Summary
Overview
Work History
Education
Skills
Technicalskills
Valuetoemployer
References
Personal Information
Software
Timeline
Generic
VINEET PUNGHANIA

VINEET PUNGHANIA

Electrical Manager
Ambala

Summary

Seeking Managerial/ Engineering Assignments for Tunnel/ TBM / Power Plant Setup / Maintenance/ Procurement, while integrating technical expertise and leadership skills that drives organizational performance to world-class levels. Detail-oriented, organized, and meticulous employee. Works at fast pace to meet tight deadlines. Enthusiastic team player ready to contribute to company success. Competent Engineering professional offering foundation in engineering project management and design. History of success in performing load and cost calculations and establishing clear parameters. Detail-oriented with strong knowledge of [Area of expertise] and [Software].

Overview

18
18
years of professional experience
2006
2006
years of post-secondary education
2
2
Languages

Work History

Engineer

NISHIMATSU CONSTRUCTION CO. LTD
  • (Electrical manager) in site management, troubleshooting of Single Shield Hard Rock TBM S1309A and S1310A of Herrenknecht make, 9.1 mtrs dia
  • Cordinated with H+E and responsible for Electrical Installation, testing and commissioning of tunnel and cross belt conveyors
  • Maintained TBM, Gantry crane, Grout Plant and Conveyor belt spares.

Electrical Engineer

TBM
  • For refurbishment, service, troubleshooting and maintenance of Terratec S-71 and S-72 EPB, ’s, 6.61 mtrs dia
  • Equipped with Mitsubishi Q series
  • GLOBAL

PLC

Herrenknecht Services, TBM Tube, KEY
  • AG
  • PROJECT BRIEF:
  • Site location: Ipoh, Electrician for refurbishment, service, troubleshooting and maintenance of STP, Slurry TBM.

PLC

TBM Tube Tunnel
  • Extent
  • KEY RESPONSIBILITIES, Electrician for troubleshooting and maintenance of S1038 and S1039 EPB TBM’s make-Herrenknecht
  • Dia
  • 6.8mtrs EPB TBM.

WABCO MANUFACTURING UNIT
  • Volvo, Ashok Leyland, Tata Motors, Eicher, Mahindra and Mahindra
  • PRODUCTS BRIEF:
  • Manufacturer and supplier of spares, Brakes and clutches for commercial vehicles
  • Manufacturing of ABS (Anti-Lock Braking System) after Govt
  • Of India made it mandatory in 2015 for type M3 and N3 commercial vehicles
  • KEY RESPONSIBILITIES
  • Troubleshooting and maintenance of 0.415/11 KV 500 KVA substation and 250 KVA DG sets
  • Programming and troubleshooting of Mitsubishi and Omron Programmable Logic Controller installed on individual machines
  • Responsible for commissioning and maintenance for Class Four safety systems in different units
  • Trouble shooting of all electrical Control System related problems during operation and maintenance.

DMRC, Delhi Metro Rail Corporation
  • Site location: Chelmsford Club, Janpath, Mandi House
  • Project costs 4.67 Billion INR
  • TBM Twin Tube Tunnel extent- 2.1 kms
  • KEY RESPONSIBILITIES
  • Managed site activities for supplying required power to TBM through synchronized 5 no
  • DG sets of 1010 KVA (make- Sudhir Gensets), thereby aiding the production of Tunnel
  • Erection, commissioning, troubleshooting of all allied equipments from generators to 2.5 MVA step-up Transformers to 6.6KV Switchgear to TBM
  • Executed erection, testing, commissioning, electrical maintenance & troubleshooting of 6.6 mtrs Dia
  • TBM (Tunnel Boring Machine- make HERRENKNECHT), type-EPB, S-723 and S-724 equipped with and controlled by PLC S7 300 of SIEMENS.

RESPONSBILITIES

KV DISTRIBUTION SUBSTATION
  • Checking and maintenance of proper operations of all relays (over current, under voltage, master trip, and earth fault) meant for 11 KV output feeders
  • Checking Insulation Resistance of 66 KV Line insulators with insulation testing instruments
  • Maintenance of 11 KV VCB’s and checking of tripping and reloading mechanisms
  • Maintenance and testing of 11 KV CT’s and PT’s
  • Checking and Maintenance of Earth resistance inside substation.

Electrical Manager

Larsen & Toubro Pvt Limited
12.2022 - Current
  • Served as a technical expert on complex electrical issues, advising colleagues and clients on best practices and troubleshooting techniques.
  • Collaborated with other managers to develop comprehensive project plans, ensuring smooth communication and coordination across departments.
  • Reduced equipment downtime by establishing effective preventive maintenance programs for all electrical systems.
  • Maintained accurate records of all project-related documentation, facilitating easy access to information when needed.

Electrical Manager

LARSEN AND TOUBRO PVT. LTD, Rail VIKAS NIGAM LIMITED
12.2022 - Current
  • Project Planning & Management
  • Managing overall operations for executing projects related to maintenance, erection & commissioning within cost & time parameters
  • Monitoring projects with respect to projecting budgeting demand forecasts & involved in preparing fund flow statement to ensure timely execution of projects
  • Proficient in documentation of Electrical Method statements, include risk assessments of Electrical substation setup, setting and following Safety norms
  • Operation & Maintenance
  • Planning and effecting routine / predictive / preventive / corrective overhauling maintenance schedules of Plant / underground tunneling equipment to increase machine up time and reliability
  • Proactively identify areas of obstruction / defects and conducting root cause analysis/ failure mode & effect analysis to rectify the equipments
  • Coordinating material / spare parts planning encompassing identification of vendors, requirement specification & offer evaluation
  • Construction Management
  • Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output
  • Reviewing engineering drawings, technical specifications, cost estimates for change orders, review
  • Inspecting field sites to observe and evaluate condition and operability of facilities and structures, and to collect field survey data and measurements
  • Erection & Commissioning
  • Installation and commissioning of various equipments as well as conducting tests & inspections to ensure operational effectiveness
  • Reviewing engineering drawings, technical specifications, cost estimates for installation & commissioning of the equipment; reviewing & analyzing contractor's change order proposals & submittals
  • Conducting toolbox meetings with subordinates for identifying methods of completing tasks with safety
  • Coordinating material / spare parts planning related activities encompassing identification of vendors, requirement specification & offer evaluation
  • Man Management
  • Directing, leading and motivating workforce; imparting continuous on job training for accomplishing greater operational effectiveness / efficiency
  • Working on succession planning of the workforce, shift management activities, appraising the member’s performance & providing feedback
  • PROJECT BRIEF:RVNL04
  • Site location: P1 Portal, TBM1 Drive (S1309A) P1 Portal, TBM2 Drive (S1310A)
  • Project Cost: INR 33 Billion
  • Twin Tube TBM Tunnel extent: 10.5 Kms.

Senior Electrical Engineer

Public Utilities Board
03.2022 - 12.2022
  • (PUB), Deep Tunnel Sewerage System (DTSS), Phase2
  • PROJECT BRIEF:T10
  • Site location: TBM1 Drive (S1164) TBM2 Drive (S1165) TBM3 Drive
  • Project Cost: SGD 340 Millions
  • TBM Tunnel extent: 8 Kms
  • Lead responsibility as Sr
  • Electrical Engineer in site management, troubleshooting of Slurry TBM1 S1164, of Herrenknecht make, 7.5 mtrs dia and TBM2 S1165, of herrenknecht make, 5.3 mtrs dia
  • Together with Slurry Treatment Plants and Filter press
  • Editing and modification of Herrenknecht PLC programme to minimize/ identify TBM faults during normal operations
  • Plan and execution of Tunnel LV Power setup and tunnel lightings.Organize electrical manpower, planning and executing site activities

Senior Electrical Engineer

PENTA-OCEAN CONSTRUCTION COMPANY LTD, KOH
04.2019 - 12.2021
  • Public Utilities Board (PUB), Deep Tunnel Sewerage System (DTSS), Phase2
  • PROJECT BRIEF:T08
  • Site location: TBM Drive name Buroh (M2284) from P2 to V1, along Pioneer Road TBM Drive name Benoi (M2283) from V3 to V1, along Pioneer Road TBM Drive name Tuas (S1160) from Z to W, under sea TBM Drive name Pioneer (S1161) from Zi to V3, under sea
  • Project Cost: SGD 520 Millions
  • TBM Tunnel extent: 10 Kms
  • KEY RESPONSIBILITIES
  • Lead responsibility as Sr
  • Electrical Engineer in Testing, commissioning and troubleshooting of Slurry TBM Tuas S1160, of Herrenknecht make, 7.5 mtrs dia and TBM Pioneer S1161, of herrenknecht make, 5.3 mtrs dia
  • Together with Slurry Treatment Plants R061 of capacity 900m3/hr and R064 of capacity 700m3/hr
  • Editing and modification of Herrenknecht PLC programme to minimize/ identify TBM faults during normal operations
  • Testing, commissioning and maintenance of Allied equipments like cooling tower, Compressor plant 110KW, 17.5m3/min x 5 nos
  • Lead the setup for Tunnel communication system, Emergency Fire call points and maintain/ rectify communication issues
  • Setup, Testing, commissioning and troubleshooting of PLC communication between TBM, Slurry/ booster pumps, STP plants and Slurry/Feed Density & Feed flow meters
  • Plan and execution of Tunnel LV Power setup and tunnel lightings
  • Organize electrical manpower, planning and executing site activities.

PLC Electrical Engineer

LARSEN & TOUBRO
04.2018 - 03.2019
  • MEGA Package 2- Metro link for Gandhinagar to Ahmedabad
  • PROJECT BRIEF:
  • Site location: Kalupur, Ghee kata, Shahpur
  • Project Cost: INR 901 Crore
  • TBM Twin Tube Tunnel Extent: 4.2 kms

GAMUDA MMC METRO LINE
10.2017 - 12.2017

PLC Electrician

TBM
07.2017 - 12.2017

CHENGDU METRO LINE, Tunneling Equipment Co. Ltd
07.2006 - 07.2017

PLC Electrical Engineer

WABCO INDIA LTD
06.2016 - 07.2017

PLC Engineer

IPS POWERFUL PEOPLE, TBM, BANGALORE METRO RAIL PROJECTS, Bangalore
03.2016 - 05.2016
  • Metro Rail Corporation)
  • PROJECT BRIEF:
  • Site location: Seshadripuram, Majestic station
  • TBM Tube Tunnel extent- 960 mtrs
  • KEY RESPONSIBILITIES
  • Troubleshooting and maintenance for 6.4 mtrs Earth Pressure Balance (EPB) (SELI-Italy), model- KAWASAKi EPB 0643.140
  • Programming of AB SLC 05 Programmable Logic Controller
  • Interface Modules, Communication Processors, Operator Panels (OP), Touch Panels (TP)
  • Communication between Programmable logic controller (PLC) to Information Monitoring Modules (IM)
  • Communication Processors (CP), Operator Panel (OP), Touch Panel (TP), Human Machine Interface (HMI) and Variable Frequency Drives (VFD)
  • Responsible for commissioning and maintenance for Class Four safety systems in the Machine
  • Trouble shooting of all electrical Control System related problems during operation and maintenance.

Electrical Engineer TBM

ALYSJ JV
10.2014 - 03.2016
  • QATAR RAIL PROJECTS- Goldline Metro
  • CLIENT: Qatar Rail Projects
  • PROJECT BRIEF:
  • Site location: Airport city North, Al Sharq, Doha Souq, Mushereib, Bin Mahmoud, Cring, Al Sadd, Al Sadd Stadium, Alwaab City, Sports City, Villagio
  • Project costs 15.29 Billion QAR
  • TBM Twin Tube Tunnel extent- 13.6 kms
  • KEY RESPONSIBILITIES
  • Prepared Method statements for Electrical Power Plant setup for TBM Launching Shafts, Safe procedure for MV cable extension, responsibilities of Electrical Engineer and Superintendent during work procedures to ensure safety of personal and equipments
  • Visited Germany, Schwanau for factory acceptance of 6 nos
  • Identical EPB TBM’s
  • Erecting and assembly work for 6.83 mtrs Earth Pressure Balance (EPB) (HERRENKNECHT-Germany), S-920, S-921, S-922, S-923, S-924, S-925
  • Calculated cable sizing, Developed Power distribution Panels Design, 24VDC Starter Panels Design, Fault Current Calculation for 20KV MV cable designs and LV distribution for site setup meeting Qatar electrical regulatory authority requirements
  • Modified PLC programme for Grout Panels reset quantity of TBM’s, discussed and got modified Programme for Vacuum of Erector
  • Responsible for Planning and executing, Preventive, Predictive and Break Down Schedules, Inventory Management including Inspection, Assembly/Dismantling, selection of machinery with Layout and Arrangement of Substation and DG sets systematic according to Engineering Drawings
  • Supervised set-up of electrical Sub Station of 20KV for energizing the machine and supporting systems and equipments
  • Vital role in electrical Installation of H+E Tunnel Conveyors, Testing, Commissioning and troubleshooting once in operations
  • Siemens S7-300, S7-400 Programmable Logic Controllers
  • Responsible for electrical Installation, Testing and Commissioning of surface equipments like Grout Plant (Make -Lorenzetto), Cooling Tower (Make - Herrenknecht), Water Treatment Plant
  • Interface Modules, Communication Processors, Operator Panels (OP), Touch Panels (TP)
  • Communication between Programmable logic controller (PLC) to Information Monitoring Modules (IM)
  • Communication Processors (CP), Operator Panel (OP), Touch Panel (TP), Human Machine Interface (HMI) and Variable Frequency Drives (VFD)
  • Responsible for commissioning and maintenance for Class Four safety systems in the Machine
  • Trouble shooting all Control System related problems in erection, assembly, operation and maintenance.

Senior Electrical Engineer TBM

CEC-CICI JV, DMRC PROJECT CC, DMRC, Delhi Metro Rail
11.2013 - 09.2014
  • Site location: Azadpur, Shalimar Bagh, Mukundpur
  • Project costs 4.5 Billion INR
  • TBM Twin Tube Tunnel extent- 2.5 kms
  • KEY RESPONSIBILITIES
  • Erecting and assembly work for Earth Pressure Balance (EPB) (HERRENKNECHT-Germany), S-780 and S-781 and Double Shield Hard Rock Tunnel Boring machines (ROBBIN – USA) (Totally Integrated Automation System operation)
  • Responsible for 11KV substation installation and fault analysis for meeting tunneling standards of BS6164:2011
  • Responsible for Planning and executing, Preventive, Predictive and Break Down Schedules, Inventory Management including Inspection, Assembly/Dismantling, selection of machinery with Layout and Arrangement of Substation and DG sets systematic according to Engineering Drawings
  • Conceptualized synchronization of two different panels for saving Kilolitres of Diesel
  • Originated and Developed PLC Programme for using overcutter as copy cutter in S780 and S781 TBM
  • Set-up of 11KV electrical Sub Station for energizing the machine and supporting systems and equipments
  • Throughout Refurbishment for old machines, Power Up gradation with control system design, Machine Control system modification PLC programming as per new application based system changes, commissioning and launching of the same
  • Specialized in Step7 programming and worked on Wincc flexible (for HMI’S)
  • Language known Ladder Language (LAD), Functional Block Language (FBD) and Statement List Language (STL)
  • Siemens S7-300, S7-400 Programmable Logic Controllers
  • Interface Modules, Communication Processors, Operator Panels (OP), Touch Panels (TP)
  • Communication between Programmable logic controller (PLC) to Information Monitoring Modules (IM)
  • Communication Processors (CP), Operator Panel (OP), Touch Panel (TP), Human Machine Interface (HMI) and Variable Frequency Drives (VFD)
  • Communication between Programmable logic controllers (PLC) to Programmable logic controller (PLC)
  • Configuring Simatic H system
  • Controlling and changing the system program as per requirements
  • Responsible for commissioning and maintenance for Class Four safety systems in the Machine
  • Trouble shooting all Control System related problems in erection, assembly, operation and maintenance.

Senior Electrical Engineer TBM

FEMC PRATIBHA INDUSTRIES LTD JV, DMRC PROJECT, DMRC, Delhi Metro Rail Corporation
07.2013 - 11.2013
  • Site location: Kalkaji, Nehru Place, Chirag Delhi, Panchsheel, Hauz khas
  • Project costs 11.34 Billion INR
  • TBM Twin Tube Tunnel extent- 4 kms
  • KEY RESPONSIBILITIES
  • Coordinated manpower for site activities and electrical generation system
  • Planned for setting 6.6 KV substation for supplying required power to TBM through synchronized 5 no
  • DG sets of 1010 KVA (make- Sudhir Gensets), thereby aiding the production of Tunnel
  • Guided, Instructed and Set Goals for Erection, commissioning, troubleshooting of all allied electrical equipments from generators to 2.5 MVA step-up Transformers to 6.6KV Switchgear
  • Programmed and Handled erection, testing, commissioning, electrical maintenance & troubleshooting of 6.5 mtrs Dia
  • TBM (Tunnel Boring Machine- make HUBEI TIANDI HEAVY INDUSTRIES), type-EPB equipped with and controlled by PLC Mitsubishi
  • Responsible for Safe, efficient, trouble free operation and maintenance of various equipments as a Safety Volunteer in Company
  • Planned, designed, executed, procurement, updated and changed design in Engineering Drawings and final billing for the electrical goods and all other works related with client as per BOQ.

Senior Electrical Engineer TBM

PRATIBHA INDUSTRIES LTD, DMRC PROJECT CC
01.2012 - 07.2013
  • (Extension of Violet Line

Electrical Engineer TBM

ROBBINS TUNNELLING and TRENCHLESS INDIA PVT. LTD, CPL, Coastal Projects Ltd
09.2010 - 01.2012
  • Sleemanabad, Madhya Pradesh
  • Project costs 8 Billion INR
  • TBM Tunnel extent- 12 kms
  • KEY RESPONSIBILITIES
  • Supervised and troubleshoot electrical power flow for TBM operations and leading manpower
  • Modified Electrical Drawings for profibus communication installations
  • Handling erection, testing, commissioning, electrical maintenance & troubleshooting of 10 mtrs Dia
  • TBM (Tunnel Boring Machine- make ROBBINS), type-HYBRID (EPB+HARD ROCK) equipped with and controlled by PLC GE FANUC
  • Learnt synchronized functions of TBM for operations.

Electrical Engineer

ALPINE SAMSUNG HCC JV, AIRPORT METRO EXPRESS LINE, DMRC, Delhi Metro Rail Corporation Ltd
03.2008 - 09.2010
  • PROJECT BRIEF:
  • Project costs 7.7 Billion INR
  • Total extent of Tunnel- 3.2 kms
  • TBM Twin Tube Tunnel extent- 2.1 kms
  • Cut and Cover Tunnel extent- 1.1 kms
  • KEY RESPONSIBILITIES
  • Controlling and troubleshooting electrical power flow throughout site and leading manpower operations
  • Performed commissioning, electrical maintenance & troubleshooting of 6.61 and 6.58 mtrs Dia
  • TBM (Tunnel Boring Machine- make Herrenknecht), EPB (Earth Pressure Balance) equipped with and controlled by PLC S7 400, and allied equipments including 1010 KVA DG sets, synchronizing panel, 6.6/0.415 KV and 0.415/6.6 KV transformers, HT breakers, 32/25 tons Gantry Cranes, three-phase induction motors, circuit breakers, relays and their control circuits
  • Succeeded in commissioning, operation, electrical maintenance & troubleshooting of 60 m3/hr Batching Plant (make- Aquarius) along with its scheduled calibration, 20 TPD Ice Plant (make- EU industries ltd.), 160 TPH Chilling Water Plant (make- EU industries ltd.), 8000 LPH Reverse Osmosis Water Treatment Plant (make- S
  • R
  • Paryavaran Engineers pvt
  • Ltd.), 30 TPH Cement Feeding Plant (make- NMF Equipments ltd.).

Maintenance Engineer

HARYANA VIDYUT PRASARAN NIGAM LTD
02.2007 - 02.2008

Education

B.E. - Electrical

C.R. State College of Engineering
Murthal, Sonepat

12th - undefined

Bhartiya Public School

10th - undefined

Bhartiya Public School

Skills

TBM PLC

Technicalskills

Herrenknecht, Robbins, THI, Kawasaki, Terratec, ABB, Siemens, Mitsubishi, Eaton-Cutler Hammer, Yasakawa, Schnieder, Sudhir, Caterpillar, Jackson, Kirloskar, Telemecanique, Siemens, ABB, Moeller, Telemecanique, Siemens, ABB, Moeller, Demag, ABB, Siemens, Demag, Alpha, AP Industries, Reva, WMI, Hi-Tech, Mody, Tsurumi, Grundfos

Valuetoemployer

  • Proven abilities in analyzing and interpreting unique problems.
  • A resourceful decision-maker that combines strong leadership and organizational skills.
  • Accept additional responsibilities without previous experience and learning new skills quickly.
  • Proven Abilities to find and rectify electrical faults quickly.
  • Good at studying, and making changes in Electrical Drawings.
  • Proven abilities in executing energy saving & other cost saving measures.
  • Comprehensive experience in planning & implementing preventive & predictive maintenance schedules.
  • An expert in identifying areas of obstruction/ breakdowns and taking steps to rectify the equipments.

References

  • Mr. Noboru Inoashi, Senior Project Manager, Penta Ocean Singapore, Whatsapp only: +65-96605978
  • Mr. Christopher John Hull, Senior Manager (M&E) Tunneling, Penta Ocean Singapore, HP: +65-82846838
  • Mr. Shigeo Kawasaki, M&E Manager, Penta Ocean Singapore, HP: +65-97228507
  • Mr. Santiago Alvarez Beneitez, Project Manager, Herrenknecht Singapore, HP: +65-85334134

Personal Information

  • Passport Number: U0800976
  • Father's Name: Late Mr. Gian Chand
  • Date of Birth: 10/01/83
  • Marital Status: Married

Software

PLC of Siemens TIA Portal17, Simatic Manager etc

Timeline

Electrical Manager

Larsen & Toubro Pvt Limited
12.2022 - Current

Electrical Manager

LARSEN AND TOUBRO PVT. LTD, Rail VIKAS NIGAM LIMITED
12.2022 - Current

Senior Electrical Engineer

Public Utilities Board
03.2022 - 12.2022

Senior Electrical Engineer

PENTA-OCEAN CONSTRUCTION COMPANY LTD, KOH
04.2019 - 12.2021

PLC Electrical Engineer

LARSEN & TOUBRO
04.2018 - 03.2019

GAMUDA MMC METRO LINE
10.2017 - 12.2017

PLC Electrician

TBM
07.2017 - 12.2017

PLC Electrical Engineer

WABCO INDIA LTD
06.2016 - 07.2017

PLC Engineer

IPS POWERFUL PEOPLE, TBM, BANGALORE METRO RAIL PROJECTS, Bangalore
03.2016 - 05.2016

Electrical Engineer TBM

ALYSJ JV
10.2014 - 03.2016

Senior Electrical Engineer TBM

CEC-CICI JV, DMRC PROJECT CC, DMRC, Delhi Metro Rail
11.2013 - 09.2014

Senior Electrical Engineer TBM

FEMC PRATIBHA INDUSTRIES LTD JV, DMRC PROJECT, DMRC, Delhi Metro Rail Corporation
07.2013 - 11.2013

Senior Electrical Engineer TBM

PRATIBHA INDUSTRIES LTD, DMRC PROJECT CC
01.2012 - 07.2013

Electrical Engineer TBM

ROBBINS TUNNELLING and TRENCHLESS INDIA PVT. LTD, CPL, Coastal Projects Ltd
09.2010 - 01.2012

Electrical Engineer

ALPINE SAMSUNG HCC JV, AIRPORT METRO EXPRESS LINE, DMRC, Delhi Metro Rail Corporation Ltd
03.2008 - 09.2010

Maintenance Engineer

HARYANA VIDYUT PRASARAN NIGAM LTD
02.2007 - 02.2008

CHENGDU METRO LINE, Tunneling Equipment Co. Ltd
07.2006 - 07.2017

Engineer

NISHIMATSU CONSTRUCTION CO. LTD

Electrical Engineer

TBM

PLC

Herrenknecht Services, TBM Tube, KEY

PLC

TBM Tube Tunnel

WABCO MANUFACTURING UNIT

DMRC, Delhi Metro Rail Corporation

RESPONSBILITIES

KV DISTRIBUTION SUBSTATION

12th - undefined

Bhartiya Public School

10th - undefined

Bhartiya Public School

B.E. - Electrical

C.R. State College of Engineering
VINEET PUNGHANIAElectrical Manager