Seeking an ambience where I can constantly grow,learn and deliver solutions to challenging problems.
Overview
8
8
years of professional experience
5
5
years of post-secondary education
Work History
ASSOCIATE O&M
CHS
09.2023 - Current
Company Overview: CLIENT: UNHCR, B2/16, VASANT VIHAR NEW DELHI
Responsible for running operations, vendor selections, payments etc.
CLIENT: UNHCR, B2/16, VASANT VIHAR NEW DELHI
O&M
EDF
08.2022 - 08.2023
Company Overview: CLIENT: NBPDCL
RESPONSIBLE FOR RUNNING OPERATIONS OF DARBHANGA URBAN, MEETING WITH CLIENTS
CLIENT: NBPDCL
ENGINEER
FILATEX INDIA LIMITED
06.2018 - 07.2022
Company Overview: MANUFACTURING AND SUPPLY OF POLY ETHYLENE TERPHTHALATE (PET) CHIPS, PARTIALLY ORIENTED YARN (POY), FULLY DRAWN YARN (FDY) & DRAW TEXTURED YARN (DTY)
Prepared engineering documents and planned how to complete project work successfully as per schedule.
Light, power fire alarm designing with panel cable routing equipment location.
Load calculation selection of electrical panels as per loads including XLPE/PVC armour rubber & clear flex cables size gland size, lug size, MCB, MCCB, ELCB, RCCB (RCD) & IP rating.
Installation, testing & commissioning of electrical panels, D.G. sets (1250 & 1000 KVA), motor with starter, cable tray & trunking, cable laying & termination, meager & continuity test.
Selection of equipment.
Determine procedures for installation, modification & repair of electrical assignments.
Maintenance of electrical equipments like motors, air compressors etc.
Transformer and system protection through relays such as over current relay, over voltage relay, under voltage relay, earth fault relay, bus bar protection relay, phase sequence relay.
Earthing and lightning protection design based on the regulation.
To carry out inspection of electrical work.
Report all matter related to quality to the Senior Manager on daily basis.
Technical know how in erection, commissioning for village electrification.
Preparation of handover documents.
Preparation of MRHOV (material received and handover voucher).
Erection of HT (11 KV) & LT Lines, Installation of 25KVA, 63 KVA Distribution Transformers.
Replacement of existing conductor by ASCR Rabbit conductor 55 sq.mm on existing WEASEL Conductor by AB Cable, Shifting of existing 11/.433kv Three phase Distribution transformer as per load.
Installation of APL Meter And BPL Meter.
Feeder separation for agricultural purpose.
Managing the execution with safety precautions on site as pole erection, stringing, installation of transformer, distribution box, consumer energy meter etc.
Preparation of SLD of HT and LT Lines.
Exposure in providing technical support to the field staff and coordinating with client & vendors.
Survey of HT Line (11 kv) & LT Line.
Installation of free meter connection for new APL & BPL Consumer.