipment Fabrication and Erection & Inspection. Presently associated with Technip Energies (Construction) as Area Manager in a PMC role. Expertise in planning, executing, inspection and spearheading construction projects involving Contract and Site Administration & Resource Planning. Gained international exposure in the construction industry; possesses honed technical and personal skills Proficient in swiftly ramping up projects like offshore platforms with competent cross-functional skills Deft in making piping arrangement, preparing isometric drawings / Bulk MTO and conducting Nozzle orientation and equipment layout study Sound knowledge of codes, standards and regulatory guidelines that apply to design disciplines.

Overview

24
years of professional experience
4
years of post-secondary education
4
Certifications

Work History

Technip Energies India , Vadodara

Senior Manager Mechanical
2022.05 - Current (2 years & 4 months)

Job overview

Monitoring Stage wise inspection of Civil, Structure, Piping and Equipment in execution of the work for LUPECH (J-18) MS Block. (Mounded bullet) in IOCL, Baroda , Gujarat refinery.

 Review and approval of relevant documents such as Job procedures, Quality assurance plans and ITPs submitted by LSTK

contractors as per project requirement.

 Monitoring compliance with Statutory Inspection requirements.

 Review and approval of lifting plans/erection schemes for Heavy/critical lift.

 Participating the Weekly and Monthly progress review Meeting with the stake-holder and Owner for prompting corrective action, as appropriate to address safety, quality and progress issues.

 Conducting periodic Quality/Safety Audits to ensure the implementation of approved procedures/ITP.

 Checking and certification of contractor’s RA bills measurement.

Toyo Engineering India Pvt Ltd

Lead Engineer
2021.01 - Current (3 years & 8 months)

Job overview

  • Overall project management including planning, estimation, scheduling, preparation of blueprints and execution of projects for installation, commissioning & erection assignments
  • Periodic reviewing & monitoring the progress of the project with the stake-holder and end user clients for ensuring completion of project within the scheduled time and cost parameters
  • Piping Engineering
  • Studying all types of drawings (GAD, P&ID, Isometrics, Support Detail Drawings) and specification of the job in advance & listing down the scope of work
  • Managing detail designing of piping, structural and equipment works (conceptual design, detailed calculations, component selection, plan drawings, material selection, part drawing)
  • Fabrication
  • Finalizing basic & layout engineering along with design for the projects
  • Installing and commissioning as well as demonstrating the performance tests & inspections to ensure operational effectiveness of utilities
  • Erection
  • Steel Structure, Piping & Equipment erection of Greenfield area, pipe rack with existing plant
  • Provide guideline to contractor for speedy erection (sequentially) and achieve the plant target according to catch-up plan as a result, to avoid in additional cost implication
  • Heavy structure/equipment erections plan and execution co-ordination
  • Expedite the project execution work as per catch up schedule and generate the front in other discipline
  • Quality Assurance/ Safety Awareness
  • Adhering to quality standards and auditing processes to ensure compliance
  • Ensure implementation of JSA & HIRA
  • Review of HSE compliance report and recommend to comply with the procedural requirement which help to achieve safely the project completion with ZERO accident/incident
  • Role
  • Monitoring Stage wise inspection of Structure, Piping and Equipment in execution of the work for BR-09 (FCCU, AVU
  • OHCU&CRU, SRU) in IOCL, Barauni
  • Bihar
  • Review and approval of relevant documents such as Job procedures, Quality assurance plans and ITPs submitted by LSTK contractors as per project requirement
  • Monitoring compliance with Statutory Inspection requirements
  • Review and approval of lifting plans/erection schemes for Heavy/critical lift
  • Participating the Weekly and Monthly progress review Meeting with the stake-holder and Owner for prompting corrective action, as appropriate to address safety, quality and progress issues
  • Conducting periodic Quality/Safety Audits to ensure the implementation of approved procedures/ITP
  • Checking and certification of contractor’s RA bills measurement.

tkIS India pvt Ltd, Mumbai

Senior Manager
2017.09 - 2020.09 (3 years)

Job overview

  • Role
  • Monitoring Stage wise inspection of Structure, Piping and Equipment in execution of the work for NCU Expansion Projects
  • Monitoring Stage wise inspection of Structure, Piping and Equipment in execution of the work for INDMAX Project (FCCU
  • IGHDS & Mounded Bullet Units) in IOCL, BGR, Assam
  • Review and approval of relevant documents such as Job procedures, Quality assurance plans and ITPs submitted by LSTK contractors as per project requirement
  • Monitoring compliance with Statutory Inspection requirements
  • Review and approval of lifting plans/erection schemes for Heavy/critical lift
  • Participating the Weekly and Monthly progress review Meeting with the stake-holder and Owner for prompting corrective action, as appropriate to address safety, quality and progress issues
  • Conducting periodic Quality/Safety Audits to ensure the implementation of approved procedures/ITP
  • Checking and certification of contractor’s RA bills measurement.

Reliance Industries Ltd, Mumbai

Senior Manager
2013.09 - 2017.08 (3 years & 11 months)

Job overview

  • Conducted structural inspection (Fabrication/Erection), planning and project execution of Gasification, Marine, Heater, condensate & SNG structure in J3 Project at JAMNAGAR SITE
  • Mechanical lead (Structure/Piping) to ensure proper functioning of site execution work
  • Handling the HSE activities among subcontractors i.e
  • TBM & work permit issuance including JSA/STA
  • Accomplishments
  • Involved in the structural fabrication, erection & commissioning of J3 Project at Jamnagar in Gujarat
  • Essayed a crucial role in: Streamlining the procedure to control site instruction document by adding detailed sketch and latest drawing and maintaining a log of site instruction issued to subcontractor Coordinating with Field engineers to resolve issues related to engineering and erection drawings
  • Offered valuable support/ solution to fabrication problems by making detailed sketches and explaining subcontractor.

SK Engineering and Construction

Senior Structural Engineer
2012.11 - 2013.05 (6 months)

Job overview

  • Conducted structural inspection (Fabrication/Erection), planning and project execution of aromatics, reactor & condensate structure at JAC Site
  • Handling the HSE activities among subcontractors i.e
  • TBM & work permit issuance
  • Accomplishments
  • Successfully managed the fabrication, erection & commissioning of JAC Project at Jurong Island in Singapore
  • Essayed a crucial role in: Streamlining the procedure to control site instruction document by adding detailed sketch and latest drawing and maintaining a log of site instruction issued to subcontractor
  • This led in back charging subcontractor in case error is from their side Coordinating with Field engineers to resolve issues related to engineering and erection drawings Offered valuable support/ solution to fabrication problems by making detailed sketches and explaining subcontractor and client
  • Organizational Experience
  • Page 3 of 4
  • Won an appreciation letter and cash voucher for the In JAC project from the Site Manager for outstanding performance in
  • December for speedy erection of steel structure.

ThyssenKrupp India Pvt. Ltd, UHDE INDIA & NBS, Mumbai

Mechanical/Structural Manager
2011.08 - 2012.10 (1 year & 2 months)

Job overview

  • Role
  • Involved in the structural inspection and project execution of Reformer/Boiler/Pipe Rack Structure at IOCL Site
  • Managed Engineers of mechanical, electrical & instrumentation in erection, testing & commissioning of H2 Plant
  • Administered the proper installation, commission and quality of all Rotary/Static equipment as per ITP
  • Accomplishments
  • Pivotal in managing fabrication, erection & commissioning of H2 plant at IOCL (Praxair Site), Paradeep (Orissa)
  • Took vital steps to streamline procedure to control site welding procedure by educating welders and co-workers

Aker Solutions, Mumbai

Mechanical/Structural Engineer
2010.05 - 2011.01 (8 months)

Job overview

  • Conducted visual inspection of the all testing of NDT/HYDRO/PWHT/SR and welding
  • Handled the proper installation, commissioning and quality of all Rotary/Static equipment as per ITP
  • Managed the inspection of the installation and operation of D.M plant, HP, LP, & Fuel Oil Plant as per P&ID
  • Administered the erection and commission of BOILER, BALL MILL, ESP, and CHP&ASH Handling System as per ITP/QAP/FQP
  • Accomplishments
  • Pivotal in managing the Fabrication, erection and commissioning of PTFE/TFE/CMS Plant at GFL, DAHEJ Site Construction and commissioning of 210 MW Captive power plant at VAL, (3X50MW+2X30MW) Vedanta Aluminum Ltd., Lanjigarh
  • Successfully streamlined the erection procedure by making well defined work statement methods
  • Won appreciation and awards from Construction Manager on a regular basis

Alstom Projects India Ltd, Kolkata

Site in Charge
2006.07 - 2010.03 (3 years & 8 months)

Job overview

  • Role
  • Acted as a team leader for a team of 30 Engineers for successful execution of project with client’s satisfaction
  • Learnt basics of construction and fabrication industry
  • Managed the fabrication, erection and commissioning in Fume Treatment Plant, ESP, Fume Treatment Center of Anode
  • Bake & Gas Treatment Centre of Pot Room
  • Managed a team of Engineers of Civil, Mechanical, Electrical & Instrumentation in erection, testing & commissioning of FTP
  • Accomplishments
  • Pivotal in managing key projects like: Hindalco, Mahan Aluminium Project, Singrauli NALCO, Angul, Orissa Chettinad Cement, Chennai HINDALCO, Sambalpur
  • Received Performance Certificate for PG Test
  • Completed commissioning, fabrication & erection of 3 plants in Orissa & carried out Performance Guarantee Test, Involved in Lifting Plan & Safety Management
  • Instrumental in: Streamlining the erection procedure by making well defined work statement method; offered solutions for many fabrication errors Coordinating with fabricators for speedy delivery of material Generating safety awareness among fellow colleagues
  • Bagged the Best Employee Award in 2008

Subhas Projects and Marketing Ltd, Kolkata

Piping/Structural Engineer
2003.08 - 2006.04 (2 years & 8 months)

Job overview

  • Managed the fabrication and erection of Raw Water Make up System (Pipe line/Structure) for Power Plant
  • Involved in the quality job of Welding (UT, RT, & DPT of NDT Testing)
  • Accomplishments
  • Pivotal in managing project like Santaldih Thermal Power Plant, West Bengal
  • Page 4 of 4
  • Undertook measures for resolving fabrication problems by providing detailed sketches to fabricator
  • Effectively coordinated with Field engineers to resolve issues related to engineering and erection drawings
  • Won appreciation and awards from Construction Manager on a regular basis

BBJ Constructions Company Ltd, Kolkata

Mechanical/Structural Engineer
2000.01 - 2003.06 (3 years & 5 months)

Job overview

Pioneer Erectors, Kolkata

Service Engineer
1997.10 - 1999.10 (2 years)

Job overview

Education

Malda polytechnic Malda

Advanced Diploma BE Equivalent from Mechanical Engineering
1993.01 - 1997.04 (4 years & 3 months)

University Overview

Skills

MS Office, SAPundefined

Certification

SAFETY Course (BCSS) - approved by MOM in Singapore

Accomplishments

Accomplishments

    Project Management

     Overall project management including planning, estimation, scheduling, preparation of blueprints and execution of

    projects for installation, commissioning & erection assignments

     Periodic reviewing & monitoring the progress of the project with the stake-holder and end user clients for ensuring

    completion of project within the scheduled time and cost parameters

    Piping Engineering

     Studying all types of drawings (GAD, P&ID, Isometrics, Support Detail Drawings) and specification of the job in advance &

    listing down the scope of work

     Managing detail designing of piping, structural and equipment works (conceptual design, detailed calculations, component

    selection, plan drawings, material selection, part drawing)

    Fabrication

     Finalizing basic & layout engineering along with design for the projects

Timeline

Senior Manager Mechanical
Technip Energies India
2022.05 - Current (2 years & 4 months)
Lead Engineer
Toyo Engineering India Pvt Ltd
2021.01 - Current (3 years & 8 months)
Senior Manager
tkIS India pvt Ltd
2017.09 - 2020.09 (3 years)
Senior Manager
Reliance Industries Ltd
2013.09 - 2017.08 (3 years & 11 months)
Senior Structural Engineer
SK Engineering and Construction
2012.11 - 2013.05 (6 months)
Mechanical/Structural Manager
ThyssenKrupp India Pvt. Ltd, UHDE INDIA & NBS
2011.08 - 2012.10 (1 year & 2 months)
Mechanical/Structural Engineer
Aker Solutions
2010.05 - 2011.01 (8 months)
Site in Charge
Alstom Projects India Ltd
2006.07 - 2010.03 (3 years & 8 months)
Piping/Structural Engineer
Subhas Projects and Marketing Ltd
2003.08 - 2006.04 (2 years & 8 months)
Mechanical/Structural Engineer
BBJ Constructions Company Ltd
2000.01 - 2003.06 (3 years & 5 months)
Service Engineer
Pioneer Erectors
1997.10 - 1999.10 (2 years)
Malda polytechnic
Advanced Diploma BE Equivalent from Mechanical Engineering
1993.01 - 1997.04 (4 years & 3 months)
SAFETY Course (BCSS) - approved by MOM in Singapore
Certified Commissioning Engineer
Lifting Plan and Crane Safety
Languages Known : English, Bengali & Hindi
SWADESH DEYMechanical Engineer