Summary
Overview
Work History
Education
Skills
Citizenship
Training Licenses Certificates
Countries Worked
Types Of Wells Worked
Drilling Fluid Systems Worked
Problems Encountered
Wells Worked
General Information
Timeline
Generic

Vishal Sawant

Project Manager - Sales

Summary

Talented professional considered knowledgeable leader and dedicated problem solver. Brings 20 years of valuable expertise to forward company objectives. Attentive to detail with experience in coordinating projects, programs and improvements.

Overview

21
21
years of professional experience
3
3
Language

Work History

PROJECT MANAGER - SALES

NEWPARK DRILLING FLUIDS INDIA
Mumbai , Maharashtra
Oct.2021 - Current
  • Visit client office for one to one discussion and presentation.
  • Train other employees on how to repair damaged mat.
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Excellent communication skills, both verbal and written.
  • Reported regularly to managers on project budget, progress, and technical problems.
  • Delivered services to customer locations within specific timeframes.
  • Proven ability to learn quickly and adapt to new situations.

QA Tester

NEWPARK DRILLING FLUIDS INDIA
Mumbai , Maharashtra
05.2020 - 02.2024
  • Identified critical bugs and worked closely with developers to ensure timely resolution, resulting in a more stable product.
  • Wrote and optimized test cases to maximize success of manual software testing with consistent, thorough approaches.
  • Enhanced product reliability through thorough functional, regression, and performance testing.
  • Designed testing scenarios for usability testing.
  • Optimized test cases to maximize success of manual software testing.
  • Conducted regression testing, analyzed results, and submitted observations to development team.
  • Assisted in troubleshooting technical issues encountered during the deployment of new software releases.
  • Participated in available trainings to improve software knowledge.
  • Documented testing procedures for developers and future testing use.

PROJECT ENGINEER - SALES

NEWPARK DRILLING FLUIDS INDIA
Mumbai , Maharashtra
Jan.2018 - Sep.2021
  • Travel to multiple locations to conduct site survey for mats installation.
  • Give on job training for installing mats as per clients requirement.
  • Visit client office for one to one discussion and presentation.

PROJECT ENGINEER -SOLIDS CONTROL

NEWPARK DRILLING FLUIDS INDIA
Mumbai , Maharashtra
Mar.2014 - Dec.2017
  • Conduct rig Surveys for the installation of Solids Control Equipment and associated equipment.
  • Plan equipment for installation, service and organize initial set-up for next job.
  • Instruct the engineers to run the equipment (centrifuges/ cuttings dryer). Servicing, troubleshooting, installations, etc. of equipment and systems as required.
  • Perform pre & post job equipment inspections; perform and complete preventative maintenance procedures and operate centrifuges & other support equipment.
  • Travel to rig site locations or clients office as per the requirement.
  • Ability to react based on Customer needs and Safe Work Practices.
  • Give presentation and attend client meetings from time to time.
  • Prepare engg. load chart and manage engg's rotation.
  • Conduct equipment training for junior engg. in Kuwait & Congo.

FIELD SPECIALIST

M.I.SWACO
Mumbai , Maharashtra
Sep.2007 - Mar.2014
  • Carry out survey and installation of all type of solid control equipments. Preparing survey report for your manager.
  • Maintain all time of solid control equipments at rig site by doing timely maintenance and record it on maintenance worksheet.
  • Generating and sending daily reports to the client by generating it through the M-I Swaco One Trax software.
  • Working on equipments like Centrifuge (Standard and Hydraulic), Vertical Dryer, Mono Pumps, Screw Conveyors etc.

SR. WIRELINE OPERATOR

SCHLUMBERGER ASIA SER.LTD.
Mumbai , Maharashtra
Jan.2003 - Aug.2007
  • Help the Wireline engineer to test wireline tools before and after the job. Carry out maintenance of all wireline tools after the job.
  • Helped TLC operator during the TLC job and running the winch.
  • Loaded the charges in HSD and puncture gun and made it ready for job.
  • Operating the winch while doing running in and pulling out of tools.
  • Making rope socket and keeping ready for job.

ELECTRICAL SUPERVISOR

RELIANCE POWER ENERGY
Mumbai , Maharashtra
Jan.2002 - Dec.2002

Education

ELECTRICAL -

JOSEPH CARDIJN TECHNICAL

Skills

Customer Relations

undefined

Citizenship

INDIAN

Training Licenses Certificates

  • EQUIPMENT TRAINING, BASIC DWM SCHOOL, 06/2008, THAILAND
  • SHAKER & SCREEN + VSAT, 06/2009 MUMBAI & 05/2013, DUBAI
  • EQUIPMENT TRAINING, VERTI-G SCHOOL, 07/2009, THAILAND
  • ONE TRAX TRAINING, 10/2009, MUMBAI
  • EQUIPMENT TRAINING, CSI DRYER TRAINING, 04/2015, ALGERIA
  • MATS TRAINING, 09/2019, UNITED STATES
  • MATS REPAIR TRAINING, 05/2023, UNITED STATES

Countries Worked

INDIA, DUBAI, OMAN (MUSCAT), AZERBAIJAN (BAKU), CONGO

Types Of Wells Worked

Vertical Wells, Oil Wells, HPHT Wells, Deviated Wells, Gas Wells, Off-shore wells, Horizontal Wells, Water Injection Wells, Deepwater Wells

Drilling Fluid Systems Worked

Lime Mud, Salt Saturated Water System, Glycol Mud, Invert Emulsion LT-OBM, Dispersed System, New generation HP mud, Brines / Completion Fluids, Potassium Mud, Non-damaging DIF, Formate Mud, Avapolyoil / DeepDrill, Salt Water System

Problems Encountered

Lost Circulation, Stuck Pipe, Chemical Contamination, H2S Environment, Hole Instability, Formation Kick

Wells Worked

  • RELIANCE - RIG CKR, Dual Port Filtration Unit
  • GSPC - RIG DD-1, CD-518 hydraulic & standard, Verti-G, Mono Pumps & Augers.
  • GSPC - RIG PN#3, Dual Port Filtration Unit.
  • GSPC - RIG ATWOOD BEACON, CD-518 hydraulic, Verti-G, Mono Pumps & Augers.
  • GSPC - RIG WILD CAT, CD-518 hydraulic, Verti-G, Mono Pumps & Augers.
  • BRITISH GAS - RIG ENSCO#53, CD-518 hydraulic & standard & Mono Pump.
  • RELIANCE - RIG BLACKFORD DOLPHIN, CD-518 Standard, Verti-G, Mono Pumps,Augers & Graco pump.
  • BG MUD PLANT, CD-518 Standard, Mono Pumps.
  • RELIANCE MUD PLANT, CD-518 Standard, Mono Pumps.
  • RELIANCE MUD PLANT, Dual Port Filtration Unit.
  • ONGC - RIG PRIDE HAWAII, DE-1000, Nemo Pump.
  • ONGC - RIG G.D.CHETNA, DE-1000, Nemo Pump.
  • ONGC - RIG PLATINUM EXPLORER, CD-518 Standard, Verti-G, Mono Pumps
  • RELIANCE - RIG DID, CD-518 Standard, Verti-G, Mono Pumps, Augers
  • ONGC - RIG DDKG-1, CD-518 hydraulic, Verti-G, Mono Pumps & Augers.
  • ONGC - RIG M.G.HULMES, CD-518 hydraulic, Mono Pumps.
  • ONGC - RIG TRIDENT#2, DE-1000, Nemo Pump
  • ONGC - RIG ABAN ICE, Conduct survey for Verti-G package and Active Centrifuge.
  • ONGC - RIG CHAAYA, Verti-G, 2 x CD-518 FH, 3 x Mono Pump, 2 x Auger.
  • ONGC - RIG NKD, CD 500 & Mono Pump.
  • ONGC - RIG GSF-140, CD-518 Standard, Verti-G, Mono Pumps & Augers.
  • ONGC - RIG SAGAR RATNA, CD-518 hydraulic & standard, Verti-G, Mono Pumps & Augers.
  • BRITISH GAS - RIG G.D.CHETNA, Done Demob
  • CAIRN - RIG 806, Conduct survey for Verti-G package.
  • CAIRN - RIG 807, Conduct survey for Verti-G package.
  • CAIRN - RIG JOHN-18, Conduct survey for Verti-G package.
  • CAIRN - RIG JOHN-29, CD 518, Verti-G, Mono Pumps & Augers.
  • BRITISH GAS - RIG ENSCO#54, CD-518 FH HV & Mono Pump.
  • CAIRN - RIG QUIPPO#5, CD-518 Standard, Verti-G, Mono Pumps,Augers & Graco pump
  • CCED - RIG I-29, Brandt HS-3400, Mono Pumps.
  • ENI - RIG - CAROIL, Carried survey for Centrifuge package (CONGO)
  • ENI - RIG - SAPPHIRE DRILLER, Carried survey for Centrifuge package (CONGO)

General Information

SAWANT, 05/16/80, MUMBAI, Z 5580311, MUMBAI, 06/13/19, 06/12/29, SHARAD B. SAWANT, VISHAL, MARRIED

Timeline

PROJECT MANAGER - SALES

NEWPARK DRILLING FLUIDS INDIA
Oct.2021 - Current

QA Tester

NEWPARK DRILLING FLUIDS INDIA
05.2020 - 02.2024

PROJECT ENGINEER - SALES

NEWPARK DRILLING FLUIDS INDIA
Jan.2018 - Sep.2021

PROJECT ENGINEER -SOLIDS CONTROL

NEWPARK DRILLING FLUIDS INDIA
Mar.2014 - Dec.2017

FIELD SPECIALIST

M.I.SWACO
Sep.2007 - Mar.2014

SR. WIRELINE OPERATOR

SCHLUMBERGER ASIA SER.LTD.
Jan.2003 - Aug.2007

ELECTRICAL SUPERVISOR

RELIANCE POWER ENERGY
Jan.2002 - Dec.2002

ELECTRICAL -

JOSEPH CARDIJN TECHNICAL
Vishal SawantProject Manager - Sales