Summary
Overview
Work History
Education
Skills
Personal Information
Languages
Hobbies
Languages
Timeline
Generic

MOHIT KUMAR SRIVASTAVA

Chandrapur

Summary

Dynamic mechanical maintenance manager with a proven track record at ACC Ltd., excelling in operations optimization and equipment reliability. Achieved a remarkable reduction in power consumption while leading a team to enhance safety compliance. Skilled in root cause analysis and effective communication, driving continuous improvement in high-performance environments.

Overview

2
2
Languages
19
19
years of professional experience

Work History

Section Head-Packing plant

ACC Ltd. (Adani Cement)-
Chandrapur
09.2024 - Current
  • Supported cement dispatch operations, improving distribution flow and maintaining safe packaging and dispatch practices.
  • Helped direct team of over 300 personnel in cement dispatch, handling average daily movement of over 8000+ tons by rail and road to meet customer demand.
  • Coordinated with logistics and cement grinding teams to keep operations aligned with monthly dispatch target of approximately 2.3 lac tons.
  • Maintained strong safety focus, delivering 100% safe loading and packing for over 8000+ tons of cement daily across blended cement products, with zero accidents.
  • Applied RCA findings and team brainstorming inputs to modify weigh loading machines, belt conveyors, and discharge chutes, improving process efficiency.
  • Supported maintenance and operation of rotary packers and auxiliaries to keep output reliable and reduce machinery downtime.
  • Managed packing plant operation and maintenance, and also oversaw old ball mill maintenance, separator replacement with separator seal, 5 ton/hrs output increase, and resolution of nibs issue with zero nibs after correction.
  • Managed complete AFR circuit operation and maintenance from yard to calciner inlet as per management direction.
  • Achieved ever-highest TSR of 23% at kiln output of 7500 TPD.
  • Achieved ever-highest AFR monthly consumption of 20000 tons through successful transition from plant manpower to SLA service lean agreement.

Mechanical Maintenance Manager

ADANI ACC LIMITED
Lakheri
05.2017 - 09.2024
  • Supported kiln operation for 3200 TPD ABL line, coal mill EMill 10.9 Alstom, and CHP circuit to maintain smooth production flow.
  • Completed cooler changeover from mechanical drive cooler to hydraulic drive cooler in safe coordination with M/s Fons.
  • Modified TAD duct routing from cooler exhaust to coal mill inlet to improve plant performance.
  • Handled workshop and utility section duties in close coordination with plant team.
  • Reduced daily power use from 22000 kWh to 9000 kWh through air leakage control and installation of high-efficiency compressor.
  • Completed 1.5 km water pipeline from mines pit to plant raw water tank in 10 days and reduced main water pump running hours from 14 to 6.
  • Supported raw mill section and limestone crusher operations and received best department award during HSMS audit.
  • Managed spare parts inventory through review of historical trends and demand patterns to keep critical items available.
  • Led mechanical maintenance team activities to improve equipment reliability.
  • Resolved mechanical system issues through troubleshooting and corrective action.
  • Planned and executed cooler replacement from mechanical drive to hydraulic drive with close coordination from M/s Fons, maintaining safe work practices.

Project lead- Lime Stone Crushing System

Shree Cement Limited
Gulbarga
08.2016 - 05.2017
  • Coordinated planning, drawing review, site inspection, and drawing control to maintain safe, smooth limestone crushing circuit operation and support on-time site and project delivery.
    Managed complete crushing circuit project with impact crusher (1450 tph) followed by hammer crusher, make: L&T, from execution through completion.
  • Developed project plans and schedules to manage resource allocation efficiently.
  • Reviewed project documentation for accuracy and completeness consistently.
  • Ensured compliance with established policies, procedures and standards within the project scope.

Kiln Section Head(Planning & Execution)

JAYPEE CEMENT LIMITED
SIDHI
07.2010 - 08.2016
  • Primarily responsible for planning and executing operations of Kiln section to ensure seamless production. Looked after the Kiln-1 (4500 TPD: Make L&T) & KIln-2(5000 TPD: Make FLS) circuit ensuring streamlined operational efficiency.
  • Executed the job of Duplex Burner to Swirlex burner replacement with L&T team involvement maintaining safety and quality standards.
  • Conducted routine measurements of the Rotary kiln with Girth gear teeth flank temperature, Creep ,Roller Thrust measurement and inhouse rectification. Shell runout with dial guage/digital diagnostic accuracy.
  • Tasked with replacing the old burner pipe by installing the low NOX & high efficiency Swirlex Burner Pipe

Achievements:

  • Involved in the kiln shell replacement job (8 mtr * 4.35 dia) within the project duration adhering to safety measures.
  • Minimized jam removal efforts by executing the project of modification of preheater feed pipe angle.

Engineer

JAYPEE CEMENT LIMITED
SIDHI
01.2008 - 07.2010
  • Supported timely completion of erection and installation activities for coal handling plant, meeting safety requirements and schedule targets.
  • Handled full maintenance tasks after completion, including preventive maintenance, corrective maintenance, and daily operation of coal handling circuit.
  • Completed erection and commissioning of 180 TPH cement mill safely and managed daily maintenance activities.
  • Recorded engineering activities in line with established procedures.
  • Maintained critical spare availability through proper spare planning and team coordination.
  • Carried out testing to verify functionality and support optimization.
  • Supported preventive and corrective maintenance for pyro section, covering 2 kilns from blending silo extraction to silo discharge.
  • Improved kiln net availability up to 92-93% through daily inspections, burner condition checks, cooler-grate upkeep, kiln roller thrust measurement, and close coordination with process and DCS teams, while reducing specific heat consumption and improving clinker quality consistency.
  • Calibrated scientific or technical equipment.

Education

B.Tech. - Mechanical Engineering

G.L.A.institute of Technology & Management
Mathura
06-2007

Skills

  • Mechanical Maintenance
  • Preventive Maintenance
  • Predictive Maintenance
  • Root Cause Analysis
  • Equipment Reliability
  • SAP PM
  • SAP MM
  • Project Commissioning
  • Shutdown Management
  • Leadership
  • Communication
  • Problem-solving
  • Teamwork
  • Adaptability
  • Maintenance Management
  • Operations Optimization
  • Safety Compliance
  • Cost Control

Personal Information

  • Title: Mechanical maintenance manager
  • Date of Birth: 1985-06-15

Languages

English, Hindi

Hobbies

 Reading,Traveling,Singing

Languages

English
Proficient (C2)
C2
Hindi
Proficient (C2)
C2

Timeline

Section Head-Packing plant

ACC Ltd. (Adani Cement)-
09.2024 - Current

Mechanical Maintenance Manager

ADANI ACC LIMITED
05.2017 - 09.2024

Project lead- Lime Stone Crushing System

Shree Cement Limited
08.2016 - 05.2017

Kiln Section Head(Planning & Execution)

JAYPEE CEMENT LIMITED
07.2010 - 08.2016

Engineer

JAYPEE CEMENT LIMITED
01.2008 - 07.2010

B.Tech. - Mechanical Engineering

G.L.A.institute of Technology & Management
MOHIT KUMAR SRIVASTAVA