UMESH KUMAR S

Summary

Dynamic Project Manager with extensive experience at Floatex Solar Pvt Ltd, specializing in floating solar installations. Proven expertise in project execution and site engineering, ensuring timely delivery and compliance. Skilled in mechanical engineering and adept at resolving site disputes, driving project success through effective coordination and leadership.

Overview

9
9
years of professional experience

Work History

Project Manager

Floatex Solar Pvt Ltd
Indore
11.2024 - Current
  • As a project manager in 219MW NTPC-GVREL under DVC , Sterling and Wilson Renewable energy pvt ltd
  • Manage and oversee construction sites for both new construction and installation projects, coordinating site activities and assuring that all disciplines directly involved in the project are in phase with the project goals and objectivizes..
  • Coordinating in dropping of dead blocks in water as per given coordinates
  • Coordinating for the casting of a dead block of 10T, etc.
  • Coordinating for anchoring and mooring with the diving team to drop the blocks and hook the mooring to the perceived block.
  • Coordinating with installation team for floaters and modules installation and inspect as per drawing
  • Coordinating for laying of HT cable and HT cable mooring
  • Coordinating for spreader bar installation as per drawing
  • Inspection of all arrays as per given drawings
  • Coordinating and guiding the splicing team to splice the rope as per rope lengths after dropping the dead blocks
  • Rectify the site constraints and disputes.
  • Make sure that the material requirements are satisfied in accordance with the execution plan.
  • Work with The Design Team to Resolve Any Drawing-Related Issues.
  • Construction of ferrocement for inverter platforms
  • Preparations of barges to drop dead blocks
  • Construction of Launching Platforms for module installation
  • construction of jetty to load the dead blocks
  • Attend coordination and progress meetings; make regular trips to sites during construction including bid walks, preconstruction walks, in-progress site visits, punch walks, and construction closeout
  • Assisting Contract team in preparation of project budget and supply chain schedule.
  • Ensuring Safety and statutory compliance

Project Manager

Floatex Solar Pvt Ltd
Indore
01.2023 - 11.2024
  • As a project manager in 100 MW Floating Solar Power Plant in RAMAGUNDAM, Telangana, 25 MW Floating Solar Power Plant in Simhadri& 100MW Floating Solar Power Plant in indore
  • Assist in Creating the Project Execution Plan and Ensuring That It Is Carried Out According to Schedule.
  • Coordinating in dropping of dead blocks in water as per given coordinates
  • Coordinating for casting of dead block
  • Coordinating for Anchoring and mooring with diving team to drop the blocks and hook the mooring the perceived block.
  • Coordinating with installation team for floaters and modules installation and inspect as per drawing
  • Coordinating for laying of HT cable and HT cable mooring
  • Coordinating for spreader bar installation as per drawing
  • Inspection of all arrays as per given drawings
  • Coordinating and guiding the splicing team to splice the rope as per rope lengths after dropping the dead blocks
  • Rectify the site constrain and dispute.
  • Make sure that the material requirements are satisfied in accordance with the execution plan.
  • Work with The Design Team to Resolve Any Drawing-Related Issues.
  • Check the billing for subcontractor.
  • Follow-up the FQP and quality documents
  • SITE EXPERTISE Mechanical Array assembling of module with floats, concrete block dropping as per coordinate, check the anchoring and mooring ropes as per design length.
  • Placing and mooring the ferroement platform (IFP,L P) as per coordinate
  • Coordinating for laying of HT cable and HT cable mooring
  • Coordinating for spreader bar installation as per drawing
  • Electrical Assist the Erect Electrical Equipment Such HT (33k v&66kv) Panels, transformers, Inverters, And SCA DA.
  • Checking and witnessing Electrical pre commissioning Testing of HT Panels (Logic Test for Panel Control Circuit Meggaring for Breaker and Busbars)
  • Complete the cable laying and jointing in accordance with the drawing and the FQP, and verify and witness electrical cable checking (ac/dc)- Checking

Site incharge

Floatex Solar Pvt Ltd
Ramagundam
11.2021 - 01.2023
  • Assist in Creating the Project Execution Plan and Ensuring That It Is Carried Out According to Schedule.
  • Coordinating in dropping of dead blocks in water as per given coordinates
  • Coordinating for casting of dead block
  • Coordinating for Anchoring and mooring with diving team to drop the blocks and hook the mooring the perceived block.
  • Coordinating with installation team for floaters and modules installation and inspect as per drawing
  • Coordinating for laying of HT cable and HT cable mooring
  • Coordinating for spreader bar installation as per drawing
  • Inspection of all arrays as per given drawings
  • Coordinating and guiding the splicing team to splice the rope as per rope lengths after dropping the dead blocks
  • Rectify the site constrain and dispute.
  • Make sure that the material requirements are satisfied in accordance with the execution plan.
  • Work with The Design Team to Resolve Any Drawing-Related Issues.

Site in charge

Floatex Solar Pvt Ltd
Visakhapatnam
02.2021 - 11.2021
  • Assist in Creating the Project Execution Plan and Ensuring That It Is Carried Out According to Schedule.
  • Coordinating in dropping of dead blocks in water as per given coordinates
  • Coordinating for casting of dead block
  • Coordinating for Anchoring and mooring with diving team to drop the blocks and hook the mooring the perceived block.
  • Coordinating with installation team for floaters and modules installation and inspect as per drawing
  • Coordinating for laying of HT cable and HT cable mooring
  • Coordinating for spreader bar installation as per drawing
  • Inspection of all arrays as per given drawings
  • Coordinating and guiding the splicing team to splice the rope as per rope lengths after dropping the dead blocks
  • Rectify the site constrain and dispute.
  • Make sure that the material requirements are satisfied in accordance with the execution plan.
  • Work with The Design Team to Resolve Any Drawing-Related Issues.

Project Site Execution Supervisor

Bharath Heavy Electricals Limited
Charanka
11.2018 - 11.2019
  • Assist in Creating the Project Execution Plan and Ensuring That It Is Carried Out According to Schedule.
  • Coordinating in dropping of dead blocks in water as per given coordinates
  • Coordinating for casting of dead block
  • Coordinating for Anchoring and mooring with diving team to drop the blocks and hook the mooring the perceived block.
  • Coordinating with installation team for floaters and modules installation and inspect as per drawing
  • Coordinating for laying of HT cable and HT cable mooring
  • Coordinating for spreader bar installation as per drawing
  • Inspection of all arrays as per given drawings
  • Coordinating and guiding the splicing team to splice the rope as per rope lengths after dropping the dead blocks
  • Rectify the site constrain and dispute.
  • Make sure that the material requirements are satisfied in accordance with the execution plan.
  • Work with The Design Team to Resolve Any Drawing-Related Issues.
  • Rectify the site constrain and dispute.
  • Coordinate with customer and sub-contractor.
  • Involve in pre commissioning and commissioning activity.
  • Check the billing for subcontractor.
  • Follow-up the FQP and quality documents

Diploma Mechanical Engineer

Aeronautical Development Agency
01.2016 - 11.2018
  • Air Leakage Testing at Rig level and Aircraft level.
  • Updating of Mechanical/Electrical drawings in MM RRIG
  • Designing of Racks for rig maintenance
  • Updating all flight data and details in Enovia
  • Coordination for Ground handling Equipment for RADAR system
  • Coordination for RADAR Harmonization on LCA aircrafts
  • Installation/Removal of MMRLRU (APL,-RP, FER, TX, WG etc.) in RIG
  • Maintaining aircraft records/reports, tags etc.

Education

Diploma -

Bharath polytechnic
Bangarpet
01.2013

Skills

  • Installation of floating Plant
  • Expertise in Floating Solar
  • Project Manager in Floating
  • Site in charge
  • Project execution
  • Site engineering
  • Mechanical engineering
  • Anchoring and Mooring arrays and IFP's
  • Project management
  • Ferrocement Floating Plat forms

Languages

Tamil
First Language
English
Proficient (C2)
C2
Hindi
Advanced (C1)
C1
Telugu
Intermediate (B1)
B1

Timeline

Project Manager

Floatex Solar Pvt Ltd
11.2024 - Current

Project Manager

Floatex Solar Pvt Ltd
01.2023 - 11.2024

Site incharge

Floatex Solar Pvt Ltd
11.2021 - 01.2023

Site in charge

Floatex Solar Pvt Ltd
02.2021 - 11.2021

Project Site Execution Supervisor

Bharath Heavy Electricals Limited
11.2018 - 11.2019