Summary

Dynamic E&I Foreman with extensive experience at Larsen & Toubro Limited, excelling in electrical installations and safety compliance. Proven track record in project management and team leadership, ensuring high-quality standards and effective communication. Skilled in cable termination and instrumentation engineering, driving successful project outcomes in complex environments.

Overview

18
18
years of professional experience

Work History

E&I Foreman

Yamata Yatırım İnşaat Turizm ve Ticaret A.Ş.
08.2019 - Current
  • Work to permit system handled (Hot Permit, Cold Permit, Confined Space Entry, Radio grapy)
  • Pole Light Installation
  • MICS Cable Glanding & Termination
  • Power Cable & Control Cable Glanding & Termination as per Schedule
  • Electrical Cable Gladding & Termination (Electrical Cable, Instrument Cable)
  • Electrical and Instrument Panel Installation
  • Electrical and Instrument Panel Dressing & Termination
  • Electrical and Instrument Cable Loop Checking.
  • Cable Pulling as per Draing.
  • Earthing Pit & Earthing Bus Bar Installation
  • Panel Base Frame Installation
  • Panel Board Erection & Assembling Work
  • Internal Wiring for Panel Board Circuit as per Drawing
  • Welding Receptacle Installation
  • GI trucking Installation
  • Wire Pulling for Lighting and Small power Socket
  • Fire Alarm & Extinguishing system with Ionization Smoke detector, Heat detectors, Manual Break glass units with automatic Halon Extinguishing System.
  • Installation of Tray work and Conduit Work
  • Installation of Fire Alarm systems
  • Erection of Battery & Battery Charges and AC & DC UPS System
  • Electrical and Instrument Panel Installation
  • Electrical and instrument Panel Dressing & Termination
  • Electrical and instrument cable loop checking.
  • Instrument installation includes their tubing & accessories.
  • Steel Structure works for fabrication & Installation accord drawings.
  • Testing of cables for IR (Insulation resistance) test, Continuity test.
  • Measuring of Earthing resistance.

Electrical & Instrument Foreman (WSS)

HEISCO (Heavy Engineering Industries & Shipbuilding Co. K.S.C)
04.2016 - 07.2019
  • Work to permit system handled (Hot Permit, Cold Permit, Confined Space Entry, Radio Graphy)
  • Pole Light Installation
  • MICS Cable Glanding & Termination
  • Power Cable & Control Cable Glanding & Termination as per Schedule
  • Electrical Cable Gladding & Termination (Electrical Cable, Instrument Cable)
  • Electrical and Instrument Panel Installation
  • Electrical and Instrument Panel Dressing & Termination
  • Electrical and Instrument Cable Loop Checking.
  • Cable Pulling as per Drawing.
  • Earthing Pit & Earthing Bus Bar Installation
  • Panel Base Frame Installation
  • Panel Board Erection & Assembling Work
  • Internal Wiring for Panel Board Circuit as per Drawing
  • Welding Receptacle Installation
  • GI trucking Installation
  • Wire Pulling for Lighting and Small power Socket
  • Fire Alarm & Extinguishing system with Ionization Smoke detector, Heat detectors, Manual Break glass units with automatic Halon Extinguishing System.
  • Installation of Tray work and Conduit Work
  • Installation of Fire Alarm systems
  • Erection of Battery & Battery Charges and AC & DC UPS System
  • Electrical and Instrument Panel Installation
  • Electrical and instrument Panel Dressing & Termination
  • Electrical and instrument cable loop checking.

E&I Foreman

Larsen & Toubro Limited (Bangalore Metro India)
05.2012 - 08.2015
  • 11/3.3 KV and 11/0.415KV Transformer erection work
  • Cable laid work from 0.5 sq .mm to 400 sq.mm
  • Meggering for Low voltage and High voltage cables
  • HV and LV cable Glanding and termination work up to 400 sq.mm
  • Erection of HV and LV panels
  • Erection of 3.3kv and 415v switchgears, VFD LV motors, MCC, Main Distribution Board, Lighting and small power DB, Isolators and control panels
  • Cable Tray/Ladder erection work (GI, Aluminum and GRP materials are used)
  • Cable trucking work (GI GRP and PVC materials are used)
  • Conduit installation work (GI GRP and flexible conduits are used)
  • Industrial wiring for lighting and small power circuits

E&I Foreman

Petron Engineering Construction LTD.
07.2010 - 03.2012
  • 11/3.3 KV and 11/0.415KV Transformer erection work
  • Erection of LV motors
  • Cable laid work from 0.5 sq.mm to 240 sq.mm
  • Light fittings installation work as per the approved drawing
  • HV and LV cable Glanding and termination work up to 240 sq.mm
  • Erection of HV and LV panels
  • Erection of MCC 415V switch board MDB, LDB, DB and All type of Isolator
  • Testing for low voltage and high voltage cables
  • Cable Tray/Ladder erection work (GI Aluminum materials are used)
  • Cable trucking work (GI and flexible conduits are used)
  • Conduit installation work (GI and flexible conduits are used)
  • Industrial wiring for lighting and small power circuits
  • (Panipat Refinery, Village Bahuli, Panipat)

E&I Foreman

Larsen & Toubro Limited
07.2007 - 05.2010
  • Erection, Operation and Maintenance of Electrical power system Equipment as per Hazardous Area and Safety Rules and Regulation.
  • Fire Alarm & Extinguishing system with Ionization smoke detector, Heat detectors, Manual Break glass units with automatic Halon Extinguishing System.
  • Maintenance of Power Transformer up to 11KV & Control Transformer and its operating Systems.
  • Erection of Panels and Distribution Boards, Laying Glanding, Jointing and Termination of Cables up to 300 Sq mm.
  • Testing for cable (meggar and multi meter)
  • Power distribution panel, HV panel erection
  • Installation of Tray work and Conduit Work
  • Installation of Fire Alarm systems
  • Erection of Battery & Battery Charges and AC & DC UPS System
  • Cable Pulling and Termination from JB to Panel
  • Responsible for man power handled
  • Responsible for Safety maintained in the site
  • (Ballard Estate, Bombay, India)

Education

Diploma -

Electronics and Communication Engineering
01.2007

SSC -

01.2004

Skills

  • Electrical installation
  • Cable termination
  • Fire alarm systems
  • Panel erection
  • Circuit testing
  • Safety compliance
  • Project management
  • Quality assurance
  • Resource allocation
  • Site supervision
  • Problem solving
  • Team leadership
  • Effective communication
  • Training coordination
  • Equipment troubleshooting
  • PLC programming
  • Control systems
  • Material procurement
  • Electrical safety
  • Instrumentation calibration
  • Instrumentation engineering
  • Electrical engineering
  • Documentation review
  • Work order processing
  • Corrective action implementation
  • Tools and equipment maintenance

Languages

  • Hindi
  • English
  • Russian
  • Urdu

Professional Summary

More than 16 Years Experience in Oil & Gas Field (8 Years in Aboard & 8 Years in India)

Personal Information

  • Passport Number: R9961028
  • Passport Date Of Issue: 07/05/18
  • Passport Expiry Date: 06/05/28
  • Father's Name: Mr. Motiur Rahaman
  • Date of Birth: 01/01/86
  • Gender: Male
  • Marital Status: Married

Timeline

E&I Foreman

Yamata Yatırım İnşaat Turizm ve Ticaret A.Ş.
08.2019 - Current

Electrical & Instrument Foreman (WSS)

HEISCO (Heavy Engineering Industries & Shipbuilding Co. K.S.C)
04.2016 - 07.2019

E&I Foreman

Larsen & Toubro Limited (Bangalore Metro India)
05.2012 - 08.2015

E&I Foreman

Petron Engineering Construction LTD.
07.2010 - 03.2012

E&I Foreman

Larsen & Toubro Limited
07.2007 - 05.2010

Diploma -

Electronics and Communication Engineering

SSC -

UMAR FARUQUE