Results-driven Senior Engineer (Electrical) with 16 years of experience in renewable energy projects, specializing in wind and solar sectors. Expertise includes execution of 132 kV and 33 kV transmission lines, sub-station erection, and transformer testing. Skilled in SCADA integration and project coordination, ensuring operational reliability and compliance with safety and quality standards.

Overview

3
3
Languages
18
18
years of professional experience

Work History

Senior Engineer - RE Hybrid Projects

M/s Adani Infra India Ltd.
11.2023 - Current
  • Handled 33KV UG cable laying, route marking, trench excavation, jointing, and termination with VLF test according to approved standards.
  • Managing feeder charging, SCADA integration, and shutdown activities with full HSE compliance.
  • Handling 33KV UG cable laying, route marking, trench excavation, jointing, termination with VLF test as per approved standards.
  • Developed BOQ, performed quantity estimation, and coordinated billing with planning and commercial teams to ensure accuracy and compliance.
  • Supervising and guiding site engineers, supervisors, and subcontractors to achieve daily and monthly targets.
  • Coordination with design, planning, and commercial teams for material planning, cost control, and schedule adherence.
  • Facilitated project review meetings with management, clients, and EPC partners to ensure alignment and smooth project delivery.
  • Conducting project review meetings with management, clients, and EPC partners for smooth project delivery.
  • Prepared daily progress reports & next day working planning and sent to higher authority.
  • Prepare execution plan, kick-off meeting with all contractors and monitor the same to ensure the smooth operation.

Execution Engineer - Wind Projects

M/s JSW Energy Ltd.
06.2019 - 10.2024
  • Successfully led 33KV overhead line execution and commissioning for 100 MW Dolvi wind project in Solapur Maharashtra.
  • Oversaw material management, vendor coordination, and team supervision to ensure efficient project execution.
  • Planned and monitored project schedules, resources allocation, and work progress to meet targets.
  • Supervised testing and commissioning of (USS) (950V/33KV) with 3.6 MVA transformers and protection systems.
  • Oversaw material management, vendor coordination, and team supervision ensuring smooth execution.
  • Coordinated with clients and departments for inspection and approval processes, ensuring compliance with documentation standards.
  • Executed stringing of power line crossings at various voltage levels, including 400/200/132/33 KV, along with railway and road intersections.
  • Managed BOQ preparation, billing verification, and DPR reporting, facilitating timely project closure.
  • Managed BOQ preparation, billing verification, DPR reporting, and project closure formalities.

Project Engineer - Wind Projects

M/s Renew Power Pvt Ltd.
09.2014 - 05.2019
  • Successfully executed and commissioned total 644 MW renewable projects across Gujarat, Karnataka, and Maharashtra.
  • Led 33KV overhead line execution, including pole erection, stringing, and jumpering activities.
  • Facilitated ROW (Right of Way) clearance, ensuring uninterrupted progress of line execution work.
  • Supervised erection of unit substation (900V/33KV) and conducted testing and commissioning of 3.5 & 3.6 MVA transformers.
  • Coordinated with vendors, contractors, and clients for material management and project approvals.
  • Achieved timely feeder charging and successful project handover across all project sites.
  • Completed job on time by mobilizing manpower and materials according to client specifications.
  • Oversaw the progress and execution of work, ensuring compliance with specifications and safety and quality plans.
  • Handled charging permission from chief electrical inspector (CEI) for substation & transmission line.

Elect.Engineer -Wind Projects

M/s East India Udyog Ltd / Quess Corp Ltd
06.2012 - 08.2014
  • Successfully led commissioning of Adani 321 MW wind project, Ratlam (M.P.)
  • To plan, execute, monitor and control the wind project to ensure the commissioning of project on time.
  • Testing and commissioning of 33KV HT line, 33KV USS/DP yard etc.
  • Handled control SCADA panel, loop checking, testing and feeder charging activities.
  • Ensured contract, ordering, and material procurement schedules for all construction activities.
  • Monitored site activities to ensure compliance with safety and quality regulations.
  • Joint inspection of the line along with quality audit team and asset management team for HOTO process.
  • Initiated project with clear scope and defined responsibilities.
  • Prepared of daily progress reports & next day working planning and sent to my reporting manager.
  • Self-handling charging permission from chief electrical inspector (CEI) for substation & transmission line.
  • Manpower management during the time of work strictly adhering to the ratio to be maintained.
  • Responsible for shutdown LC stringing activities from Govt line crossing as well as Adani PSS.
  • Reviewed and analyzed electrical drawings to ensure accurate implementation.
  • Prepare execution plan, kick off meeting with all contractors and monitor the same to ensure the smooth operation.
  • Adherence to Zero accident safety standards at site.

Site Engineer - Projects

M/s SMEC India Pvt Ltd.
03.2008 - 05.2012
  • Achieved timely charging and commissioning of 132KV & 33KV transmission line with zero safety incident.
  • Facilitated the construction of foundations through various tasks such as excavation and bar binding.
  • Stringing of power line crossings of 400/200/132/33Kv, railway crossing and road crossing (N-H & S-H).
  • Stringing, insulator hosting, rough sag, final sag, paying out of quad conductor with the help of tensioner.
  • Self-handled charging permission from chief electrical inspector (CEI) for substation & transmissions line.
  • Coordinated ROW clearance, ensured safety compliance, and conducted material inspections at site.
  • Prepared daily progress reports, verified BOQs, and managed billing documentation for project tracking.
  • Set the foundation for project execution by clarifying scope and assigning responsibilities.
  • Prepared daily progress reports & next day working planning and sent to my reporting manager.

Education

BE - Electrical

SADTM
Jaipur, India
01-2007

HSC - PCM

A.M.U
Aligarh, U.P
01-2001

SSC - All

C.B.S.E Board
Aligarh, India
03-1998

Skills

Transformer testing & commissioning up to 315 MVA

Transmission line execution

Project management

BOQ preparation

Client relationship management

Team leadership

Leadership skills

Management skills

Adaptability in engineering

Personal Information

  • Father's Name: Mr. Dev Raj Singh
  • Date of Birth: 16-02-1982
  • Marital Status: Married

Career Details

  • M/s Adani Infra India Ltd., Senior Engineer - RE Hybrid Projects, 2023-11-24, Present, Handling 33KV UG cable laying, route marking, trench excavation, jointing, termination with VLF test as per approved standards., Coordination with design, planning, and commercial teams for material planning, cost control, and schedule adherence., Coordination testing & commissioning unit substations up to 5.6 MVA transformers., Preparing BOQ, quantity estimation, and billing in coordination with planning and commercial teams., Monitoring project progress, manpower, and material quality to ensure timely and safe execution., Managing feeder charging, SCADA integration, and shutdown activities with full HSE compliance., Conducting project review meetings with management, clients, and EPC partners for smooth project delivery., Commissioning and HOTO to the operations team of all electrical works., Prepared daily progress reports & next day working planning and sent to higher authority., Handling material reconciliation, documentation, and submission of test reports and commissioning certificates., Supervising and guiding site engineers, supervisors, and subcontractors to achieve daily and monthly targets., Preparing execution plan, kick-off meeting with all contractors and monitoring the same to ensure smooth operation.
  • M/s JSW Energy Ltd., Execution Engineer - Wind Projects, 2019-06-01, 2024-10-31, Successfully led 33KV overhead line execution and commissioning for 100 MW Dolvi wind project in Solapur Maharashtra., Oversaw material management, vendor coordination, and team supervision ensuring smooth execution., Planned and monitored project schedules, resources allocation, and work progress to meet targets., Supervised testing and commissioning of (USS) (950V/33KV) with 3.6 MVA transformers and protection systems., Ensured strict safety and quality compliance during all site activities., Coordinated with clients and departments for inspection, approval, and documentation., Stringing of power line crossings of 400/200/132/33 KV, railway crossing and road crossing (N-H & S-H)., Managed BOQ preparation, billing verification, DPR reporting, and project closure formalities., Achieved timely feeder charging and successful project HOTO within defined timeline and budget.
  • M/s Renew Power Pvt Ltd., Project Engineer - Wind Projects, 2014-09-01, 2019-05-31, Successfully executed and commissioned total 644 MW renewable projects across Gujarat, Karnataka, and Maharashtra., Led 33KV overhead line execution, including pole erection, stringing, and jumpering activities., Handled ROW (Right of Way) clearance and ensured smooth progress of line execution work., Supervised (USS) unit substation (900V/33KV) erection and 3.5 & 3.6 MVA transformer testing and commissioning., Coordinated with vendors, contractors, and clients for material management and project approvals., Achieved timely feeder charging and successful project handover across all project sites., Managed BOQ preparation, billing verification, DPR reporting and HOTO documentation., Responsible for timely completion of job by mobilizing manpower, materials as per the standard specification of client., Monitored the progress, execution of work as per specification and safety and quality plans., Self-handled charging permission from chief electrical inspector (CEI) for substation & transmission line.
  • M/s East India Udyog Ltd / Quess Corp Ltd, Elect.Engineer - Wind Projects, 2012-06-01, 2014-08-31, Successfully led commissioning of Adani 321 MW wind project, Ratlam (M.P.)., To plan, execute, monitor and control the wind project to ensure the commissioning of project on time., Testing and commissioning of 33KV HT line, 33KV USS/DP yard etc., Handled control SCADA panel, loop checking, testing and feeder charging activities., To ensure the contract / ordering / material procurement schedule of all construction activities and materials., Supervision of the work in site as per the safety and quality norms., Joint inspection of the line along with quality audit team and asset management team for HOTO process., To ensure the proper initiation of project with clear scope and responsibility., Prepared daily progress reports & next day working planning and sent to my reporting manager., Self-handled charging permission from chief electrical inspector (CEI) for substation & transmission line., Manpower management during the time of work strictly adhering to the ratio to be maintained., Responsible for shut down LC stringing activities from Govt line crossing as well as Adani PSS., Reading of electrical drawings., Prepared execution plan, kick-off meeting with all contractors and monitored the same to ensure smooth operation., Self-handled charging permission from chief electrical inspector (CEI) for substation & transmission line., Adherence to Zero accident safety standards at site.
  • M/s SMEC India Pvt Ltd., Site Engineer - Projects, 2008-03-01, 2012-05-31, Supervised 132KV & 33KV single circuit and double circuit Transmission line erection and stringing., Foundation (Pit marking, Excavation, Stub setting, Bar Binding, Concreting etc.)., Stringing, insulator hosting, rough sag, final sag, paying out of quad conductor with the help of tensioner., Stringing of power line crossings of 400/200/132/33Kv, railway crossing and road crossing (N-H & S-H)., Self-handled charging permission from chief electrical inspector (CEI) for substation & transmission line., Coordinated for ROW clearance, safety compliance, and material inspection at site., Prepared daily progress reports (DPR), BOQ verification, and billing documentation., Achieved timely charging and commissioning of 132KV & 33KV transmission line with zero safety incident., To ensure the proper initiation of project with clear scope and responsibility., Prepared daily progress reports & next day working planning and sent to my reporting manager.

Personal data processing

I hereby declare that all the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars.

Timeline

Senior Engineer - RE Hybrid Projects

M/s Adani Infra India Ltd.
11.2023 - Current

Execution Engineer - Wind Projects

M/s JSW Energy Ltd.
06.2019 - 10.2024

Project Engineer - Wind Projects

M/s Renew Power Pvt Ltd.
09.2014 - 05.2019

Elect.Engineer -Wind Projects

M/s East India Udyog Ltd / Quess Corp Ltd
06.2012 - 08.2014

Site Engineer - Projects

M/s SMEC India Pvt Ltd.
03.2008 - 05.2012

HSC - PCM

A.M.U

BE - Electrical

SADTM

SSC - All