Zeeshan Ali Khan to excel with the organization and to contribute to the organization by consistently achieving target through the efficient and effective utilization of skills and building long term relationship with prospective clients.
Role and Responsibility
Handling activities right from the conceptualization stage of project designing; involving scheduling, progress monitoring
finalization of design basis & technical specifications.
Oversee design reviews of EPC drawings, ensuring safety, quality, and long-term project performance.
Establishing project review, managing project documentation & man-hour estimation, monitoring & status reporting of progress of design & engineering of the project.
Project Planning and Monitoring of ground mount project.
To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning.
Provide technical direction or support to installation teams during installation, start-up, testing, system commissioning, or performance monitoring.
Oversee design reviews of EPC drawings, ensuring safety, quality, and long-term project performance.
Vendor selection for I&C and Procurement of Material.
Coordinate with various contractor sub-Contractor and Vendor.
Support and coordinate with logistic & commercial for smooth execution of project.
Expedite Procurement: Ensure timely procurement of materials by proactively following up with suppliers and negotiating favorable terms
Execution Planning Develop detailed project execution plans, including timelines, milestones, and resource allocation to ensure on-time and within-budget completion.
Manpower Planning efficiently organize and allocate manpower to maximize productivity and meet project demands.
Resolve Execution Queries Promptly address and resolve on-site execution queries and issues, providing guidance and support to the site team.
Project Execution:
Ground Mount
Construction of Solar Ground Mount Project of 45MWp, 0.6/33kV Voltage Grade, Lalitpur, Uttar Pradesh.
Construction of Solar Ground Mount Project of 50MWp, 0.8/33kV Voltage Grade, Bijnor Uttar Pradesh.
Construction of Solar Ground Mount Project of 45MW of 0.415/11kV Voltage Grade, Narkatiyaganj, Bihar.
Construction of Solar Ground Mount Project of 35MW of 0.400/33kV Voltage Grade, Dhule Maharashtra.
Construction of Solar Ground Mount Project of 20MW of 0.400/11kV Voltage Grade, Bhopal M.P.
Role and Responsibility
Design documents review like BOQ, SLD, Layouts etc.
Managing / supporting solar project developments internationally (mainly in the megawatt scale)
Working effectively on several projects concurrently to deliver to tight deadlines.
Preparation of Project execution plan and daily progress report.
Responsible for complete project management though the installation, testing and commissioning of the PV system.
Complete DC and AC package of civil and Electrical work.
All kind of documentation work related to job responsibility.
Continuously support and guide the site team, fostering a collaborative environment and ensuring adherence to project specifications and standards.
Motivate to team for optimum output, maximum utilization of resource & manage and perform well in project execution.
Ensure dispatch of material as per given schedule.
Meeting with SSE, SDO and XEN of respective DISCOM for grid feasibility report and coordinate with HO
Project Execution:
Roof top
Construction of Solar Rooftop Project of REMCL 4.5MW of Agra, Mathura & Jhansi Region.
Construction of Solar Rooftop Project of REMCL 4.2MW of Chitranjan Locomotive West Bengal.
Construction of Solar Rooftop Project of 3MW of different location in Jalgaon, Maharashtra
Construction of Solar Rooftop Project of REMCL 1.5MW of Western Railway Mumbai.
Construction of Solar Rooftop Project of REMCL 1.2MW of different location of Odisha
Construction of Solar Rooftop Project of REMCL 114kWp of Bikaner Rajasthan.
Construction of Solar Rooftop Project of SECI project of 4.5MW of Rajasthan, Chandigarh and Uttar Pradesh
Construction of Solar Rooftop Project of Jawahar Navoday Vidyalay of 3MW in 45 different District in Uttar Pradesh
Worked at lead construction Engineer of 1.5 MW plant Asahi India Glass Bawal.
Handle construction EPC Project of 300kWp IEC College in greater Noida.
Project Handle :
Approx. 50MW rooftop projects spread across 17 states is being handled efficiently Projects include Wal-Mart, Kochi Metro, and Delhi Metros. CPWD, Hero motor Corps, Crest Chandigarh. Etc.
12MW Ground Mount O&M projects 0.415/11kV Voltage Grade at M.P.
Approx. 40MW rooftop and Ground Mount O&M projects spread across Punjab, Chandigarh, Jammu and Himachal Pradesh.
9MW SECI and Indian Railway Rooftop and O&M projects spread across Haryana.
Operation and Maintenance Activity
Plant startup and shut-down monitoring.
PV Syst simulation to assess PR estimation, CUF calculation, shading analysis etc.
Inputs on design to improve the system.
Right Technology Selection at Right Place
Generation estimation & analysis using several techniques like clipping analysis, Overloading analysis, shading analysis, optimum tilt analysis incorporating pitch.
Strong Association with Major Suppliers in Solar Value Chain to understand & compare the cost & quality of the project.
Technical audit of the running plant.
Identifies problems and develops corrective action plans
Scheduling and execution of preventive and predictive maintenance
Record and report all faults, deficiencies, and other unusual occurrences, as well as the time and materials expended on work orders. Responsible for all required repairs, maintenance, and monitoring of all warranty claims
Outage communication and management.
Warranty terms assessment for equipment.
Tracking of ongoing performance.
Role and Responsibility
Monitored Key Performance Indicators (KPIs) such as traffic analysis, dropped calls, blocked calls, handovers and channel congestion.
To perform various drive tests including Single Site verifications, Cluster drives,
Optimization drives to check network performance during continuous and discontinuous voice and data calls.
Performing cluster drive to check the coverage holes, handover problems and site overshooting.
To verify sector azimuths, sector Parameter and antenna Heights.
Deciding the Antenna azimuths (Alpha, Beta, Gamma) for good coverage surrounding the site (Clusters)
Cluster drive. (2300, 1800 & 850 MHZ).
Drive test & Network Analysis (XCAL AUTO CALL) (2300 & 1800 MHZ)
Acceptance test procedure (ATP) 11A & 11B.
E Node B Installation.
Basic knowledge in C, VHDL, MS OFFICE
Professional Experience: 10+ Years
A performance driven Renewable cum Electrical Engineer having experience in Project EPC & Operation & maintenance.